Laserfiche WebLink
EXHIBIT A <br />STATE OF CALIFORNIA NATURAL RESOURCES AGENCY <br />GRANT AGREEMENT <br />General Fund Speci led Grant Projects <br />Grantee Name: City of Santa Ana <br />Project Title: City of Santa Ana Advanced Metering. Infrastructure <br />Agreement Number; GF1806-0 <br />Project Scope: <br />City of Santa Ana's installation and implementation of an Advanced Metering Infrastructure (AMI) System <br />providing real-time operational modeling information to track water customer demand and use; <br />establishing a distribution leak detection system and providing water consumption data to ailew <br />individuals to manage their water consumption, This is Phase I of a larger project. Elements funded by <br />General Fund grant include the following: <br />• Planning for AMI project deployment and implementation <br />• Procuring AMI system including developing system specifications and bid documents <br />• Installing at least one funder acknowledgement sign <br />• Installing approximately 4,000 of AMI meters to primarily high -use customers <br />• Retrofitting and updating meter boxes and structures as needed to allow for AMI signal <br />transmission <br />• Installing approximately 4,000 of AMI Radios <br />Installing AMI data collection infrastructure dependent on system selected <br />+ Installing approximately 10 AMI Towers <br />+ n*grating software, data and related information technology acdvit{es and improvements <br />+ Installing software and systems integration (AMI Head -in System, HES and Meter Data <br />Management System, MOMS), Specific HES and MOMS Software makelmodel will be specific to <br />the AM] system selected (to be determined). <br />• Deploying interactive customer portal to all users to monitor and track individual water usage <br />• Training staff to use and inspect AMI system <br />Project Schedule: <br />Activl DescripWn <br />Timeline <br />Preliminary work on the project- Contract with an AMI Project <br />Manager <br />February -April 2019 <br />Development of Implementation Plan and bid documents to <br />purchase AMI Tea nology and Software <br />February -May 2019 <br />Environmental Review (GEQA) City of Santa Ana- submit <br />CEQA Document to the State <br />Already completed via NOE submittal <br />Public Works Encroachment Permit for Installation of AMI <br />Collector TowersApril-May <br />2019 <br />Award Contract for Meter Installation (Phase 1) and Software <br />Development <br />June 2019 <br />Provide construction stakin mobilization as reouired <br />June -July 2019 <br />Review and approve shop drawings for materials required to <br />construct the prcject <br />July -August 2019 <br />Submit final site designiplans/specificabons to State <br />September 2019 <br />Purchase equipment, conduct installation, train staff, inspect <br />Installation <br />October 2019-Februa -2020 <br />Submit evidence of bond acknowled ement s' n <br />Februa 2020 <br />Submit Project Closeout package with final Payment Request <br />to State <br />A nl 2020 <br />Coat Estimate: See Exhibit At <br />25D-365 <br />