Laserfiche WebLink
HCS7 Freeway Facilities Report <br />Project Information <br />Analyst TR Agency Translutions <br />Jurisdiction Caltrans Time Period Analyzed PM Peak Hour <br />Analysis Year Year 2040 With Option E - <br />Main St/Walkie Way Access <br />and Surface Parking Lot <br />Date 9/3/2019 <br />Project Description The Addington <br />Facility Global Input <br />Jam Density, pc/mi/ln 190.0 Density at Capacity, pc/mi/ln 45.0 <br />Queue Discharge Capacity Drop, %7 Total Segments 3 <br />Total Time Periods 1 Time Period Duration, min 15 <br />Segment Geometric Data <br />No.Coded Analyzed Name Length, ft Lanes <br />1 Weaving Weaving 17th St On to Main St Off 1530 6 <br />2 Basic Basic Main St Off to Main St On 2200 5 <br />3 Weaving Weaving Main St On to SR-22 Connector 1730 6 <br />Facility Segment Data <br />Segment 1: Weaving <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 7733 13530 0.76 12.0 107.1 F <br />Segment 2: Basic <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 6713 11485 0.86 13.4 100.1 F <br />Segment 3: Weaving <br />Time <br />Period <br />PHF fHV Flow Rate <br />(pc/h) <br />Capacity <br />(pc/h) <br />d/c <br />Ratio <br />Speed <br />(mi/h) <br />Density <br />(pc/mi/ln) <br />LOS <br />1 0.95 0.943 2939 2939 2.50 10.9 45.0 F <br />Facility Time Period Results <br />T Speed, mi/h Density, pc/mi/ln Density, veh/mi/ln Travel Time, min LOS <br />1 12.4 83.5 78.7 5.0 F <br />Facility Overall Results <br />Space Mean Speed, mi/h 12.4 Density, veh/mi/ln 78.7 <br />Average Travel Time, min 5.0 Density, pc/mi/ln 83.5 <br />Copyright © 2019 University of Florida. All Rights Reserved.HCS™Freeways Version 7.5 Generated: 9/3/2019 5:24:17 PM <br />NB 2040 PM.xuf <br />2-468