My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (3)
Clerk
>
Contracts / Agreements
>
L
>
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:29:20 AM
Creation date
1/29/2020 11:17:27 AM
Metadata
Fields
Template:
Contracts
Company Name
LANDSCAPE WEST MANAGEMENT SERVICES, INC.
Contract #
A-2020-003
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/21/2020
Expiration Date
12/31/2024
Insurance Exp Date
4/1/2020
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
overgrowth into passageways, walks, streets, view of signs or in any manner <br />deemed objectionable by the Director's Representative. Dead or damaged <br />limbs shall be removed so that no projections or stubs remain. <br />Pruning/trimming shall be clone by hand pruners, shears or loppers in a <br />manner to permit plants to grow naturally in accordance with their normal <br />growth characteristics. "Box hedging" may be required on some shrubs, as <br />designated by the Director's Representative. "Box hedged" plants will be <br />required to have all five sides level and straight to the satisfaction of the <br />Director's Representative. In order to achieve straight and level lines of <br />shrubs the Contractor shall run string lines to assure straight pruning. Shear <br />hedging or severe pruning/trirmning of plants, unless authorized by the <br />Director's Representative, is not permitted. Topping of plants whose <br />natural growth stems From the base of the plant is not permitted. Should the <br />Contractor top, shear hedge or severely prune plants and disfigure or <br />damage the plants, the Contractor shall be responsible for replacing those <br />plants with like kind and size, subject to approval by the Director's <br />Representative. The Contractor may be requested from time to time to raise <br />the bottom of the shrubs for security reasons. <br />2.2.2 Mulching of Bare Areas <br />2.2.2.1 In all shrub areas where bare soil is visible the Contractor shall apply US <br />Composting Council STA tested and approved compost mulch 3"- 4" minus <br />by 2" thick minimum twice per year (third week of January and July) and <br />as necessary to maintain uniform and complete coverage. Leaf litter and <br />other organic materials other than mulch shall be removed on a continuous <br />basis. <br />2.2.2.2 All bare soil areas shall be cultivated to 6" deep on a weekly basis while <br />awaiting fresh mulch. <br />2.3 Vine Care and Services <br />2.3.1 Maintenance <br />2.3.1.1 Contractor shall trim the vine continuously and once it reaches the top of <br />the wall or at a specific height on the wall, as determined by the Director's <br />Representative, the Contractor shall not allow the vine to encroach above <br />the designated height. The Contractor shall also prune the vine back to the <br />wall to reduce the width and weight of the vine. The Contractor shall keep <br />vines off telephone poles, plant material or other non -wall surfaces at all <br />times. <br />2.3.2 Planting <br />2.3.2.1 The Contractor shall plant each year as a part of the base agreement (at <br />his/her expense) 200-1 gallon ParthenociSSrrS tricuspidata (Boston Ivy) vines <br />at 15' on center. The Contractor shall coordinate with Irrigation Consultant <br />to assure the now vines receive adequate irrigation. The Contractor will <br />bring to the Director's Representative immediately when any vine is <br />City of Santa Ana RFP 19-092 <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.