|
Safa Kamangar, PE, PMP, CCM, QSDIP, ENV SP I Senior Engineer
<br />Safa brings over 21 years of experience in water, wastewater, and water reuse, planning, design, and construction
<br />management in both the private and public sectors. His previous experience includes design engineering, staff
<br />augmentation, on -call contract consultation, program management, design -build owner representative, construction
<br />management, and resident engineering services. As a design engineer Safa, has performed hydraulic calculations,
<br />mechanical design, detailed design drawings, development of specifications, site work, and field calculations. As a
<br />Construction Manager, he has been responsible for construction oversight, schedule management, budget tracking, and
<br />contractor negotiations.
<br />Project Name. Role. Description.
<br />Western Pump Station Replacement, Glendale, California. City of Glendale Water & Power (GWP). Project
<br />Manager. Design and construction management of GWP's existing pump station including sizing a 200 hp and a 400
<br />hp horizontal split case pumps and motors, piping modifications, new electrical service, variable frequency drives
<br />(VFDs), instrumentation, and controls.
<br />San Joaquin Booster Pump Station, Laguna Beach, California. Laguna Beach City Water District. Project
<br />Manager. Managed design and construction management/inspection of upgrading the existing booster station. The
<br />project included removal of two existing split -case pumps, installing three new vertical turbine booster pumps, and
<br />removal and installation of new electrical system and controls, while keeping the existing building intact and in-
<br />service.
<br />Sewer Master Plan and Citywide Sewer Improvements. City of Villa Park. Project Manager. Prrovided project
<br />management for Updating the City's Sewer Master Plan, implement the recommended improvements, and provide
<br />construction management and inspection services during construction. Services included reviewing CCTV tapes,
<br />evaluating the structural and operational condition of the existing sewer facilities, prioritizing the repair needs
<br />(including spot repairs and relining), updating the existing Sewer Master Plan which included the prioritization of the
<br />needed repairs and recalculation of the assessments related to the work, preparation of the contract documents, and
<br />the construction management and inspection services required for this work.
<br />Ontario Booster Pump Station, Corona, California. City of Corona. Resident Engineer/Construction Manager.
<br />Design and engineering calculations for a 25-MGD booster pump station facility, Nitrate blending facility, and piping.
<br />In charge of overseeing the construction of pump station structural, mechanical, civil, and electrical components, and
<br />providing construction support services including review submittals and respond to requests for information (RFIs).
<br />New Water Yard. City of Pomona — Water Department. Design and Construction Management of Water
<br />Department's new maintenance yard in City's vacant lot. Project included regarding the site, pavement design, yard
<br />lighting, steel structure for parking, and concrete structure as material bins, perimeter wall and fencing, motorized
<br />rolling gates, as well as an on -site retention basin.
<br />Years with Michael Baker: 1
<br />Years with Other Firms: 20
<br />Education:
<br />M.S., 2000, Civil Engineering,
<br />University of Tehran
<br />B.S., 1997, Civil Engineering,
<br />Azad University, Iran
<br />Licenses / Certifications:
<br />Professional Engineer,
<br />California, 2006, C70118
<br />Qualified SWPPP Developer
<br />(QSD), California, 2012,
<br />23059
<br />Project Management
<br />Professional (PMP), 2015,
<br />1863656
<br />Certified Construction
<br />Manager, 2016, 6341
<br />Envision Sustainability
<br />Professional
<br />OSHA 30-Hour Construction
<br />Outreach Training
<br />OSHA40-Hour HAZWOPER
<br />Certification
<br />Confined Space Training
<br />11I66% 66aA; L"a' Proposal I Appendix Water Resources RFP No. 19-118
<br />INTERNATIONAL
<br />
|