HomeMy WebLinkAbout75A - One Broadway Plaza Addendum_4.20.2020_wAppendicesApril 2020 1 Addendum No. 1 to the
One Broadway Plaza EIR
One Broadway Plaza Project
for City of Santa Ana
Prepared for:
City of Santa Ana Planning and Building Agency
Contact: Vince C. Fregoso, AICP
Planning Manager
20 Civic Center Plaza
Santa Ana, California 92701
Prepared by:
PlaceWorks
Contact: William Halligan, Esq.,
Managing Principal, Environmental Services
3 MacArthur Place, Suite 1100
Santa Ana, California 92707
714.966.9220
info@placeworks.com
www.placeworks.com
0 PLACEWORKS
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Table of Contents
Section Page
1. INTRODUCTION........................................................................................................................1
1.1
PURPOSE OF AN EIR ADDENDUM...........................................................................................................1
1.2
CONTENT AND ORGANIZATION OF THIS ADDENDUM.............................................................
3
1.3
PREVIOUS ENVIRONMENTAL DOCUMENTATION..........................................................................
4
2. ENVIRONMENTAL
SETTING..................................................................................................... 5
2.1
PROJECT LOCATION.......................................................................................................................................
5
2.2
ENVIRONMENTAL SETTING.......................................................................................................................
6
3. PROJECT DESCRIPTION........................................................................................................13
3.1
PROJECT BACKGROUND.............................................................................................................................13
3.2
PROJECT DESCRIPTION...............................................................................................................................15
3.3
DISCRETIONARY ACTIONS........................................................................................................................15
4. ENVIRONMENTAL
CHECKLIST..............................................................................................17
4.1
BACKGROUND..................................................................................................................................................17
4.2
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED...........................................................19
4.3
DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY).........................................19
4.4
EVALUATION OF ENVIRONMENTAL IMPACTS................................................................................20
5. ENVIRONMENTAL ANALYSIS.................................................................................................23
5.1
AESTHETICS......................................................................................................................................................
24
5.2
AGRICULTURE AND FOREST RESOURCES.........................................................................................26
5.3
AIR QUALITY.....................................................................................................................................................28
5.4
BIOLOGICAL RESOURCES..........................................................................................................................
34
5.5
CULTURAL RESOURCES...............................................................................................................................
38
5.6
ENERGY...............................................................................................................................................................43
5.7
GEOLOGY AND SOILS..................................................................................................................................
45
5.8
GREENHOUSE GAS EMISSIONS...............................................................................................................
50
5.9
HAZARDS AND HAZARDOUS MATERIALS.........................................................................................
56
5.10
HYDROLOGY AND WATER QUALITY....................................................................................................
61
5.11
LAND USE AND PI.ANNING......................................................................................................................
66
5.12
MINERAL RESOURCES..................................................................................................................................
67
5.13
NOISE....................................................................................................................................................................69
5.14
POPULATION AND HOUSING..................................................................................................................
72
5.15
PUBLIC SERVICES............................................................................................................................................
75
5.16
RECREATION....................................................................................................................................................
80
5.17
TRANSPORTATION.........................................................................................................................................81
5.18
TRIBAL CULTURAL RESOURCES..............................................................................................................
90
5.19
UTILITIES AND SERVICE SYSTEMS........................................................................................................
91
5.20
WILDFIRE............................................................................................................................................................98
5.21
MANDATORY FINDINGS OF SIGNIFICANCE..................................................................................101
6. LIST OF PREPARERS...........................................................................................................103
6.1
CITY OF SANTA ANA...................................................................................................................................103
6.2
PLACEWORKS..................................................................................................................................................103
7. REFERENCES.......................................................................................................................105
Apri12020 Page i
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Table of Contents
APPENDICES
Appendix A Air Quality / Greenhouse Gas Memo
Appendix B Project Trip Generation Memo
Appendix C Water and Sewer Studies
Page ii PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Table of Contents
List of Figures
Figure Page
Figure1 Regional Location Map........................................................................................................................ 7
Figure2 Project Location.................................................................................................................................... 9
List of Tables
Table 1 Summary of Existing Conditions on the Project Site..................................................................... 6
Table 2: Approved Project Land Use Summary............................................................................................14
Table 3 Proposed Project Buildout Comparison with Approved Project...............................................15
Table 4 Proposed Project Operational Emission Summary.......................................................................31
Table 5 Operational Emission Comparison..................................................................................................32
Table 6 Currently Approved One Broadway Plaza Land Uses GHG Emissions .................................. 55
Table 7 Proposed Project GHG Emissions.................................................................................................. 56
Table 8
Forecast, City of Santa Ana and Orange County...........................................................................
73
Table 9
Proposed Project Student Generation.............................................................................................77
Table 10
ITE Trip Generation Rates...............................................................................................................
83
Table 11
Proposed Project Trip Generation Summary.................................................................................
83
Table 12
Trip Generation Comparison...........................................................................................................
84
Table 13
Proposed Project Water Demand....................................................................................................
95
Table 14
Proposed Project Wastewater Generation......................................................................................95
Table 15
Proposed Project Solid Waste Generation.....................................................................................96
Apri12020 Page iii
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Table of Contents
Thi page intenlionalyleft blank.
Page iv PlaceWorks
1. Introduction
This Addendum to the City of Santa Ana's 2004 certified One Broadway Plaza Environmental Impact Report
(2004 Certified EIR), State Clearinghouse No. 199101047 has been prepared in accordance with Section 21166
of the California Environmental Quality Act (CEQA) and sections 15162 and 15164 of the CEQA Guidelines.
The City of Santa Ana is the lead agency responsible for the EIR, and this Addendum for the proposed One
Broadway Plaza Project.
Caribou Industries Inc. (Applicant) proposes to revise the existing entitlements of the One Broadway Plaza
Project to permit a conversion of a portion of the permitted office square footage to residential use ("Proposed
Project"). The Proposed Project would incorporate residential units within up to 19 floors, which were
previously designated for office uses under the Approved Project. The Proposed Project would provide up to
415 apartment units for a total of approximately 318,153 residential square feet. The residential component
would include penthouse suites, standard and executive residential units, and affordable units. The non-
residential components would include office, restaurants, commercial uses, wellness fitness center with a spa,
and a parking structure consistent with the Approved Project.
