| Gary Ho, PE, SE 
<br />Project Manager 
<br />Education 
<br />Mr. Ho has over 30 years of experience in structural engineering, design, 
<br />M.S., Structural 
<br />and earthquake engineering on water storage, conveyance and 
<br />Engineering 
<br />treatment, including reservoirs, tanks, and appurtenances. His extensive 
<br />University of California 
<br />experience in structural evaluation, seismic review, and risk analysis, 
<br />Berkeley, 1976 
<br />including probabilistic risk assessments of structures has granted him 
<br />work with some of the state's largest agencies and private companies. Mr. 
<br />B.S., Civil Engineering, 
<br />Ho manages complex design projects involving multiple disciplines. Many 
<br />University of California, 
<br />applaud his efforts to simply and streamline such efforts. He lends his 
<br />Berkeley, 1974 
<br />structural expertise to agencies on condition assessment and value 
<br />engineering studies, and is recognized for his work on concrete reservoirs 
<br />Registrations 
<br />and digesters with East Bay Municipal Water District. As technical adviser 
<br />he will manage the technical review of all deliverables and provide his 
<br />Structural Engineer, 
<br />input on management, design, and constructability as well as other 
<br />California 52534 
<br />aspects of the reservoirs project. 
<br />Civil Engineer, 
<br />Professional Record 
<br />California C30496 
<br />Forbes Hill Reservoir Cover Replacement Design, Marin Municipal 
<br />Water District, Corte Madera, California. Managing the design and 
<br />Affiliations 
<br />preparation of contract plans and specifications for a new roof structure 
<br />American Concrete 
<br />and replacement liner for Forbes Hill Reservoir. The work includes the 
<br />Institute 
<br />removal of the existing floating cover and liner, design of a new multi - 
<br />span aluminum roof structure, design of a new CSPE geomembrane liner 
<br />American Institute of Steel 
<br />system, and site/civil design. 
<br />Construction 
<br />Reservoir Repairs Phase 3, City of Oceanside, California. Senior 
<br />structural engineer for condition assessment, seismic evaluations, and 
<br />Concrete Reinforcing Steel 
<br />rehabilitation of nine prestressed concrete reservoirs and one steel 
<br />Institute 
<br />reservoir ranging in size from 1.5 MG to 5.0 MG. The work included site 
<br />investigations, seismic assessments per AWWA D110 Standards, and 
<br />Structural Engineers 
<br />development of retrofit schemes. The reservoirs are above -ground and 
<br />Association of Northern 
<br />partially buried reservoirs. 
<br />California 
<br />Reservoir Design Manual, East Bay Municipal Utility District, 
<br />Oakland, California. Co-author of the personnel reservoir design manual 
<br />Western Construction 
<br />for East Bay Municipal Utility District. The manual established the 
<br />Consultants 
<br />minimum requirements to be followed in the design of East Bay Municipal 
<br />Utility District potable water reservoirs. The Design Manual was for use of 
<br />all engineers working on District reservoir projects, and focused on the 
<br />major tasks and activities involved in the design conventionally reinforced 
<br />concrete, prestressed concrete reservoirs, steel and open and cut 
<br />reservoirs and related structures. 
<br />Los Angeles/Kern County Recycled Water Project, Phase II - Pump 
<br />Station, County of Los Angeles Public Works Department, Kern 
<br />County, California. Principal structural engineer for the structural design 
<br />of reinforced masonry pump station building. Produced the calculation 
<br />spreadsheets fo�,xLi,,dext analysis and design of the pump station. 
<br />Performed seised �vyy analysis. 
<br /> |