Laserfiche WebLink
Statement of Work for enQuesta v6 Upgrade <br />6.1.5.2 Any data archiving is out of scope. Additional analysis/services would be required <br />if archiving is desired. <br />6.1.6 One or two test conversions will be executed as per the Project Plan and timelines that need <br />to be met to execute Go -live on the desired date. Test conversion(s) will be used for the first <br />test phase: Functional/Integration testing. <br />6.1.7 S&S will provide a balancing report and conduct a bill parallel with each test conversion. <br />enQuesta Configuration <br />6.1.8 S&S will configure the enQuesta production and test systems according to the decisions <br />documentedin the New Features and enQuesta process changes document from the initiate <br />and analysis phase. All configuration will be unit tested. <br />Customer -specific modifications & Interfaces <br />6.1.9 S&S will port forward to v6 all Customer interfaces that currently exist in the current production <br />enQuesta environment. <br />6.1.10 All existing Customer -specific modifications will be ported forward to v6 as part of the <br />upgrade. <br />6.1.11 S&S will unit test all ported forward interfaces and Customer -specific modifications. <br />6.1.12 Customer Responsibilities <br />6.1.12.1 Interface work required of third parties, as well as management of the schedule for <br />third party work on interfaces is the responsibility of the Customer. <br />Cognos Report Conversion <br />6.1.13 The Customer will research the reports in their current Cognos library and identify only the <br />ones that need to be ported forward, so that time is not unnecessarily expended on reports <br />which are no longer required. S&S will convert up to 50 reports as part of the standard <br />Upgrade Project scope. Additional reports can be converted as needed using a baseline level <br />of effort of 10 minutes per report, which would be subject to a change order. <br />Proprietary & Confidential January 27, 2020 Page 19 of 37 <br />