Laserfiche WebLink
HCS7 Freeway Facilities Report <br />Project Information <br />Analyst TR Agency Translutions <br />Jurisdiction Caltrans Time Period Analyzed PM Peak Hour <br />Analysis Year Existing With Option E - Main <br />St/Walkie Way Access and <br />Surface Parking Lot <br />Date 9/3/2019 <br />Project Description The Addington <br />Facility Global Input <br />Jam Density, pc/mi/ln 190.0 Density at Capacity, pc/mi/ln 45.0 <br />Queue Discharge Capacity Drop, %7 Total Segments 3 <br />Total Time Periods 1 Time Period Duration, min 15 <br />Segment Geometric Data <br />No.Coded Analyzed Name Length, ft Lanes <br />1 Weaving Weaving 17th St On to Main St Off 1530 6 <br />2 Basic Basic Main St Off to Main St On 2200 5 <br />3 Weaving Weaving Main St On to SR-22 Connector 1730 6 <br />Facility Segment Data <br />Segment 1: Weaving <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 8500 13488 0.73 14.7 96.6 F <br />Segment 2: Basic <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 7491 11485 0.81 16.9 88.8 F <br />Segment 3: Weaving <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 5032 5032 1.63 18.6 45.0 F <br />Facility Time Period Results <br />T Speed, mi/h Density, pc/mi/ln Density, veh/mi/ln Travel Time, min LOS <br />1 16.4 76.3 71.9 3.8 F <br />Facility Overall Results <br />Space Mean Speed, mi/h 16.4 Density, veh/mi/ln 71.9 <br />Average Travel Time, min 3.8 Density, pc/mi/ln 76.3 <br />Copyright © 2019 University of Florida. All Rights Reserved.HCS™Freeways Version 7.5 Generated: 9/3/2019 5:20:58 PM <br />NB Exist PM.xuf <br />2-456