Laserfiche WebLink
3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name Phase Type Start Date End Date Num Days <br />Week <br />Num Days Phase Description <br />1 Demolition Demolition 3/2/2020 3/27/2020 5 20 <br />2 Site Preparation Site Preparation 3/28/2020 9/30/2020 5 133 <br />3 Building Construction Building Construction 10/1/2020 12/15/2021 5 315 <br />4 Paving Paving 2/16/2022 3/1/2022 5 10 <br />5 Architectural Coating Architectural Coating 8/2/2021 2/15/2022 5 142 <br />OffRoad Equipment <br />ROG NOx CO SO2 Fugitive <br />PM10 <br />Exhaust <br />PM10 <br />PM10 <br />Total <br />Fugitive <br />PM2.5 <br />Exhaust <br />PM2.5 <br />PM2.5 <br />Total <br />Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e <br />Percent <br />Reduction <br />0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Residential Indoor: 445,500; Residential Outdoor: 148,500; Non-Residential Indoor: 20,025; Non-Residential Outdoor: 6,675; Striped Parking <br />Area: 7,968 (Architectural Coating ±sqft) <br />Acres of Grading (Site Preparation Phase): 1.7 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 11/15/2019 11:10 AMPage 7 of 30 <br />4TH & Main Mixed-Use Project - Orange County, Winter