Laserfiche WebLink
HCM 6th Signalized Intersection Summary <br />11: Main St & Buffalo Ave/I-5 SB On-Ramp 09/03/2019 <br />The Addington 09/03/2019 Year 2040 Conditions - PM Peak hour Synchro 10 Report <br />Page 8 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 369 177 49 00001721 54 721 1266 0 <br />Future Volume (veh/h) 369 177 49 00001721 54 721 1266 0 <br />Initial Q (Qb), veh 0 0 0 000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No <br />Adj Sat Flow, veh/h/ln 1900 1870 1900 0 1870 1870 1870 1870 0 <br />Adj Flow Rate, veh/h 388 186 52 0 1812 57 759 1333 0 <br />Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Percent Heavy Veh, % 0 2 0 022220 <br />Cap, veh/h 403 318 89 0 1901 60 799 3376 0 <br />Arrive On Green 0.23 0.23 0.23 0.00 0.37 0.37 0.46 1.00 0.00 <br />Sat Flow, veh/h 1781 1406 393 0 5254 160 3456 5274 0 <br />Grp Volume(v), veh/h 388 0 238 0 1212 657 759 1333 0 <br />Grp Sat Flow(s),veh/h/ln1781 0 1800 0 1702 1842 1728 1702 0 <br />Q Serve(g_s), s 17.2 0.0 9.4 0.0 27.7 27.8 16.8 0.0 0.0 <br />Cycle Q Clear(g_c), s 17.2 0.0 9.4 0.0 27.7 27.8 16.8 0.0 0.0 <br />Prop In Lane 1.00 0.22 0.00 0.09 1.00 0.00 <br />Lane Grp Cap(c), veh/h 403 0 407 0 1272 688 799 3376 0 <br />V/C Ratio(X) 0.96 0.00 0.58 0.00 0.95 0.95 0.95 0.39 0.00 <br />Avail Cap(c_a), veh/h 403 0 407 0 1272 688 799 3376 0 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 <br />Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 0.35 0.35 0.00 <br />Uniform Delay (d), s/veh30.6 0.0 27.6 0.0 24.4 24.4 21.1 0.0 0.0 <br />Incr Delay (d2), s/veh 35.1 0.0 2.1 0.0 16.2 24.7 9.6 0.1 0.0 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln11.0 0.0 4.2 0.0 13.2 16.0 5.5 0.0 0.0 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 65.7 0.0 29.7 0.0 40.6 49.1 30.7 0.1 0.0 <br />LnGrp LOS E A C A D D C A A <br />Approach Vol, veh/h 626 1869 2092 <br />Approach Delay, s/veh 52.0 43.6 11.2 <br />Approach LOS D D B <br />Timer - Assigned Phs 1 2 4 6 <br />Phs Duration (G+Y+Rc), s23.0 34.4 22.6 57.4 <br />Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 <br />Max Green Setting (Gmax), s18.5 29.9 18.1 52.9 <br />Max Q Clear Time (g_c+I1), s18.8 29.8 19.2 2.0 <br />Green Ext Time (p_c), s 0.0 0.1 0.0 14.0 <br />Intersection Summary <br />HCM 6th Ctrl Delay 30.0 <br />HCM 6th LOS C <br />2-379