1.1 PURPOSE OF AN EIR ADDENDUM
1.1.1 CEQA Requirements
Where a previous program EIR has been prepared, subsequent activities within the program must be examined
in light of that EIR to determine whether an additional environmental document must be prepared. (CEQA
Guidelines Section 15168(c)). Where the subsequent activities involve site specific operations, the agency should
use a written checklist to document the evaluation of the site and the activity to determine whether the
environmental effects of the operation were covered in the program EIR. (CEQA Guidelines Section
15168(c)(4)).
Pursuant to PRC Section 21166 and State CEQA Guidelines Section 15162, when an EIR has been certified or
a negative declaration adopted for a project, no subsequent EIR or negative declaration shall be prepared for
the project unless the lead agency determines that one or more of the following conditions are met:
1. Substantial project changes are proposed that will require major revisions of the previous EIR
or negative declaration due to the involvement of new significant environmental effects or a
substantial increase in the severity of previously identified significant effects;
2. Substantial changes would occur with respect to the circumstances under which the project is
undertaken that require major revisions to the previous EIR or negative declaration due to the
involvement of new significant environmental effects or a substantial increase in the severity
of previously identified significant effects; or
Apri12020 Page 1
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
1. Introduction
3. New information of substantial importance that was not known and could not have been
known with the exercise of reasonable diligence at the time the previous EIR was certified or
the negative declaration was adopted shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR
or negative declaration.
b. Significant effects previously examined will be substantially more severe than identified in
the previous EIR.
c. Mitigation measures or alternatives previously found not to be feasible would in fact be
feasible and would substantially reduce one or more significant effects of the project, but
the project proponent declines to adopt the mitigation measures or alternatives.
d. Mitigation measures or alternatives that are considerably different from those analyzed in
the previous EIR would substantially reduce one or more significant effects on the
environment, but the project proponent declines to adopt the mitigation measures or
alternatives.
An Addendum can be prepared to a previously certified EIR if some changes or additions are necessary but
none of the conditions described in Section 15162 (above) calling for preparation of a subsequent EIR have
occurred (CEQA Guidelines Section 15164).
Changes to the One Broadway Plaza (Approved Project) and regulatory conditions, described below under the
Project Description would fulfill none of the conditions outlined in CEQA Guidelines Sections 15162(a)(1)—
(3) as these changes would not result in new significant environmental effects or a substantial increase in the
severity of previously identified significant effects requiring major revisions to the 2004 Certified EIR.
Accordingly, this checklist provides the substantial evidence required by CEQA Guidelines Section 15164(e) to
support the finding that a subsequent EIR is not required and an addendum to the 2004 Certified EIR is the
appropriate environmental document to address changes to the project.
As stated in CEQA Guidelines Section 15164 (Addendum to an EIR or Negative Declaration):
a) The lead agency or responsible agency shall prepare an addendum to a previously certified
EIR if some changes or additions are necessary but none of the conditions described in
Section 15162 calling for preparation of a subsequent EIR have occurred.
b) An addendum to an adopted negative declaration may be prepared if only minor technical
changes or additions are necessary or none of the conditions described in Section 15162
calling for the preparation of a subsequent EIR or negative declaration have occurred.
c) An addendum need not be circulated for public review but can be included in or attached
to the final EIR or adopted negative declaration.
d) The decision -making body shall consider the addendum with the final EIR or adopted
negative declaration prior to making a decision on the project.
Page 2 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
1. Introduction
e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section
15162 should be included in an addendum to an EIR, the lead agency's findings on the
project, or elsewhere in the record. The explanation must be supported by substantial
evidence.
After careful consideration of the potential environmental impacts of the Proposed Project, the City of Santa
Ana has determined that 1) none of the conditions requiring preparation of a subsequent or supplement to an
EIR have occurred, and 2) the circumstances described in Section 15164 of the CEQA Guidelines exist.
Therefore, an Addendum to the One Broadway Plaza EIR has been deemed appropriate.
1.1.2 Scope of Analysis in This Addendum
Changes to the One Broadway Plaza EIR ("Certified EIR") and regulatory conditions, described below under
the Project Description would fulfill none of the conditions outlined in CEQA Guidelines Sections
15162(a)(1)—(3) as these changes would not result in new significant environmental effects or a substantial
increase in the severity of previously identified significant effects requiring major revisions to the 2004 Certified
EIR. Accordingly, this checklist provides the substantial evidence required by CEQA Guidelines Section
15164(e) to support the finding that a subsequent EIR is not required and an addendum to the 2004 Certified
EIR is the appropriate environmental document to address changes to the project.
In order to implement the Proposed Project, a number of discretionary approvals from the City of Santa Ana
are required, including a General Plan Amendment and a Zoning Ordinance Amendment to the One Broadway
Plaza Specific Development District (SD 75). As lead agency under CEQA, the City of Santa Ana is required
to evaluate the environmental impacts associated with these discretionary approvals. The scope of the review
for project -related impacts for this Addendum is limited to differences between impacts analyzed by the
Certified EIR for implementation of the One Broadway Plaza Project (Approved Project) and the Proposed
Project. The Approved Project will serve as the "baseline" for the environmental impact analysis. The baseline
includes all applicable mitigation measures from the adopted Mitigation Monitoring and Reporting Program
(MMRP), approved in conjunction with the Certified EIR. As required by CEQA, this Addendum also
addresses changes in circumstances or new information that would potentially involve new environmental
impacts.
1.2 CONTENT AND ORGANIZATION OF THIS ADDENDUM
This Addendum relies on the City of Santa Ana's CEQA checklist, which addresses environmental issues
section by section. The completed checklist is included in Section 5.0, Environmental Analysis. Each
environmental topic has the following subheadings:
Summary of Previous Environmental Analysis (including the One Broadway Plaza EIR, and previous
CEQA documentation; see description under Subsection 3.1, Project Background, of this Addendum)
■ Impacts Associated with the Proposed Project (including environmental checklist)
■ Adopted Mitigation Measures Applicable to the Proposed Project
Apri12020 Page 3
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
1. Introduction
1.3 PREVIOUS ENVIRONMENTAL DOCUMENTATION
For a detailed description of adopted land use planning documents that apply to the Certified EIR and
associated environmental documentation, see Section 3.1, Project Background, of this Addendum.
