My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-107 - Proposed Addington Multi-Family Residential Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-107 - Proposed Addington Multi-Family Residential Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:22 AM
Creation date
11/25/2019 11:00:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-107
Date
11/19/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding: Less than significant impact. (DEIR, p. 2-8; Initial Study, pp. 63-64.) <br />Facts in Support of Finding: The multi -family residential land uses proposed by the Project are not <br />anticipated to discharge wastewater that contains harmful levels of toxins that are regulated by the <br />Regional Water Quality Control Board (RWQCB), and all effluent would comply with the wastewater <br />treatment standards of the RWQCB. (Initial Study, pp. 63-64.) <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (Initial Study, pp. 63-64.) This conclusion <br />also applies, for the same reasons, to the Modified Project <br />9.16.2 New Infrastructure and Adequate Capacity <br />Threshold: Would the Project result in the construction of new water or wastewater treatment <br />facilities, or expansion of existing facilities, the construction of which could cause significant <br />environmental effects? <br />Finding: Less than significant impact. (DEIR, p. 4.13-6 through 4.13-7.) <br />Facts in Support of Finding: The Project would not result in the construction of new water or wastewater <br />treatment facilities, or expansion of existing facilities, the construction of which could cause significant <br />environmental effects. As discussed in Section 4.13, Utilities and Service Systems, of the DEIR, the Project <br />would receive water supplies through the existing 16-inch water lines located within the N. Main Street <br />and Edgewood Road rights -of -way that have the capacity to provide the increased water supplies needed <br />to serve the Project; no extensions or expansions to the water pipelines that convey water to the Project <br />site would be required. Redevelopment of the existing onsite water distribution lines would only serve the <br />Project and would not provide water to any off -site areas. (DEIR, p. 4.13-6 through 4.13-7.) This <br />conclusion also applies, for the same reasons, to the Modified Project <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (DEIR, p. 4.13-6 through 4.13-7.) <br />9.16.3 Storm Water Drainage Requirements <br />Threshold: Would the Project result in the construction of new storm water drainage facilities or <br />expansion of existing facilities, the construction of which could cause significant environmental effects? <br />Finding: Less than significant impact. (DEIR, p. 2-8; Initial Study, p. 64.) <br />Facts in Support of Finding: The Project site is largely impervious, as it is generally covered by <br />pavement or the building structure, and small areas of landscaping surround the development. The Project <br />would redevelop the site for multi -family residential uses, which would include areas of landscaping that <br />would surround the proposed structures and be located along the site boundary, similar to the areas of <br />landscaping that currently exist. Redevelopment of the site would provide for a similar amount of <br />impervious surface; thus, the rate or amount of surface runoff would not substantially increase with <br />implementation of the Project. hi addition, the Project includes redevelopment of the existing onsite <br />drainage system that would accommodate runoff with infiltration basins, storm drains, and catch basins <br />Resolution No. Page 54 of 76 <br />Certification of the Magnolia at the Park EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.