My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
10-28-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:48:34 PM
Creation date
2/13/2020 2:42:15 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
930
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th Signalized Intersection Summary <br />7: Main St & Santiago Park/Walkie Way 09/13/2019 <br />The Addington 09/03/2019 Year 2040 With Option E - Main St/Walkie Way and Surface Parking - PM Peak hour Synchro 10 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 9 0 24 29 0 19 32 1731 45 31 1781 2 <br />Future Volume (veh/h) 9 0 24 29 0 19 32 1731 45 31 1781 2 <br />Initial Q (Qb), veh 0 00000000000 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 9 0 25 31 0 20 34 1822 47 33 1875 2 <br />Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Percent Heavy Veh, % 2 22222222222 <br />Cap, veh/h 387 0 345 50 0 45 43 2953 76 42 3035 3 <br />Arrive On Green 0.22 0.00 0.22 0.03 0.00 0.04 0.02 0.58 0.58 0.02 0.58 0.58 <br />Sat Flow, veh/h 1781 0 1585 1781 0 1585 1781 5119 132 1781 5268 6 <br />Grp Volume(v), veh/h 9 0 25 31 0 20 34 1211 658 33 1212 665 <br />Grp Sat Flow(s),veh/h/ln1781 0 1585 1781 0 1585 1781 1702 1847 1781 1702 1869 <br />Q Serve(g_s), s 0.5 0.0 1.6 2.2 0.0 1.6 2.5 30.4 30.4 2.4 30.5 30.5 <br />Cycle Q Clear(g_c), s 0.5 0.0 1.6 2.2 0.0 1.6 2.5 30.4 30.4 2.4 30.5 30.5 <br />Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.07 1.00 0.00 <br />Lane Grp Cap(c), veh/h 387 0 345 50 0 45 43 1964 1065 42 1961 1077 <br />V/C Ratio(X) 0.02 0.00 0.07 0.62 0.00 0.45 0.78 0.62 0.62 0.79 0.62 0.62 <br />Avail Cap(c_a), veh/h 387 0 345 343 0 305 96 1964 1065 82 1961 1077 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.44 0.44 0.44 <br />Uniform Delay (d), s/veh40.0 0.0 40.4 62.5 0.0 61.2 63.1 18.1 18.1 63.1 18.1 18.1 <br />Incr Delay (d2), s/veh 0.1 0.0 0.4 11.6 0.0 6.8 25.7 1.5 2.7 13.2 0.7 1.2 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln0.2 0.0 0.7 1.2 0.0 0.7 1.4 12.0 13.4 1.2 11.9 13.2 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 40.1 0.0 40.9 74.1 0.0 68.0 88.8 19.5 20.8 76.3 18.8 19.3 <br />LnGrp LOS D A D E A E F B C E B B <br />Approach Vol, veh/h 34 51 1903 1910 <br />Approach Delay, s/veh 40.7 71.7 21.2 20.0 <br />Approach LOS D E C B <br />Timer - Assigned Phs 2 3 4 6 7 8 <br />Phs Duration (G+Y+Rc), s 33.3 8.2 79.9 8.7 8.1 80.0 <br />Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 <br />Max Green Setting (Gmax), s 4.0 7.0 73.0 25.0 6.0 75.0 <br />Max Q Clear Time (g_c+I1), s 3.6 4.5 32.5 4.2 4.4 32.4 <br />Green Ext Time (p_c), s 0.0 0.0 20.7 0.1 0.0 21.2 <br />Intersection Summary <br />HCM 6th Ctrl Delay 21.4 <br />HCM 6th LOS C <br />2-393
The URL can be used to link to this page
Your browser does not support the video tag.