Page 4 PlaceWorks
2. Environmental Setting
2.1 PROJECT LOCATION
2.1.1 One Broadway Plaza Specific Development District (SD 75)
The One Broadway Plaza Specific Development District (SD 75) is located in the central portion of the City
of Santa Ana in Orange County, California. The District is approximately 0.5 miles southwest from the I-5
Freeway and approximately 10 miles northeast from the Pacific Ocean, as shown in Figure 1, Regional Location
Map. The District is generally bound by Washington Avenue to the north, Sycamore Street to the east, 10th
Street to the south, and N. Broadway to the west. The Project Site is currently developed with seven existing
structures, six of which are designated as historic. One parcel on this block is not a part of the One Broadway
Plaza Specific Development District and is located along N. Broadway and is zoned Midtown Specific Plan (SP
3).
The One Broadway Plaza Specific Development District zoning allows for certain types of office uses, service
and commercial retail, cafes and restaurants, florists, pharmacies, day care facilities, museums, libraries and
galleries, and artists' studios along with other uses with the approval of a conditional use permit. The objectives
of the One Broadway Plaza Specific Development District is to create a landmark office project along
Broadway, maintain the existing streetscape, maintain the scale and character established by the existing historic
structures along the north end of the district, maintain large open setbacks adjacent to Broadway, encourage
revitalization of existing properties; and enhance the pedestrian experience.
2.1.2 Midtown Specific Plan (SP 3)
The Midtown Specific Plan area is roughly bound by 17th Street to the north, Civic Center Drive to the south,
mid -block between Bush Street and Spurgeon Street to the east, and midblock between Broadway and Durant
Street to the west. One parcel on the Project Site is zoned Midtown Specific Plan. The vision for the Midtown
Specific Plan is a "thriving and integrated district of civic, business, cultural, and retail activity with a small
residential component."
2.1.3 Project Site
The Project Site is located within one city block on Broadway Street between 10th Street and Washington
Avenue, as shown on Figure 2, Project Location. The Project Site is comprised of three parcels with Assessor
Parcel Numbers (APNs): 398-561-18 (1211 N. Broadway); 398-561-02 (1205 N. Broadway); and 398-561-03
(1205 N Broadway) (Orange County 2019). The Project Site is approximately 0.5 miles west of the I-5 Freeway
and approximately 0.7 miles from the Santa Ana Regional Transportation Center. The Project Site is
approximately 4.32 acres. No changes to the Project Site boundaries are contemplated as part of the Proposed
Apri12020 Page 5
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
2. Environmental Setting
Project. The Project Site is generally flat and the southern portion of the Project Site is currently under
construction to implement the Approved Project.
2.2 ENVIRONMENTAL SETTING
2.2.1 Existing Land Use and Zoning
The Project Site includes the entirety of the One Broadway Plaza Specific Development District, and one parcel
on the Project Site is not part of the District (parcel with APN 398-561-03). The portion of the Project Site
within the District (parcels with APNs 398-561-18 and 398-561-02) is zoned Specific Development 75 (SD 75),
One Broadway Plaza Specific Development District, with a corresponding General Plan land use designation
of One Broadway Plaza District Center (OBPDC). The parcel with APN 398-561-03 is zoned Midtown Specific
Plan (SP 3) with a General Plan land use designation of Professional & Administration Office (PAO).
The largest parcel on the Project Site, with APN 398-561-18, includes six one- to two-story residential structures
some of which have been converted to commercial and office uses along Broadway; a one-story commercial
building located at the southwest corner of Washington Avenue and Sycamore Street; surface parking lots; and
a graded/construction area on the southern portion of the site associated with the Approved One Broadway
Plaza project. Parcels 398-561-02 and -03 are developed with one two-story story residential/office building
located at 1205 N. Broadway. Table 1 summarizes property information and existing conditions on site.
Table 1 Summary of Existing Conditions on the Project Site
Existing Desi nations
Land Use
Zoning
Parcel APN
Address
Description
398-561-18
1211 N.
One Broadway Plaza
Specific Development
• Six one- to two-story residential structures some of
Broadway
District Center
75 (SD 75)
which have been converted to commercial and
office uses along Broadway;
• A one-story commercial building located at the
southwest corner of Washington Avenue and
Sycamore Street; surface parking lots; and
• A graded/construction area on the southern portion
of the District associated with the Approved One
Broadway Plaza project.
398-561-02
1205 N.
One Broadway Plaza
Specific Development
. A two-story single-family residence/office with
Broadway
District Center
75 (SD 75)
stand-alone parking garage on the southeast corner
of the lot.
398-561-03
1205 N.
Professional &
Midtown Specific Plan
Broadway
Administration Office
(SP 3)
Page 6 PlacelFlorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
La Habra
\e5 � o �,�� 72
VoyP 39 ��eG
o�O
Fullerton
� God
Buena Park
Stanton
Garden Grove
Westminster 22
Huntington
Beach
Cypress
Fountain
Valley
Pacific Ocean
Brea
90
57
Anaheim
Santa Ana
C5)
Figure 1 - Regional Location Map
County \
14 \'.LpCHINO HILLS
0
Yorba Linda 4�y
Villa
Park
Orange
j
AA�1�
133:
\\ �NewportBeach \/3 Laguna Woods
Y RA
Viejo
Lake
Forest
0 3
Note: Unincorporated county areas are shown in white. Scale (Miles)
Source: ESRI, 2020
PlaceWlorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
2. Environmental Setting
Thi page intenlionalyleft blank.
Page 8 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Figure 2 - Project Location
Project Boundary
0 120
Scale (Feet)
Source: Nearmap, 2020
Place Forks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
2. Environmental Setting
Thi page intenlionalyleft blank.
