My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
10-28-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:48:34 PM
Creation date
2/13/2020 2:42:15 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
930
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the transportation solutions company... <br />INTERSECTION: 12 ALTERNATIVE: Exist W/ Opt. E - Main Street/Walkie Way & SP Lot <br />INTERSECTION NAME: Main Street/17th Street <br />NORTH/SOUTH: Main Street <br />EAST/WEST: 17th Street <br />Right <br />Turn # of Turn Lanegroup <br />Mvmt. Lanes Cond. Capacity Vol. V/C Vol. V/C <br />NBL 2.0 3,200 189 0.06 * 200 0.06 <br />NBT 2.0 3,400 763 0.22 1,065 0.31 * <br />NBR 1.0 P 1,600 174 0.00 162 0.00 <br />SBL 2.0 3,200 180 0.06 188 0.06 * <br />SBT 2.0 3,400 1,086 0.35 * 812 0.28 <br />SBR 0.0 P 0 86 0.00 143 0.00 <br />EBL 2.0 3,200 142 0.04 203 0.06 <br />EBT 3.0 5,100 1,250 0.26 * 1,219 0.25 * <br />EBR 0.0 P 0 78 0.00 58 0.00 <br />WBL 2.0 3,200 306 0.10 * 186 0.06 * <br />WBT 3.0 5,100 1,335 0.27 1,064 0.22 <br />WBR 0.0 P 0 17 0.00 61 0.00 <br />N/S Critical Movements 0.40 0.37 <br />E/W Critical Movements 0.36 0.31 <br />Right Turn Critical Movement 0.00 0.00 <br />Clearance Interval 0.05 0.05 <br />ICU 0.810 0.730 <br />Level of Service (LOS)D C <br />Notes: ICU - Intersection Capacity Utilization <br />V/C - Volume to Capacity Ratio <br />Right Turn Conditions: <br />F - Free Right Turn <br />O - Overlap Phase <br />P - Permitted Right Turn <br />N - No Right Turn on Red <br />Exist W/ Opt. E - Main Street/Walkie Way & SP Lot <br />AM Peak Hour PM Peak Hour <br /> D:\Projects\RE - 2525 Main Street\Analysis Offset September 2019 Revised\ICU Worksheet 2\Existing 12 P Santiago2-415
The URL can be used to link to this page
Your browser does not support the video tag.