Laserfiche WebLink
c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm equipment)? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Proposed Project would place multi -family residential units within an urbanized area where multi -family <br />residential units already exist. Therefore, the Proposed Project would not introduce incompatible uses. The <br />Proposed Project would not alter access to the Project Site nor introduce newgeometric design features beyond <br />what was analyzed in the Certified EIR. The Proposed Project would adhere to all identified mitigation <br />measures identified in the Certified HER, which would ensure that impacts regarding geometric design feature <br />are less than significant Therefore, no significant new impact or substantial increase in the severity of a <br />previously described impact would occur, and the preparation of a subsequent EIR would not be required. <br />d) Result in inadequate emergency access? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Approved Project incorporates two access points to the approved eight level parking garage. As part of <br />the development of the Approved Project, the Approved Project incorporates street improvements, such as <br />the installation of a roundabout at the intersection of Sycamore Street and loth Street and other roadway <br />modifications. The Certified EIR determined that the Approved Projects impact to surface transportation <br />routes adjacent to or in the vicinity of the Project Site would be less than significant with the incorporation of <br />mitigation measures. The Proposed Project does not include any roadway modifications and as shown in Table <br />12, the Proposed Project would result in a reduction of project trips. Therefore, the Proposed Project would <br />not create significant new impact of substantial increase in the severity of a previously described impact, and <br />the preparation of a subsequent EIR would not be required. <br />5.17.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />The following mitigation measures have been carried through from the One Broadway Plaza EIR. These <br />mitigation measures have been incorporated into Mitigation Monitoring Plan for this Addendum. Any <br />modifications to the mitigation measures from the Certified EIR are shown as stn lie4l eegh for deleted text <br />and bold for new, inserted text <br />T-1 The developer shall pay all costs (design, construction, administration and inspection) for <br />Washington Avenue and 10+ Street to operate as one-way streets which include signal <br />modifications and appropriate protected leftturnsignal at Main Street/Washington Avenue, <br />Main Street/10* Street, Washington Avenue/Sycamore Street, Broadway Street/Washington <br />Avenue and Broadway Street/10" Street <br />T-2 The project proponent shall pay for all costs for the installation of a foundabout at the <br />intersection of Sycamore Street and 10r, Street <br />T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge area at <br />the intersection of Sycamore Street and 10+ Street where a foundabout is to be constructed. <br />The project developer shall be required to pay all costs (design, construction, administration <br />75A-145 <br />