Page 10 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
2. Environmental Setting
2.2.2 Surrounding Land Use and Zoning
The Project Site is located on one City block that is surrounded by the parcels zoned Midtown Specific Plan
(SP 3). The Midtown Specific Plan area is roughly bound by 17th Street to the north, Civic Center Drive to the
south, mid -block between Bush Street and Spurgeon Street to the east, and midblock between Broadway and
Durant Street to the west. General Plan land uses that make up the Midtown Specific Plan include: General
Commercial (GC), Professional & Administration Office (PAO), and District Center (DC). The Midtown
Specific Plan area is developed with a range of commercial uses, educational facilities, multi -family residential,
single-family residential, and Orange County services.
Outside the Midtown Specific Plan area and surrounding the Project Site, Two -Family Residence (R2), Multiple -
Family Residence (R3), Professional (P), and Open Space (0) land use designations are located to the west of
the Project Site; Community Commercial (Cl) and Arterial Commercial land use designations are located along
17th Street to the north; Multiple -Family Residence (R3) and French Park Historical District (Specific
Development No. 19) are located to the east; and the Transit Zoning Code (Specific Development No. 84) is
located to the south.
The Midtown Specific Plan parcels that surround the Project Site have a land use designation of Professional
& Administration Office (PAO) to the north, east and west; District Center (DC) to the south; and General
Commercial (GC) to the northeast. A two-story multi -family residential building and a surface parking lot is
located to the north of the Project Site, across 10th Street. Orange County services and the Orange County
School of the Arts is located to the east of the Project Site, across Sycamore Street. A surface parking lot is
located to the south of the Project Site, across W. Washington Avenue. Commercial uses and multi -family
residential uses are located across Broadway to the west of the Project Site.
2.2.3 Local and Regional Access
Access to the Project Site is provided by the surrounding street grid system. Direct access to the Project Site is
provide from Broadway (on the western side of the Project Site), Washington Avenue (on the northern side of
the Project Site), and Sycamore Street on the eastern side of the Project Site. The Santa Ana Freeway (I-5
Freeway) provides regional access to the Project Site and is located approximately 0.5 miles east of the Project
Site.
2.2.4 Public Transit
Consistent with statewide mandates (see AB 32, SB 375, SB 743) and SCAG's 2016-2040 RTP/SCS to place
increased density near major transportation and employment centers, the Proposed Project would introduce a
residential use within an approved office tower, which would provide for a mixed -use project. The Proposed
Project would place residents in the immediate vicinity of governmental offices, professional offices, shops and
services, restaurants; and would be within walking distance to public transit opportunities. Bus routes serving
the project area include OCTA routes 53/53X, 55, 60, 83,150, 560, and 862. These routes provide connections
to several areas countywide. In addition, the Project Site is about 0.7 miles west from the Santa Ana Regional
Transportation Station, which is served by regional trains including Amtrak and Metrolink, and bus lines such
Apri12020 Page 11
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
2. Environmental Setting
as Greyhound and several OCTA bus routes. The Proposed Project would be within walking distance of the
planned OC Streetcar, expected to be in operation in 2022. The Southern California Association of
Governments (SCAG) has designated the Project Site and the surrounding area as a Transit Priority Area (TPA).
2.2.5 General Plan and Zoning
Santa Ana General Plan
The Project Site's existing General Plan designation is One Broadway Plaza District Center (OBPDC) in the
City's General Plan Land Use map. The One Broadway Plaza is "envisioned as a landmark professional office
complex that will be a focal point in the Downtown Redevelopment area serving the Civic Center. complex,
Downtown, and Midtown urban areas." This land use designation allows for high intensity offices with
restaurant and ancillary retail. The OBPDC does not allow for residential.
Zoning
The Project Site is within the Specific Development 75 zone (SD75), One Broadway Plaza Specific
Development District, which is intended to "establish a professional district that will exclusively entitle a 37-
story 518,003 square foot office tower at the northeast corner of Tenth Street and Broadway within a historic
setting further north along Broadway to Washington Avenue." The Specific Development No. 75 Amendment
Application was adopted by City Council in April 2004. The Development Standards requires a floor area ratio
(FAR) of 2.9, an office tower of approximately 493 feet above grade, and a minimum of 2,463 parking spaces.
The One Broadway Plaza District does not allow for residential uses.
2.2.6 Environmental Resources
The Project Site has been developed, paved, landscaped and/or graded, and supports non-native, landscape
plant species. The Project Site is in an urbanized area and is currently developed with a seven residential and
converted residential to office buildings along Broadway, a one-story commercial building at the southwest
corner of Washington Avenue and Sycamore Street, surface parking along Sycamore Street, and a construction
site for the One Broadway Plaza office tower at the southern portion of the Project Site. The Project Site is
located in the One Broadway Plaza Specific Development District with one parcel within the Midtown Specific
Plan area. Additional information regarding environmental resources —or the lack of such resources —on the
Project Site can be found in Section 5, Environmental Analysis, of this Addendum under each respective
environmental topic.
Page 12 PlaceWorks
3. Project Description
3.1 PROJECT BACKGROUND
The One Broadway Plaza EIR was certified in 2004. The primary objective of the One Broadway Plaza Specific
Development District (SD 75) is to allow for the development of the One Broadway Plaza office tower, which
is intended to be a major landmark in the midtown section of the City of Santa Ana. The One Broadway Plaza
specific development plan includes the following objectives:
■ A landmark office project along Broadway at the center of the Midtown Specific Plan.
■ Maintain the existing streetscape pattern including sidewalk design mature palm trees and historic light
fixtures.
■ Maintain the scale and character established by the existing historic structures along the north end of the
district.
■ Maintain large open setbacks adjacent to Broadway.
■ Encourage revitalization of existing properties for a variety of professional office uses.
■ Enhance the pedestrian experience through the development of new plaza areas and water features at the
intersection of Sycamore Street and Tenth Street and Broadway and Tenth Street.
