Laserfiche WebLink
U-9 The project developer shall pay their fair share amount, as determined by the City of Santa <br />Ana, to construct the proposed storm drain system serving the project site to Broadway Street <br />in accordance with the City's Master Plan of Drainage. <br />U-10 The project developer shall pay all costs for the construction of a new 8-inch waterline and a <br />6-inch sewer to be constructed within Washington Avenue and 10th Street to replace these <br />lines abandoned in a portion of Sycamore Street. <br />61 pill RYA I I Q a I Oki 0 <br />5.20.1 Summary of Impacts Identified in the Program EIR <br />Wildfire was not analyzed as a topic in the prior One Broadway Plaza Certified EIR; however, it was addressed <br />as part of the Hazards and Hazardous Materials section and was scoped out in the Initial Study. The Initial <br />Study determined that the Project Site is located m an urban area. The Approved Project would not expose <br />people or structures to a significant risk of loss, injury or death involving wildland foes, including wildland foes <br />that occur on land adjacent to urbanized areas of where residences are intermixed with wildlands. The Initial <br />Study finther determined that the Project Site is not subject to mudflows due to the flat topography. <br />5.20.2 Impacts Associated with the Proposed Project <br />If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would <br />the Proposed Project: <br />Less Than <br />Significant <br />Substantial <br />Impact/No <br />Substantial <br />Changein <br />New <br />Changes or <br />Changein <br />Circum- <br />Information <br />New <br />Project <br />stances <br />Showing New <br />Information <br />Requiring <br />Requiring <br />or Increased <br />Requiring <br />Major EIR <br />Major EIR <br />Significant <br />Preparation of <br />Environmental Issues <br />Revisions <br />Revisions <br />Effects <br />an EIR <br />No Impact <br />a) Substantially impair an adopted emergency <br />response plan or emergency evacuation <br />X <br />plan? <br />b) Due to slope, prevailing winds, and other <br />factors, exacerbate wildfire disks, and <br />thereby expose project occupants to, <br />X <br />pollutant concentrations from awildfire or <br />the uncontrolled spread of a wildfire? <br />c) Require the installation or maintenance of <br />associated infrastructure (such as roads, <br />fuel breaks, emergency water sources, <br />power lines or other utilities) that may <br />X <br />exacerbate fire disk or that may result in <br />temporary or ongoing impacts to the <br />environment? <br />75A-157 <br />