| 
								    Carlos Amante, PE, GE 
<br />Principal Engineer / Project Manager 
<br />Mr. Amante has over 25 years of broad geotechnical and 
<br />earthquake engineering consulting experience where he has 
<br />consistently demonstrated a wide-ranging breadth of 
<br />knowledge and ability to develop innovative and cost- 
<br />effective engineering solutions to numerous private and 
<br />public sector clients. He has vast experience working on 
<br />water/wastewater, transportation, energy, industrial, 
<br />commercial and residential projects. Mr. Amante is highly 
<br />experienced in project management and technical delivery 
<br />of projects involving complex ground investigation, seismic - 
<br />resilient design of earthworks and foundations, slope 
<br />engineering, liquefaction assessment, construction quality 
<br />assurance and material testing, and constructability/value 
<br />engineering study. 
<br />Relevant Experience 
<br />®Gmene ConwllaMb 
<br />EDUCATION 
<br />MS, Geotechnical Engineering, 
<br />University of British Columbia, 
<br />Canada, 1993 
<br />MEng, Master of Engineering, 
<br />Earthquake Engineering, Kanazawa 
<br />University, 1991 
<br />BS, Civil Engineering, University of 
<br />the Philippines, Metro Manila, 
<br />Philippines, 1984 
<br />REGISTRATIONS/CERTIFICATION S 
<br />California, Geotechnical Engineer 
<br />No. GE2724 
<br />California, Professional Engineer in 
<br />Civil Engineering No. C57831 
<br />Two 8.0-MG Steel Water Storage Tanks, Westminster, CA. Geotechnical Project Engineer. 
<br />Geotechnical investigation and site -specific seismic hazard analysis for two 190-ft diameter, 
<br />40-ft high steel water storage tanks, built side -by -side on a 4-acre site. Recommended site 
<br />remediation consisting of soil surcharge program and installation of stone columns to mitigate 
<br />weak upper clay soils and loose liquefiable sands underneath the site. 
<br />6.0-MG Highland Avenue Reservoir Replacement, Yorba Linda, CA. Geotechnical Project 
<br />Manager. Geotechnical investigation and value engineering study of proposed permanent 
<br />concrete water reservoir and two temporary steel water tanks to replace the existing buried 
<br />hopper reservoir. 
<br />1.0-MG Arbor Ridge Steel Water Tank, Walnut, CA. Geotechnical Project Manager. 
<br />Geotechnical investigation for a new welded -steel water tank located in the San Jose Hills. 
<br />3.0-MG Rawlings Reservoir Replacement, Cityof Tustin, CA. Geotechnical Project Manager. 
<br />Geotechnical investigation for the proposed replacement of existing 4.2-MG hopper -type water 
<br />reservoir with two cylindrical concrete water -tanks. 
<br />10.8-MG Water Storage Facility, Santa Clarita, CA. Geotechnical Project Manager. 
<br />Geotechnical reconnaissance review for the proposed emergency and operational water 
<br />storage facility, including a water reservoir along with supporting appurtenances that may 
<br />include pipelines, pressure regulators, valves and pump stations. 
<br />Apple Valley Water System Improvements, Apple Valley, San Bernardino County, CA. Lead 
<br />Geotechnical Engineer. Geotechnical investigation for proposed water system improvements, 
<br />including two 28-ft diameter, 16-ft high steel -bolted potable water tanks to replace the three 
<br />existing water tanks at the Mesa Vista tank site, 6-inch diameter, 4,800-ft long transmission 
<br />pipeline, and 8-inch diameter, 1,300-ft long distribution lines. 
<br />25B-50 
<br />
								 |