My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STATE OF CALIFORNIA TRANSPORTATION COMMISSION (2)
Clerk
>
Contracts / Agreements
>
S
>
STATE OF CALIFORNIA TRANSPORTATION COMMISSION (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:48:16 AM
Creation date
1/21/2020 3:30:13 PM
Metadata
Fields
Template:
Contracts
Company Name
STATE OF CALIFORNIA TRANSPORTATION COMMISSION
Contract #
A-2019-225
Agency
Public Works
Council Approval Date
11/19/2019
Destruction Year
P
Notes
Permanent Record
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />STATE OF CALIFORNIA s DEPARTMENT OF TRANSPORTATION <br />PROJECT PROGRAMMING REQUEST <br />DTP-0001 (Revised July 2017) General Instructions <br />Amendment (Existing Project) No I Date: 1017/19 <br />District <br />I EA <br />I Project ID <br />PPNO <br />T MP ID Alt pro(. ID <br />12 <br />County <br />Route/Corridor <br />PM B <br />PM Ahd <br />Projec sponsor/Lead Agency <br />ORA <br />Warner <br />N/A <br />N/A <br />Ci!4 of Santa Ana <br />MPO Element - <br />SCAG I Local Assistance <br />Prc act Mana er/Contact <br />Phone <br />E-mail Address <br />Cor Wilkerson <br />14 647-6043 <br />cwflkerson(@santa-ana.or <br />Project Title- <br />Wamer Avenue Class II <br />Location (Project Limits), Descriptiofi't Scope of Work) <br />This project will construct an approximately 0.65 mile long Class it Bikeway along Warner Avenue, from Wright Street, <br />over State Route 55 (SR-55), to Red Hill Avenue. The Warner Avenue project will bridge a gap between funded future <br />bikeways west of Wright Street in the City of Santa Ana, and existing facilities east of Red Hill Avenue in the City of Tustin. <br />Im lemen in A encCit <br />of Santa na <br />a <br />Ci of Santa Ana <br />NIA <br />City of Santa Ana <br />Legislative Districts - - <br />ssembl : fiS Senate: 34 congressional: 40 <br />Project benefits - - <br />The project will close a gap in bikeways since the City of Santa Ana has a funded project to provide Class II bike lanes <br />between Main Street and Wright Street. The proposed projectwiil extend Class II bike lanes easterly from Wright Street, <br />over SR-55 and to Red Hill Avenue where on -street bike lanes exist on Warner Avenue. Additionally, funding for on -street <br />bike lanes are proposed for Red Hill Avenue so this project component will link to existing bike lanes on either side of SR- <br />55 and bD the parallel roadway (Red Hill Avenue). The new crossing of SR-55 is needed in this area to better serve <br />access to City of Tustin jobs at Tustin Legacy and City of Santa Ana residential uses west of SR-55. <br />Purpose and Need <br />Orange County has one of the highest rates of bicycle and pedestrian injuries in the State of California. OCTA is currently <br />completing the OC Active, a countywide active transportation plan. The preliminary results show high concentrations of <br />bicycle and pedestrian needs in and around the Central County Corridor, <br />Category <br />outputs/outcomes <br />Unit <br />Total <br />Local Streets and Reads <br />Bicycle [anal sidewalk miles <br />Miles <br />0.65 <br />ADA Improvements No <br />Bike/red Improvements yes Reversible <br />4aneanalysis ':No <br />Includes Sustainable Communities Strategy Goals yes Reduces Greenhouse Gas Emissions yes <br />Proec Milestone <br />Exlstin <br />Pro used <br />Project Study Report Approved <br />N/A <br />Begin Environmental (PA&ED) Phase <br />N/A <br />Circulate Draft Environmental Document Document T e CE <br />N/A <br />Draft Project Report <br />N/A <br />End Environmental Phase (PA&ED Milestone) <br />NIA <br />Be in Desi n PS111 Phase <br />7/1/2020 <br />End signPhase (Read to List for Advertisement Milestone) <br />6/3O/2021 <br />Begin <br />Right of Way Phase <br />NIA <br />End <br />Right of Way Phase (RightofWay Certification Milestone <br />N/A <br />Begin Construction Phase (Contract Award Milestone) <br />12/31/2021 <br />End Construction Phase Construction Contract Acceptance Milestone) <br />12/3012023 <br />Begin Closeout Phase <br />12/30/2023 <br />End Closeout Phase (Closeout Report) <br />6/3012024 <br />ADA Notice fo moinauaiswmsensory alsapllltles, isle aocumem SaVaNable In ailernale formals. For lreonnation call (916) 654-641D or TOD(916) 6544a80 or <br />mile Records and Forms Management, 1120 N Street, M8-69. Sacramento, CA 86814. <br />
The URL can be used to link to this page
Your browser does not support the video tag.