My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />determine the most ideal location and path for both features. TAIT will utilize the geotechnical <br />investigation provided by the City in conjunction as part of this initial design. This task includes: <br />Design Field Walk <br />This sub -task includes all hours necessary for the field review and design required to observe and <br />document the existing site conditions and to identify anticipated work items. Existing condition <br />photos will be taken along the project limits in order to aid the City in construction coordination. All <br />field notes will be compiled and stored in the design file for reference. <br />Preliminary Design & Layout (30% Plans) <br />TAIT will prepare 30% layout plans are part of this task and will submit to the City for review and <br />verification of the proposed alignment and layout of improvements. Upon city review and approval <br />of the proposed alignment and improvements TAIT will initiate the plan and profile preparation <br />stage. <br />Deliverables: <br />✓ Field Walk Notes <br />✓ Preliminary Findings & 30% Layout Plans (Digital & Hard Copies) <br />D,2 Final Plan Preparation <br />Upon City confirmation of the preferred design alternative, TAIT will initiate the preparation of the 60% <br />PS&E package. The following are the anticipated sheet counts forthe proposed plan set: <br />SHEET <br />TOTAL ANTICIPATED SHEETS <br />DESCRIPTION <br />Bid Package 1 <br />Bid Package 2 <br />Project area <br />23 <br />28 <br />30 <br />32 <br />41 <br />38 <br />42 <br />43 <br />46 <br />47 <br />48 <br />49 <br />59 <br />Title Sheet <br />1 <br />1 <br />Notes, & Typical <br />2 <br />3 <br />Details <br />Water Main <br />Replacement <br />3 <br />2 <br />1 <br />2 <br />1 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />Plan & Profile <br />Water & Sewer <br />Main Connection <br />2 <br />3 <br />Details <br />2-phase Traffic <br />2 <br />2 <br />2 <br />2 <br />2 <br />Control Plans <br />Total Sheet <br />10 <br />4 <br />3 <br />4 <br />1 <br />9 <br />2 <br />1 <br />1 <br />1 <br />1 <br />5 <br />1 <br />Count <br />The key components of the plan package are described below: <br />Title Sheet <br />A title sheet will be prepared for each Bid Set (total of two) and will include all City of Chino <br />standard notes, a vicinity map predicting the location of each pipe replacement segment, a list of <br />25k�4517 Page 1 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.