PACIFIC COAST HIGHWAY WATER MAIN REPLACEMENT
<br />CITY OF LOMITA I LOMITA, CA
<br />Our team is providing design engineering services for the preparation of plans, specifications and cost
<br />estimates for the Pacific Coast Highway water main replacement project from Narbonne Avenue to Eshelman
<br />Avenue. This project consists of replacing the existing dual 6-inch water mains, including the installation of fire
<br />hydrants, service laterals, valves, blow -offs, air release valves, and other associated water appurtenances. The
<br />City's 2015 Water Master Plan recommended replacement of the existing water main with new 6-inch Polyvinyl
<br />Chloride (PVC), but the City is requesting that proposers consider 8-inch water mains for replacement.
<br />DATES: SEPTEMBER 2017-CURRENT; KEY PERSONNEL: CHARLIE MCKINLEY, KHANH NGUYEN, VANESSA PANETO
<br />CONTACT: MONDHER SATED, SENIOR CIVIL ENGINEER, M.SAIED@LOMITACITY.COM, 310.325.7110, EXT. 210
<br />I:7e1IIIII►AFATJ4►111:1Iola III :UIGiUN4IJAI :2:Z1114JAI40k&I
<br />CITY OF WHITTIER I WHITTIER, CA
<br />Our team is providing plans, specifications and estimates for the replacement of an existing 6-inch water main
<br />and 8-inch sewer main prone to frequent blowouts due to an aging pipeline. Improvements also include street
<br />reconstruction along Palm Avenue between Whittier Boulevard and Beverly Boulevard. This reach will replace
<br />approximately 5,000 LF of pipeline and street pavement.
<br />DATES: MAY 2016-CURRENT; KEY PERSONNEL: CHARLIE MCKINLEY, KHANH NGUYEN, VANESSA PANETO
<br />CONTACT: KYLE CASON, ASSISTANT PUBLIC WORKS DIRECTOR, KCASON@CITYOFWHITTIER.ORG, 562.567.9500
<br />I--fe1►\y/[834►k111 :1:ZlkIell :21»41►14:14111ZoL III D]►
<br />RAMONA MUNICIPAL WATER DISTRICT I RAMONA, CA
<br />NV5 prepared a predesign report and construction drawings and specifications for the relocation of distribution
<br />and transmission pipelines that were impacted by the realignment of San Vicente Road by the County of
<br />San Diego. The project included the design of 12,600 LF of 16-inch CMLC steel transmission pipeline, 4,000
<br />LF of 12-inch CMLC steel distribution pipeline, and 560 LF of PVC distribution pipeline and appurtenances.
<br />Services included potholing, surveying, mapping of existing utilities, connection details, demolition plans for an
<br />abandoned pump station, developing a construction sequence to maintain the existing pipelines operational
<br />during construction, and extensive coordination with other utilities relocated as part of the project.
<br />DATES: 2012-2015; KEY PERSONNEL: CARMEN KASNER, JULIAN PALACIOS, STEVEN GRANADOS
<br />CONTACT: RICARDO SOTO, PE, PRINCIPAL ENGINEER, 760.788.2260
<br />8-INCH AND 6-INCH WATER MAIN REPLACEMENT IN WESTFORD STREET
<br />CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT I ANAHEIM, CA
<br />Our team prepared plans, specifications and estimates to replace an existing 4-inch DIP water main in
<br />Westford Street with 6-inch PVC C-900 pipe, replacing an existing 8-inch DIP water main in Ardmore Street,
<br />between Shannon Street and Westford Street, with 8-inch PVC C-900 pipe, and also replacing an existing
<br />8-inch DIP water main in Calle del Norte, west of Via Arboles, with 8-inch PVC C-900 pipe. The existing pipe,
<br />which totals approximately 1,400 LF, is being replaced due to numerous main breaks, primarily due to external
<br />corrosion of pipe material.
<br />DATES: JUNE 2016-FEBRUARY 2017; KEY PERSONNEL: KHANH NGUYEN
<br />CONTACT: RUDY EMAMI, DIRECTOR OF PUBLIC WORKS, 714.765.5148