My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - 2525 N MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
75D - PH - 2525 N MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:54:38 PM
Creation date
11/14/2019 5:55:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2525 North Main Street <br />October 28, 2019 <br />Page 10 <br />and discussed in the Final EIR. As previously concluded, aesthetics remains a significant and <br />unavoidable impact after mitigation. The projected population is estimated to be 502 residents, <br />which is a reduction of 453 residents from the original 496-unit project. In addition, the number of <br />daily trips is projected to be reduced to 1,512 trips, a reduction of 1,186 trips projected forthe 496- <br />unit project. Water demands are reduced to 69.09 acre feet per year, which is a reduction of 62.44 <br />acre feet per year. Based on the fact that the October modified project did not have or create any <br />impacts that were not previously studied and disclosed, recirculation of the EIR is not required for <br />the modified project pursuant to State CEQA Guidelines Section 15088.5 (Exhibit 1). <br />Development Agreement <br />Due to a reduction in the size of the project and the elimination of the need for a land exchange with <br />the City, the applicant is proposing to amend the terms of the development agreement (Exhibit 2). <br />The agreement is a legal contract between the developer and the City that defines the terms and <br />nature of development proposed for the project site. Highlights of the revised DA include: <br />1. Term of Agreement. The terms of the agreement remain the same. The right to build <br />the project as entitled for a period of four years, with an opportunity for up to two, <br />consecutive one-year extensions. Extensions shall be subject to approval by both the <br />Owner and the City Manager. Prior to granting an extension, the Owner shall pay <br />$50,000 to the City's General Fund to compensate the City for lost revenue to be <br />received by the City had the project been completed within the first four years. <br />2. Public Art. The inclusion of public art remains the same. The Owner shall create, install, <br />and maintain a public art project with a value equivalent to 0.5% of the total construction <br />cost of the project. The work(s) of art shall be in place prior to issuance of the first <br />certificate of occupancy for the project and shall be maintained in perpetuity by the <br />property owner. <br />3. Modification to the Santiago Park Improvement. The term to construct park <br />improvements up to $1,400,000 remains. However, the terms have been modified to <br />propose that the City and developer equally share in the cost of the Santiago Park <br />improvements. The developer will be responsible to front the cost of construction and <br />construct the park improvements and contribute up to 50% of the estimated construction <br />cost ($700,000). The City's 50% portion would be repaid over a period of three years. <br />These park improvements include, but are not limited to, installation of irrigation, <br />landscaping, security lighting and bike trail enhancements to Santiago Park. <br />4. Modification to the Park Santiago Neighborhood Benefits Package. The developer <br />has eliminated the on -site Amazon lockers from the benefit package. The developer has <br />retained the terms to provide Park Santiago Neighborhood residents with access to on - <br />site amenities, 24-hour roving security patrol within the Park Santiago Neighborhood <br />and Santiago Park as shown on Exhibit H to the Development Agreement for a 55-year <br />period unless determined during an annual review that the term shall end earlier. <br />
The URL can be used to link to this page
Your browser does not support the video tag.