My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Simon Ranch Reservoir Booster Pump Station, Pipeline, and Reservoir for the City of <br />Tustin - Staff Engineer responsible for the preparation of a preliminary design report, plans, and <br />specifications for the construction of a new underground 1,700 gpm water booster station to <br />replace an existing facility which was in poor condition and had insufficient capacity. This project <br />also consisted of approximately 4,100 LF of Zone 1 and Zone 3 pipelines, ranging from 8" up to <br />16", to greatly enhance fire protection. AKM also assisted the City with the identification of <br />easement requirements and prepared traffic control plans for the work. <br />• Reata Booster Pump Station for the City of San Clemente — Associate Engineer responsible <br />for the preparation of plans and specifications for the construction of a 1,700 gpm water booster <br />station to replace an existing facility which was in poor condition and had insufficient capacity. <br />This project included vertical turbine pumps, discharge and backfeed metering facilities, a surge <br />anticipator valve, a continuous water quality analyzer for the on -site reservoir, and provisions for <br />bypassing the pump station with a temporary diesel pump. <br />• South Gardena Recycled Water Pipeline for West Basin Municipal Water District — <br />Associate Engineer responsible for plan preparation and construction support for the design of <br />3,500 LF of 8-inch and 1,200 LF of recycled water pipeline in Normandie Avenue the County of <br />Los Angeles. This project included: a tie-in to a 42-inch steel recycled water main, a 200' jack - <br />and -bore design, and a bridge crossing over Dominguez Channel. <br />AKM Prop. 20-1004 25F-404 Appendix B - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.