3.1.1 PREVIOUS ENVIRONMENTAL ANALYSIS
In 2004, the City of Santa Ana certified the EIR for One Broadway Plaza (State Clearinghouse No. 199101047),
herein referred to as the "Certified EIR." The EIR determined that most potential impacts could be mitigated
to a less than significant level. However, it concluded that the following topic areas would result in a significant
unavoidable adverse impact even after mitigation:
■ Air Quality. Air quality impacts relating to short-term construction would result in a significant impact for
PM10 and NO, and operation would result in a significant impact for long-term NO. emissions.
Transportation/Traffic. Implementation of the Approved Project would impact two street segments:
Main Street between 17th Street and Pt Street and Broadway between Santa Clara Avenue and 1st Street,
and seven intersections (Main Street & 17th Street; Broadway Street & 17th; Main Street & Washington
Avenue; Broadway Street & 4th Street; 1 st Street & Flower Street; Santa Ana Boulevard & Flower Street; and
Fairview & 1 st Street).
Apri12020 Page 13
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
3. Project Description
■ Utilities and Service Systems. The Approved Project would interfere with the transmission of television
signals from area television stations.
Aesthetics. The Approved Project would not be proportional to the scale of the existing land use on the
Project Site and it would create shade shadows on adjacent land uses.
■ Cultural Resources. The Approved Project would require the removal of three historic homes along
Broadway.
The project required a general plan amendment; amendment to the circulation element; amendment to the
Midtown Specific Plan; adoption of the One Broadway Plaza Specific Development Zoning District; tentative
map; vacation of Sycamore Street; encroachment permits/maintenance agreement; approval of inclusion of a
portion of State-owned property; Historical Resource Commission review for demolition requests; and a State
helipad permit. Therefore, implementation of the One Broadway Plaza Project, is herein referred to as the
"Approved Project."
The Approved Project includes the construction of a 37-story office building with an eight -level parking
structure and the rehabilitation of four existing structures into commercial office and restaurant offices. The
Approved Project include the abandonment of Sycamore Street between 10th Street and Washington Avenue
and the removal of three structures on the Project Site that are designated historically significant. The Approved
Project would retain and restore one other historic structure. The Certified EIR analyzed a project size of
545,124 total square feet, which includes office, rehabilitated office, retail, formal dining, and casual dining. The
Approved Project also includes an eight -level freestanding parking structure of approximately 2,500 spaces.
The Approved Project does not allow for residential uses. Table 2 below summarizes the Approved Project's
land uses.
Table 2: Approved Project Land Use Summary
Land Use
Square Feet
Office Building
508,200
Rehabilitated Office
9,803
Retail
8,525
Formal Dining
15,915
Casual Dining
2,681
TOTAL
545,124
Page 14 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
3. Project Description
3.2 PROJECT DESCRIPTION
The Proposed Project seeks to revise the existing entitlements of the One Broadway Plaza Project to permit
residential uses in place of some of the permitted office uses ("Proposed Project"). The Proposed Project
would incorporate residential units within up to 19 floors, which were previously designated for office uses
under the Approved Project. The Proposed Project would provide up to 415 apartment units for a total of
about 318,153 residential square feet. Residential units would range between 500 square feet to 1,250 square
feet. Under the Proposed Project, approximately 60 percent of the office space would be dedicated to
residential uses and 40 percent of the office space would remain. No changes to the retail dining square footage
would occur. The residential component would include penthouse suites, standard and executive residential
units, and affordable units. The non-residential components would include office, restaurants, commercial uses,
and wellness fitness center with a spa, a parking structure, and live performance and presentation space. Table
3 below compares the Proposed Project buildout with the Approved Project build out.
The Proposed Project would require amendments to the City's General Plan Land Use Element and the One
Broadway Plaza Specific Development District (SD 75) to allow for the inclusion of residential uses. The
General Plan Land Use Element would be amended to permit residential development along with associated
amendments to development density and intensity as needed. The SD 75 zone would be amended to allow
residential development and incorporate development standards for residential development.
Table 3 Proposed Proiect Buildout Comparison with ADDroved Project
Land Use
Approved Project
(Square Feet)
Proposed Project
(Square Feet)
Office
508,200
190,047
Rehabilitated Office
9,803
9,803
Residential
318,153
Retail
8,525
8,525
Formal Dining
15,915
15,915
Casual Dining
2,681
2,681
TOTAL
545,124
545,124
3.3 DISCRETIONARY ACTIONS
This Addendum to the Certified EIR is intended to serve as the primary environmental document for all future
actions associated with the Proposed Project, including all discretionary approvals requested or required to
implement the Proposed Project. In addition, this Addendum is the primary reference document for the
formulation and implementation of the MMRP. All the approved, applicable measures from the Certified EIR
have been incorporated into this document. This document is intended to provide sufficient information to
allow the City of Santa Ana and any other permitting agencies to evaluate the potential impacts from
construction and implementation of the Proposed Project. The following discretionary actions have been
requested by the Project Applicant:
Apri12020 Page 15
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
3. Project Description
■ General Plan Amendment No. 2020-01. The applicant is requesting approval of a general plan
amendment to allow residential uses on the Project Site. The current One Broadway Plaza District Center
(OBPDC) General Plan Land Use designation does not currently allow for residential uses.
■ Zoning Ordinance Amendment No. 2020-02. The applicant is requesting approval of a Zoning
Ordinance Amendment to allow residential uses in the One Broadway Plaza Specific Development District
(SD 75) and create development standards for residential uses including density/unit provisions. The
Zoning Ordinance Amendment would also adjust FAR and revise parking requirements. The current One
Broadway Plaza Specific Development District (SD 75) designation does not allow for residential uses.
Page 16 PlaceWorks
4. Environmental Checklist
4.1 BACKGROUND
1. Project Title: One Broadway Plaza Project EIR Addendum
2. Lead Agency Name and Address:
City of Santa Ana
Planning Division
20 Civic Center Plaza
Santa Ana, CA 92701
3. Contact Person and Phone Number:
Vince Fregoso, AICP
Planning Manager
(714) 667-2713
4. Project Location:
The Project Site is bound by Washington Avenue to the north, Sycamore Street to the east, 10th Street to
the south, and Broadway to the west. The Project Site is located in the City of Santa Ana, Orange
County, California.
5. Project Sponsor's Name and Address:
Caribou Industries, Inc.
