My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH- RESO ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - PH- RESO ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:36:00 PM
Creation date
4/16/2020 3:28:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Harrah <br />Caribou Industries, Inc. <br />March 5, 2020 <br />Page 4 of 7 <br />TABLE 4: PROPOSED PROJECT OPERATIONAL EMISSIONS SUMMARY <br />Operational Activities - <br />Summer Scenario <br />Emissions (lbs/day) <br />VOC <br />NOx <br />CO <br />sox <br />PM20 <br />PM2.5 <br />Area Source <br />12.98 <br />0.39 <br />33.31 <br />1.75E-03 <br />0.18 <br />0.18 <br />Energy Source <br />0.35 <br />3.11 <br />2.13 <br />0.02 <br />0.24 <br />0.24 <br />Mobile Source <br />5.84 <br />20.70 <br />59.56 <br />0.19 <br />16.35 <br />4.50 <br />Total Maximum Daily Emissions <br />19.18 <br />24.20 <br />94.99 <br />0.22 <br />16.77 <br />4.93 <br />SCAQMD Regional Threshold <br />55 <br />55 <br />550 <br />150 <br />150 <br />55 <br />Threshold Exceeded? <br />NO <br />NO <br />NO <br />NO <br />NO <br />NO <br />Operational Activities - <br />Winter Scenario <br />Emissions (lbs/day) <br />VOC <br />NOx <br />CO <br />sox <br />PM20 <br />PM2.5 <br />Area Source <br />12.98 <br />0.39 <br />33.31 <br />1.75E-03 <br />0.18 <br />0.18 <br />Energy Source <br />0.35 <br />3.11 <br />2.13 <br />0.02 <br />0.24 <br />0.24 <br />Mobile Source <br />5.76 <br />21.13 <br />58.61 <br />0.19 <br />16.35 <br />4.50 <br />Total Maximum Daily Emissions <br />19.10 <br />24.63 <br />94.05 <br />0.21 <br />16.77 <br />4.93 <br />SCAQMD Regional Threshold <br />55 <br />55 <br />550 <br />150 <br />150 <br />55 <br />Threshold Exceeded? <br />NO <br />NO <br />NO <br />NO <br />NO <br />NO <br />GHG EMISSIONS <br />PROPOSED PROJECT GHG EMISSIONS <br />GHG emissions impacts were modeled employing the CalEEMod version 2016.3.2. As shown on Table <br />5, Proposed Project would generate a total of approximately 6,415.16 MTCO2e per year. <br />TABLE 5: PROPOSED PROJECT GHG EMISSIONS <br />Emission Source <br />Emissions (MT/yr) <br />CO2 <br />CH4 <br />N20 <br />Total CO2e <br />Area Source <br />6.78 <br />6.62E-03 <br />0.00 <br />6.94 <br />Energy Source <br />2,568.56 <br />0.09 <br />0.03 <br />2,579.25 <br />Mobile Sources <br />2,979.94 <br />0.14 <br />0.00 <br />2,983.43 <br />Waste <br />98.23 <br />5.82 <br />0.00 <br />244.09 <br />Water Usage <br />516.89 <br />2.60 <br />0.07 <br />601.44 <br />Total CO2e (All Sources) <br />6,415.16 <br />13142-04 AQ & GHG Memo <br />75A-171 <br />L1 IJRBpAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.