My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - C.S LEGACY FOR CIVIC CENTER IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/17/2019
>
23C - C.S LEGACY FOR CIVIC CENTER IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 5:43:32 PM
Creation date
12/12/2019 5:34:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
12/17/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 4 <br />Civic Center <br />Improvements (18-2679 & 18-2680), bidding on September 18, 2019 2:00 PM (Pacific) <br />Printed 12/09/2019 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />35 <br />Electrical Power Feed <br />LS <br />1 <br />$7,105.00 <br />$7,105.00 <br />36 <br />Steamped Concrete Paving <br />SF <br />660 <br />$13.80 <br />$9,108.00 <br />37 <br />Law Rail Wood Fence <br />LF <br />305 <br />$73.00 <br />$22,265.00 <br />38 <br />Steel Edging <br />LF <br />435 <br />$25.00 <br />$10,875.00 <br />39 <br />Bird Mesh <br />LS <br />1 <br />$39,830.00 <br />$39,830.00 <br />40 <br />Tectum Panels <br />EA <br />700 <br />$130.71 <br />$91,497.00 <br />41 <br />Remove and Replace Non -Structural Lumber <br />LS <br />1 <br />$85,143.00 <br />$85,143.00 <br />42 <br />Remove and Replace Structural Lumber <br />EA <br />25 <br />$4,170.00 <br />$104,250.00 <br />43 <br />Furring and Trim <br />EA <br />30 <br />$1,162.00 <br />$34,860.00 <br />44 <br />Power Wash Flagstone Paving <br />LS <br />1 <br />$3,089.00 <br />$3,089.00 <br />45 <br />Replace Missing Flagstone Paving <br />LS <br />1 <br />$2,110.00 <br />$2,110.00 <br />46 <br />Clean, Prepare and Paint Existing Structure <br />LS <br />1 <br />$39,472.00 <br />$39,472.00 <br />47 <br />Install New Infrastructure for Lighting <br />LS <br />1 <br />$7,449.00 <br />$7,449.00 <br />48 <br />New Light Fixtures <br />EA <br />10 <br />$1,453.00 <br />$14,530.00 <br />49 <br />Soil Preparation and Fine Grading <br />SF <br />2775 <br />$1.00 <br />$2,775.00 <br />50 <br />Irrigation <br />SF <br />3400 <br />$5.53 <br />$18,802.00 <br />23C-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.