Mike Harrah
1103 North Broadway
Santa Ana, CA 92701
6. General Plan Designation: One Broadway Plaza District Center (OBPDC); Professional &
Administration Office (PAO)
7. Zoning: One Broadway Plaza Specific Development District (SD 75); Midtown Specific Plan (SP3)
8. Description of Project:
The Proposed Project seeks to revise the existing entitlements of the One Broadway Plaza Project to
permit residential uses in place of some of the permitted office uses ("Proposed Project"). The Proposed
Project would incorporate residential units within up to 19 floors and include up to 415 apartment units
for a total of approximately 318,153 residential square feet. The residential component would include
penthouse suites, standard and executive residential units, and affordable units. Residential unit sizes
would range from 500 square feet to 1,250 square feet.
Apri12020 Page 17
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
4. Environmental Checklist
9. Surrounding Land Uses and Setting:
The Project Site is primarily surrounded by the area zoned as Midtown Specific Plan (SP3) with land use
designations including General Commercial, Professional & Administration Offices, and District Center.
The Project Site is surrounded by commercial uses, educational facilities, multi -family residential, single-
family residential, and Orange County services.
10. Other Public Agencies Whose Approval Is Required (e.g., permits, financing approval, or
participation agreement):
None.
Page 18 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
4. Environmental Checklist
4.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one
impact that would represent a new significant environmental effect, a substantial increase in the severity of a
significant impact previously identified, or new information of substantial importance, as indicated by the
checklist on the following pages.
❑
Aesthetics
❑
Agricultural and Forest Resources
❑
Air Quality
❑
Biological Resources
❑
Cultural Resources
❑
Energy
❑
Geology / Soils
❑
Greenhouse Gas Emissions
❑
Hazards & Hazardous Materials
❑
Hydrology / Water Quality
❑
Land Use / Planning
❑
Mineral Resources
❑
Noise
❑
Population / Housing
❑
Public Services
❑
Recreation
❑
Transportation
❑
Tribal Cultural Resources
❑
Utilities / Service Systems
❑
Wildfire
❑
Mandatory Findings of Significance
4.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)
On the basis of this initial evaluation:
I find that the Proposed Project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
I find that although the Proposed Project could have a significant effect on the environment, there will
not be a significant effect in this case because revisions in the project have been made by or agreed to by the
project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the Proposed Project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the Proposed Project MAY have a "potentially significant impact" or "potentially significant
unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an
earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures
based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is
required, but it must analyze only the effects that remain to be addressed.
® I find that although the Proposed Project could have a significant effect on the environment, because
all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE
DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that
earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed
upon the Proposed Project, nothing further is required.
Signature Date
Printed Name For
Apri12020 Page 19
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
4. Environmental Checklist
4.4 EVALUATION OF ENVIRONMENTAL IMPACTS
1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported
by the information sources a lead agency cites in the parentheses following each question. A "No Impact"
answer is adequately supported if the referenced information sources show that the impact simply does not
apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact"
answer should be explained where it is based on project -specific factors, as well as general standards (e.g.,
the project would not expose sensitive receptors to pollutants, based on a project -specific screening
analysis).
2) All answers must take account of the whole action involved, including off -site as well as on -site, cumulative
as well as project -level, indirect as well as direct, and construction as well as operational impacts.
3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers
must indicate whether the impact is potentially significant, less than significant with mitigation, or less than
significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may
be significant. If there are one or more "Potentially Significant Impact" entries when the determination is
made, an EIR is required.
4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the
incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less
Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how
they reduce the effect to a less than significant level.
5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an
effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In
this case, a brief discussion should identify the following:
a) Earlier Analyses Used. Identify and state where they are available for review.
b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the
scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and
state whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures
Incorporated," describe the mitigation measures which were incorporated or refined from the earlier
document and the extent to which they address site -specific conditions for the project.
6) Lead agencies are encouraged to incorporate into the checklist references to information sources for
potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside
document should, where appropriate, include a reference to the page or pages where the statement is
substantiated. A source list should be attached, and other sources used or individuals contacted should be
cited in the discussion.
7) Supporting Information Sources: A source list should be attached, and other sources used or individuals
contacted should be cited in the discussion.
Page 20 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
4. Environmental Checklist
8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies
should normally address the questions from this checklist that are relevant to a project's environmental
effects in whatever format is selected.
9) The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and
b) the mitigation measure identified, if any, to reduce the impact to less than significant.
Apri12020 Page 21
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
4. Environmental Checklist
Thi page intenlionalyleft blank.
Page 22 PlaceWorks
5. Environmental Analysis
This section provides evidence that no new significant impacts would occur as a result of either a change to
the project or a change in circumstances. In accordance with Section 21166 of CEQA and 15162 of the CEQA
Guidelines, and relevant case law, the baseline for this determination is the Approved Project. The section will
briefly summarize the conclusions of the 2004 Certified EIR and then discuss whether or not the Proposed
Project is consistent with the findings in that document. Applicable mitigation measures are referenced from
the 2004 Certified EIR, are also provided in each section.
As discussed previously, this document is an addendum to the 2004 Certified EIR. The Proposed Project is
located in the One Broadway Plaza Specific Development Zoning District with a corresponding General Plan
land use designation of One Broadway Plaza District Center.
The mitigation program identified to reduce potential impacts of the Proposed Project consists of Standard
Requirements (SRs) and mitigation measures (MMs). The components of the mitigation program are described
below.
Standard Requirements. Existing SRs are based on local, state, or federal regulations or laws that are
frequently required independently of CEQA review and also serve to offset or prevent specific impacts.
Typical SRs include compliance with the provisions of the California and local building codes, South Coast
Air Quality Management District rules, City ordinances, and local agency impact fees, among others.
Mitigation Measures. Where a potentially significant environmental effect has been identified and is not
reduced to a level considered less than significant through the application of SRs, mitigation measures have
been provided. All applicable measures have been carried through from the One Broadway Plaza EIR.
These mitigation measures have been incorporated into the MMRP for this Addendum. Any modifications
to the mitigation measures from the Certified EIR are shown as for deleted text and bold
for new, inserted text.
