My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
10-28-19
>
10-28-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:48:34 PM
Creation date
2/13/2020 2:42:15 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
930
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 of 12 <br /> <br />iv. Modification of the Traffic Signal for the Walkie Way/Park Santiago <br />Drive intersection for the intended signal operation shall include new <br />signals poles, traffic cabinet, install conduits and wiring, traffic signal, <br />interconnect, provide Accessible Pedestrian Signals pedestrian push <br />buttons, vehicle/bike video detection, signing and striping as needed to <br />accommodate the proposed entrance to the development and Santiago <br />Park. <br /> <br />(c) Remove and reconstruct the raised-curb median in Main Street between Walkie Way <br />and Edgewood Road to provide increased left turn pocket lengths per Attachment 2, <br />including, but not limited to: <br />i. Reconstruct asphalt pavement in Main Street to maintain standard cross <br />slopes, positive drainage and smooth vertical transitions. <br />ii. Provide landscaping and irrigation in the median. <br />iii. Modify the existing channelization striping extending through <br />intersections. <br /> <br />(d) Coordinate with Caltrans to enter into a Cooperative Agreement with City of Santa <br />Ana to implement traffic signal synchronization timing along Main Street between <br />the I-5 ramps and the modified traffic signal at Main Street and Walkie Way-Santiago <br />Park to enhance traffic flow and reduce congestions between city streets and the State <br />Highway System. The scope of work shall include but not limited to preparation of <br />cooperative agreement, any required improvements, preparation and implementation <br />of timing plans, and required permits. <br /> <br />(e) The Emergency Vehicular Access Lane (Fire Lane) with access to Edgewood Road <br />shall be gated per Orange County Fire Authority and City Public Works Agency <br />requirements and standards. The emergency lane shall not be used for trash staging, <br />trash loading and/or move-ins/outs. No other vehicular access or curb approach <br />openings will be approved on Edgewood Road for the project. <br /> <br />SECTION 13 – Open Space standard in Specific Development No. 93 <br /> (a) Pedestrian Walkways and Open Space. The project will provide a minimum of 15% of the total lot size shall be open space in the form of common, landscaped open space areas, pools, spas, deck, courtyard and lobby, interior community room, dining room, gym, business room, etc. (b) Courtyards. <br /> <br />(1) East courtyards shall be a minimum of 34 feet wide by 100 feet in depth and shall <br />not contain any pools, spas or recreational rooms. <br /> <br />(2) West courtyard shall be a minimum of 48 feet wide by 58 feet in depth. (c) Private Open Space. Each residential unit shall have a patio or balcony a minimum of 50 square feet in size.
The URL can be used to link to this page
Your browser does not support the video tag.