Laserfiche WebLink
CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 30 Date: 11/15/2019 11:10 AM <br />4TH & Main Mixed -Use Project - Orange County, Winter <br />ROG <br />NOx <br />CO <br />S02 <br />Fugitive <br />Exhaust <br />PM10 <br />Fugitive <br />Exhaust <br />PM2.5 <br />Bio- CO2 <br />NBio-0O2 <br />Total CO2 <br />CH4 <br />N20 <br />CO2e <br />PM10 <br />PM10 <br />Total <br />PM2.5 <br />PM2.5 <br />Total <br />Percent <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Reduction <br />3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name <br />Phase Type <br />Start Date <br />End Date <br />Num Days <br />Week <br />Num Days <br />Phase Description <br />1 •Demolition !Demolition <br />!3/2/2020 <br />13/27/2020 <br />5 <br />20 <br />i <br />i <br />2 Site Preparation +Site Preparation <br />! 3/28/2020 <br />i 9/30/2020 <br />5 <br />133 <br />i <br />i <br />3 •Building Construction +Building Construction <br />!10/1/2020 <br />:12/15/2021 <br />5: <br />315: <br />i <br />i <br />4 :Paving +Paving <br />!2/16/2022 <br />i3/1/2022 <br />5 <br />10: <br />+ <br />I <br />i <br />5 -Architectural Coating :Architectural Coating <br />-8/2/2021 <br />-2/15/2022 <br />5, <br />142- <br />Acres of Grading (Site Preparation Phase): 1.7 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />Residential Indoor: 445,500; Residential Outdoor: 148,500; Non -Residential Indoor: 20,025; Non -Residential Outdoor: 6,675; Striped Parking <br />Area: 7,968 (Architectural Coating — sgft) <br />OffRoad Equipment <br />