The City may substitute, at its discretion, any mitigation measure (and timing thereof) that has: (1) The same or
superior result as the original mitigation measure and (2) the same or superior effect on the environment. The
City of Santa Ana Planning and Building Agency, Planning Division, in conjunction with any appropriate
agencies or City departments, shall determine the adequacy of any proposed "environmental equivalent timing"
and, if deemed necessary, may refer said determination to the Planning Commission.
Apri12020 Page 23
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.1 AESTHETICS
5.1.1 Summary of Previous Environmental Analysis
The Certified EIR determined that the mass and scale of the Approved Project would be taller than the existing
one to two-story structures on the Project Site and surrounding buildings. The mass and scale of the Approved
Project would be in contrast to the existing development pattern in the area and would be visible from many
areas across Santa Ana. However, the Approved Project's design would not visually degrade the project area,
and it would not obstruct views to or from parks, open space, or landmarks as none exist near the site. The
Approved Project would create shade and shadow impacts to adjacent land uses that are not impacted from
shade from land uses on the Project Site. Due to the Approved Project's size, the Certified EIR determined
that impacts to visual impacts and shade pattern would be significant and adverse.
The office tower and parking structure would be developed with non -reflective surfaces and would result in a
less than significant impact relating to glare. The Approved Project would introduce more light to the project
area that could impact adjacent land uses, however implementation of mitigation measure AS-1 would reduce
impacts to a less than significant level.
5.1.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Have a substantial adverse effect on a
scenic vista?
X
b) Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within a
X
state scenic highway?
c) In non -urbanized area, substantially degrade
the existing visual character or quality of
public views of the site and its surroundings?
(Public views are those that are experienced
from publicly accessible vantage point.) If the
X
project is in an urbanized area, would the
project conflict with applicable zoning and
other regulations governing scenic quality?
d) Create a new source of substantial light or
glare which would adversely affect day or
X
nighttime views in the area?
Page 24 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Have a substantial adverse effect on a scenic vista?
No Impact. The Proposed Project amends the entitlements for the Approved Project to allow for the
development of residential units in place of some of the office square footage. The Proposed Project would
not result in the development of new building square footage beyond what was previous analyzed in the
Certified EIR. As such, the Proposed Project would result in no new impacts to scenic vistas and no mitigation
measures are necessary. No changes or new information would require preparation of a subsequent EIR.
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
No Impact. The Proposed Project would occur within the building envelope of the Approved Project's office
tower. The Proposed Project would not result in the development of new building square footage beyond what
was previous analyzed in the Certified EIR. Therefore, the Proposed Project would not lead to the damage of
scenic resources. The Proposed Project would result in no new impacts to scenic resources and no mitigation
measures are necessary. No changes or new information would require preparation of a subsequent EIR.
c) In non -urbanized area, substantially degrade the existing visual character or quality of public
views of the site and its surroundings? (Public views are those that are experienced from publicly
accessible vantage point.) If the project is in an urbanized area, would the project conflict with
applicable zoning and other regulations governing scenic quality?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR analyzed the Approved Project's impact on character and views, as discussed above. The
Project Site is located in an urbanized area within the City of Santa Ana. The Proposed Project would amend
the existing OBPDC land use and SD-75 zoning designations to allow for residential uses. With approval of
the discretionary actions, the Proposed Project would be consistent with the land use designation and zoning
for the Project Site. The Proposed Project would occur within the building envelope of the Approved Project
and would not result in new or expanded construction outside of the approved office tower. In addition,
pursuant to SB 743, aesthetic impacts of a mixed -use residential project on an infill site within a TPA shall not
be considered a significant impact on the environment. Therefore, the Proposed Project would not result in
new aesthetic impacts or impact regulations affecting scenic quality.
d) Create a new source of substantial light or glare which would adversely affect day or nighttime
views in the area?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Approved Project includes office, restaurant, and retail uses on -site with its associated parking structure.
The Proposed Project would introduce residences to the previously approved office tower, which would
increase the number of persons and therefore lighting on the Project Site at nighttime hours. Interior lighting
emanating from residential units would be typical of residential units and would not create a substantial light
Apri12020 Page 25
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
source. As with the Approved Project, the implementation of mitigation measure AS-1 would ensure that
exterior lighting and fixtures would ensure that lighting impacts are less than significant.
The Proposed Project's would result in no changes to the non -reflective exterior building materials under the
Approved Project; similarly, the Proposed Project would result in a less than significant impact to glare.
5.1.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as strikegh for deleted text and bold for new,
inserted text.
AS-1 The project proponent will ensure that all outdoor lighting and fixtures, including lighting for
construction, are shielded or designed and located to minimize nighttime light spillage onto adjacent
uses. Outdoor fixtures will be designed to generate less than 0.25-foot candle power of light where
possible, and will direct lighting towards the interior of the project site.
5.2 AGRICULTURE AND FOREST RESOURCES
5.2.1 Summary of Previous Environmental Analysis
With respect to agricultural resources, the Initial Study concluded that the Project Site is located in an urbanized
area and is developed with residential and commercial uses. Soils within the Project Site are not candidates for
listing as prime farmland, unique farmland, or farmland of statewide importance. In addition, the Project Site
does not contain land zoned for agricultural uses nor a Williamson Act contract. No agricultural uses exist on
site or adjacent to the Project Site. Therefore, no impact would occur with respect to agricultural uses, and no
additional analysis is required in Certified EIR. The 2004 EIR and its corresponding Initial Study did not analyze
Forestry Resources. Forestry resources are discussed below.
5.2.2 Impacts Associated with the Proposed Project
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies
may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the
California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland.
In determining whether impacts to forest resources, including timberland, are significant environmental effects,
lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection
regarding the state's inventory of forest land, including the Forest and Range Assessment Project and the Forest
Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols
adopted by the California Air Resources Board. Would the project:
Page 26 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Convert Prime Farmland, Unique Farmland,
or Farmland of Statewide Importance
(Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping
X
and Monitoring Program of the California
Resources Agency, to nonagricultural use?
b) Conflict with existing zoning for agricultural
use, or a Williamson Act contract?
