My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH- RESO ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - PH- RESO ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:36:00 PM
Creation date
4/16/2020 3:28:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.15 PUBLIC SERVICES <br />5.15.1 Summary of Previous Environmental Analysis <br />According to the Certified EIR, the Approved Project would create additional demand fof police services and <br />fire and/or emergency rescue services. Additionally, the Approved Project would be expected to lead to new <br />school aged students. The Certified EIR determined that the Approved Project would not impact libfary <br />services. Potential impacts would be (educed to less than significant levels through implementation of identified <br />mitigation measures. <br />The Approved Project's impact to parks was discussed in the Initial Study to the Certified EIR under the <br />Recreation topic. The Initial Study determined that implementation of the Approved Project would not <br />significantly increase the use of area parks of lead to substantial physical deterioration of these recreation <br />resources. The Approved Project's impact on parks and recreational facilities was determined to be less than <br />significant. <br />5.15.2 Impacts Associated with the Proposed Project <br />Would the Proposed Project result in substantial adverse physical impacts associated with the provision of new <br />or physically altered governmental facilities, need for new of physically altered governmental facilities, the <br />construction of which could cause significant environmental impacts, in order to maintain acceptable service <br />ratios, response times, or other performance objectives for any of the public services: <br />Less Than <br />Significant <br />Substantial <br />Impact/No <br />Substantial <br />Changein <br />New <br />Changes or <br />Changein <br />Circum- <br />Information <br />New <br />Project <br />stances <br />Showing New <br />Information <br />Requiring <br />Requiring <br />or Increased <br />Requiring <br />Major EIR <br />Major EIR <br />Significant <br />Preparation of <br />Environmental Issues <br />Revisions <br />Revisions <br />Effects <br />an EIR <br />No Impact <br />a) Fire protection? <br />X <br />b) Police protection? <br />X <br />c) Schools? <br />X <br />d) Parks? <br />X <br />e) Libraries? <br />X <br />Comments: <br />a) Fire protection? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Orange County Fire Authority (OCFA) provides fire protection and emergency services to the project <br />area. The Proposed Project would allow for fesidential uses in place of some of the approved office uses. The <br />75A-134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.