Laserfiche WebLink
Exhibit 10-H1 Cost Proposal Attachment <br />Consultant: Tetra Tech Project No: RFP No. 19-110 Date: 12/20/2019 <br />DIRECT LABOR CONTINUED <br />Classification/Title <br />Name <br />Hours <br />Actual Hourly Rate <br />Total <br />Land Surveyor* <br />Dan Helt <br />8 <br />$69.67 <br />$557.36 <br />Mid. Roadway Engineer* <br />Tyler Parra <br />376 <br />$42.31 <br />$15,908.56 <br />Mid. Drainage/LID Engineer* <br />Chris Jansen <br />288 <br />$40.00 <br />$11,520.00 <br />Mid. Civil Designer <br />Anthony Ramos <br />340 <br />$34.68 <br />$11,791.20 <br />Jr. Civil Designer <br />Manuel Leon <br />140 <br />$30.21 <br />$4,229.40 <br />CAD Designer <br />David Lopez <br />440 <br />$29.81 <br />$13,116.40 <br />Survey Office Technician <br />I Mark Lawler <br />1 28 <br />1 $37.25 <br />$1,043.00 <br />2-Person Survey Crew(Prevailing Wage)** <br />2-Person Survey Crew <br />112 <br />$102.27 <br />$11,454.24 <br />2-Person Survey Crew (Travel) <br />2-Person Survey Crew <br />14 <br />$77.92 <br />$1,090.88 <br />Project Assistant <br />Carol Kondo <br />49 <br />$28.09 <br />$1,376.41 <br />Total <br />$72,087.45 <br />25K-73 <br />