Laserfiche WebLink
Queues <br />7: Main St & Santiago Park/Walkie Way 09/03/2019 <br />The Addington 09/03/2019 Year 2040 Conditions - AM Peak hour Synchro 10 Report <br />Page 3 <br />Lane Group EBL EBT NBL NBT SBL SBT <br />Lane Group Flow (vph) 2 1 22 1560 1 1833 <br />v/c Ratio 0.01 0.00 0.21 0.48 0.01 0.61 <br />Control Delay 33.0 0.0 58.0 12.3 73.0 9.6 <br />Queue Delay 0.0 0.0 0.0 0.6 0.0 0.0 <br />Total Delay 33.0 0.0 58.0 12.9 73.0 9.6 <br />Queue Length 50th (ft) 1 0 17 200 0 126 <br />Queue Length 95th (ft) 8 0 44 305 m0 m136 <br />Internal Link Dist (ft)118 110 679 <br />Turn Bay Length (ft)70 150 80 <br />Base Capacity (vph) 364 555 191 3254 191 3016 <br />Starvation Cap Reductn 0 0 0 1187 0 0 <br />Spillback Cap Reductn 000000 <br />Storage Cap Reductn 000000 <br />Reduced v/c Ratio 0.01 0.00 0.12 0.75 0.01 0.61 <br />Intersection Summary <br />m Volume for 95th percentile queue is metered by upstream signal. <br />2-517