My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Beaudry Terrace Water Main Replacement <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />Beaudry Terrace neighborhood water main replacement project. The <br />project was located in residential streets in a hilly part of Glendale which <br />required our team to develop construction documents that could <br />accommodate traffic while working in narrow residential streets. <br />The existing water mains in the Beaudry Terrace neighborhood were 40- <br />50 years old and were deteriorated and made with unlined cast-iron. The <br />design involved the preparation of plans and specifications forthe <br />replacement and installation of approximately 5,300linearfeet of new <br />12-inch, 8-inch, and 6 inch diameter ductile -iron water mains. Existing <br />galvanized and copper services smaller than 1 inch were replaced with f- <br />inch copper services. Existing fire hydrants were replaced and spacing <br />was increased to provide current fire protection to the neighborhood. <br />TAIT provided the design services along with topographical survey of this <br />hilly neighborhood. Due to the hilly nature of the project, retaining walls <br />were designed at some of the hydrants to ensure adequate clearance was <br />provided between the hydrant and the adjoining slopes. <br />f. References <br />City of Chino <br />Lupe Camacho <br />(909)334-3406 <br />13220 Central Avenue <br />Chino, CA 91710 <br />Projects: Quadrant 111 Water Main Replacement <br />Glendale Water & Power <br />Client: <br />Glendale Water & Power <br />Reference: <br />Shad Rezai <br />141 N. Glendale Ave., Level 4 <br />Glendale, CA 91206 <br />(818)548-3982 <br />srezai@glendaleca.eov <br />Construction Cost: <br />$1.56 M <br />Project Dates: <br />Design: 2014-2015 <br />Construction: April 2015 <br />Project Team: <br />PIC: Jacob Vandervis <br />PM: Kimberly Johnson <br />DE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Andy Cheung <br />(818)551-6909 <br />141 N. Glendale Ave., Level 4 <br />Glendale, CA 91206 <br />Projects: Hoover, Toll, Keppel Recycled Water Project, Kenneth and Ben Lomond Water Main Replacements <br />Project, Adams Hill Neighborhood Water Main Replacement Project, Beaudry Terrace Water Main <br />Replacement Project <br />Golden State Water Company <br />Conde Ventura, PE <br />(310)436-6950 x102 <br />630 E. Foothill Boulevard <br />San Dimas, CA 91773 <br />Projects: Foothill District Water Main Replacements, Normandie Ave. Water Main Replacement <br />25k�4513 Page 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.