My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL RIO HOUSING PARTNERS, L.P.
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL RIO HOUSING PARTNERS, L.P.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 1:48:47 PM
Creation date
4/15/2020 1:33:47 PM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL RIO HOUSING PARTNERS, L.P.
Contract #
A-2009-214-04
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
7/20/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reasonably require VISTA DEL RIO, at VISTA DEL RIO'S expense, to move, alter or relocate <br />its facilities (hereinafter called "rearrangement") to another location within the ORANGE street <br />to avoid such danger, interference or obstruction, in conformity with the written notice of the <br />ORANGE City Engineer, and VISTA DEL RIO shall hold harmless SANTA ANA from any <br />damages or claims caused by such arrangements. <br />(b) Whenever, during the existence of this Agreement, ORANGE shall cause <br />the change of the grade, width or location of any ORANGE street or cause the improvement of <br />any ORANGE street in any manner, including the laying of any sewer, storm drain, conduits, <br />gas, water or other pipes, or cause the construction of any pedestrian tunnels, or other work (the <br />right to do all of which specifically reserve to ORANGE without any admission on its part that it <br />would not otherwise have such rights), and such work shall, in the reasonable opinion of the <br />ORANGE City Engineer, render necessary any change in the position or location of any of <br />VISTA DEL RIO'S facilities in the ORANGE street that are subject to this Agreement, VISTA <br />DEL RIO shall, at its own cost and expense, do any and all things to effect such change in <br />position, or location, in conformity with the written notice of the ORANGE City Engineer; <br />provided, however, that ORANGE shall allow relocation of VISTA DEL RIO'S facilities <br />elsewhere within the ORANGE street right-of-way. In the event that relocation of VISTA DEL <br />RIO'S facilities may be avoided by reasonable modifications to the ORANGE project while still <br />achieving the sought -for benefits of the project, consistent with accepted engineering practices, <br />VISTA DEL RIO'S obligation may be limited to payment to ORANGE of such additional costs <br />and expenses as are incurred by ORANGE to design, construct, and operate the modified project <br />in a way that avoids the relocation of VISTA DEL RIO'S facilities. ORANGE and VISTA DEL <br />RIO shall cooperate to minimize any disruption in the use of VISTA DEL RIO'S facilities or the <br />use of other facilities impacted by the ORANGE project, and VISTA DEL RIO shall hold <br />harmless SANTA ANA from any damages or claims caused by such arrangements. <br />(c) When such rearrangement is not done for an ORANGE project and/or for <br />an ORANGE facility but is done solely for the accommodation of any person, firm or <br />corporation other than ORANGE, VISTA DEL RIO or SANTA ANA, VISTA DEL RIO shall, at <br />the reasonable request of the ORANGE City Engineer, move, alter or relocate VISTA DEL <br />RIO'S facilities that are subject to this Agreement to another location in the street -right-of-way; <br />provided, however, the cost of such arrangement shall be borne by the accommodated party. <br />Such accommodated party, in advance of such arrangement, shall deposit with ORANGE or the <br />ORANGE City Clerk cash or a corporate surety bond in an amount, as in the reasonable <br />discretion of the ORANGE City Engineer, shall be required to pay the costs of such <br />rearrangement, and such accommodated party shall execute an instrument agreeing to indemnify <br />and hold harmless VISTA DEL RIO or SANTA ANA from any and all damages or claims <br />caused by such arrangement. <br />(d) VISTA DEL RIO shall be given not less than one hundred eighty (180) <br />days' written notice of any rearrangement of facilities, which VISTA DEL RIO is required to <br />make hereunder. Such notice shall specify in reasonable detail the work to be done by VISTA <br />DEL RIO and shall specify the time that such work is to be accomplished. In the event that <br />ORANGE shall change the provisions of any such notice given to VISTA DEL RIO, VISTA <br />DEL RIO shall be given an additional period not less than one hundred eighty (180) days to <br />accomplish such work. <br />El <br />
The URL can be used to link to this page
Your browser does not support the video tag.