Laserfiche WebLink
HCM 6th Signalized Intersection Summary <br />7: Main St & Santiago Park/Walkie Way 09/03/2019 <br />The Addington 09/03/2019 Year 2040 Conditions - PM Peak hour Synchro 10 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 9 0 24 0 0 0 28 1731 0 1 1781 2 <br />Future Volume (veh/h) 9 0 24 0 0 0 28 1731 0 1 1781 2 <br />Initial Q (Qb), veh 0 00000000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 9 0 25 0 0 0 29 1822 0 1 1875 2 <br />Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Percent Heavy Veh, % 2 22222222222 <br />Cap, veh/h 676 0 548 0 647 0 37 2695 0 2 2678 3 <br />Arrive On Green 0.35 0.00 0.35 0.00 0.00 0.00 0.02 0.53 0.00 0.00 0.51 0.51 <br />Sat Flow, veh/h 1781 0 1585 0 1870 0 1781 5274 0 1781 5268 6 <br />Grp Volume(v), veh/h 9 0 25 0 0 0 29 1822 0 1 1212 665 <br />Grp Sat Flow(s),veh/h/ln1781 0 1585 0 1870 0 1781 1702 0 1781 1702 1869 <br />Q Serve(g_s), s 0.4 0.0 1.3 0.0 0.0 0.0 1.9 31.4 0.0 0.1 32.6 32.6 <br />Cycle Q Clear(g_c), s 0.4 0.0 1.3 0.0 0.0 0.0 1.9 31.4 0.0 0.1 32.6 32.6 <br />Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 1.00 0.00 <br />Lane Grp Cap(c), veh/h 676 0 548 0 647 0 37 2695 0 2 1730 950 <br />V/C Ratio(X) 0.01 0.00 0.05 0.00 0.00 0.00 0.79 0.68 0.00 0.51 0.70 0.70 <br />Avail Cap(c_a), veh/h 676 0 548 0 647 0 193 2695 0 193 1730 950 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.41 0.41 0.41 <br />Uniform Delay (d), s/veh25.8 0.0 26.1 0.0 0.0 0.0 58.5 20.8 0.0 59.9 22.5 22.5 <br />Incr Delay (d2), s/veh 0.0 0.0 0.2 0.0 0.0 0.0 29.9 1.4 0.0 66.4 1.0 1.8 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln0.2 0.0 0.5 0.0 0.0 0.0 1.2 12.5 0.0 0.1 12.9 14.4 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 25.8 0.0 26.2 0.0 0.0 0.0 88.4 22.2 0.0 126.3 23.5 24.3 <br />LnGrp LOS C A C A A A F C A F C C <br />Approach Vol, veh/h 34 0 1851 1878 <br />Approach Delay, s/veh 26.1 0.0 23.2 23.8 <br />Approach LOS C C C <br />Timer - Assigned Phs 2 3 4 6 7 8 <br />Phs Duration (G+Y+Rc), s 46.5 7.5 66.0 46.5 5.1 68.3 <br />Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 <br />Max Green Setting (Gmax), s 31.0 13.0 61.0 31.0 13.0 61.0 <br />Max Q Clear Time (g_c+I1), s 3.3 3.9 34.6 0.0 2.1 33.4 <br />Green Ext Time (p_c), s 0.1 0.0 16.3 0.0 0.0 16.9 <br />Intersection Summary <br />HCM 6th Ctrl Delay 23.6 <br />HCM 6th LOS C <br />2-377