X
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code section 1222O(g)),
timberland (as defined by Public Resources
X
Code section 4526), or timberland zoned
Timberland Production (as defined by
Government Code section 511O4(g))?
d) Result in the loss of forest land or
conversion of forest land to non -forest use?
X
e) Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of
X
Farmland, to non-agricultural use or
conversion of forest land to non -forest use?
Comments:
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland),
as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of
the California Resources Agency, to nonagricultural use?
No Impact. As indicated above, the Project Site is not a candidate for listing as prime farmland, unique
farmland, or farmland of statewide importance. The Project Site is not zoned for agricultural uses and no
farmland or agricultural activity exist on -site. Similar to the Approved Project, the Proposed Project would not
convert important farmland to a nonagricultural use. No impact would occur and no mitigation is necessary.
Accordingly, no new significant impacts or impacts of greater severity than those previously identified in the
Certified EIR would occur. No changes or new information would require preparation of a subsequent EIR.
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
No Impact. The Project Site is not zoned for agricultural use and no active Williamson Act contract exist on
site. As with the Approved Project, implementation of the Proposed Project would not conflict with agricultural
zones or a Williamson Act contract. No impact would occur and no mitigation is necessary. Accordingly, no
Apri12020 Page 27
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
new significant impacts or impacts of greater severity than those previously identified in the Certified EIR
would occur. No changes or new information would require preparation of a subsequent EIR.
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources
Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or
timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
No Impact. The Project Site is in an urbanized location and does not contain forest land or timberland. The
Project Site and the surrounding area are not zoned for forest land or timberland and do not contain forestland
or timberland. The Proposed Project would not conflict with zoning for forest land or timberland. No impact
would occur and no mitigation is necessary.
d) Result in the loss of forest land or conversion of forest land to non -forest use?
No Impact. The Project Site does not contain forest land. The implementation of the Proposed Project would
not result in the loss of forest land or the conversion of forest land to non -forest uses. No impact would occur
and no mitigation is necessary.
e) Involve other changes in the existing environment which, due to their location or nature, could
result in conversion of Farmland, to non-agricultural use or conversion of forest land to non -forest
use?
No Impact. The Project Site and surrounding area are urban and contain no farmland or forest land. The
implementation of the Proposed Project would not result in the loss of forest land or the conversion of forest
land to non -forest uses. No impact would occur and no mitigation is necessary. Accordingly, no new significant
impacts or impacts of greater severity than those previously identified in the Certified EIR would occur. No
changes or new information would require preparation of a subsequent EIR.
5.2.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to agricultural resources are applicable to the Proposed Project.
5.3 AIR QUALITY
5.3.1 Summary of Previous Environmental Analysis
The Certified EIR determined that construction of the Approved Project could result in short-term air quality
impacts from construction equipment and fugitive dust. Construction of the Approved Project would exceed
SCAQMD's emission thresholds for NOX and PM10 emissions. The Certified EIR identifies mitigation measures
that would reduce impacts from construction equipment and dust to a less than significant level; however, the
Approved Project's emissions of NOX and PM10 remain significant and unavoidable.
The Certified EIR determined that the long-term operation of the Approved Project could generate air quality
pollutants. The Certified EIR found that long-term operation of the Approved Project would exceed
SCAQMD's emission thresholds for NOX emissions. The Certified EIR identifies mitigation measures for long -
Page 28 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
term pollution; however, the Approved Project's emissions of NO. would remain significant and unavoidable.
The Approved Project would found to result in a less than significant impact to CO emissions (local air quality).
The Certified EIR found that the Approved Project is consistent with the South Coast Air Quality Management
Plan.
The Initial Study for the Certified EIR determined that the Approved Project would not result in the significant
amounts of objectionable odors or create an adverse effect. A less than significant impact would occur.
5.3.2 Impacts Associated with the Proposed Project
Where available, the significance criteria established by the applicable air quality management district or air
pollution control district may be relied upon to make the following determinations. Would the project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Conflict with or obstruct implementation of
the applicable air quality plan?
X
b) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non -attainment under
X
an applicable federal or state ambient air
quality standard?
c) Expose sensitive receptors to substantial
pollutant concentrations?
X
d) Result in other emissions (such as those
leading to odors) adversely affecting a
X
substantial number of people?
Methodology
Urban Crossroads prepared a memorandum reviewing Air Quality and Greenhouse Gas Emissions for the
Proposed Project (AQ/GHG Memo) dated April 16, 2020. The AQ/GHG Memo is contained in Appendix
A. Emissions for the Proposed Project were calculated employing the California Emissions Estimator Model
(CalEEMod) version 2016.3.2.
Comments:
a) Conflict with or obstruct implementation of the applicable air quality plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Air quality in Orange County is regulated by SCAQMD, which is the agency principally responsible for
comprehensive air pollution control in the South Coast Air Basin (SoCAB). The SCAQMD develops rules and
Apri12020 Page 29
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
regulations; establishes permitting requirements for stationary sources; inspects emissions sources; and enforces
such measures through educational programs or fines, when necessary for over an approximately 10,743 square -
mile area. The SCAQMD is directly responsible for reducing emissions from stationary (area and point), mobile,
and indirect sources. The Proposed Project supports AQMP objectives to reduce trips, promote infill
development, and balance jobs and housing and would not conflict with implementation of the AQMP.
In March of 2017, the SCAQMD Governing Board released the Final 2016 AQMP, which continues to evaluate
current integrated strategies and control measures to meet the NAAQS, as well as, explore new and innovative
methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing
co -benefit programs from other sectors, and developing a strategy with fair -share reductions at the federal,
state, and local levels.
The two principal criteria for conformance with the AQMP are:
1. Whether the project would result in an increase in the frequency or severity of existing air quality
violations or contribute to new violations or delay the timely attainment of air quality standards or
the interim emissions reductions specified in the AQMP.
2. Whether the project would exceed the assumptions in the AQMP based on the years of Project
build -out phase.
With respect to the first criterion, implementation of the Proposed Project would not exceed the regional
significance thresholds for construction or operational activity after implementation. Therefore, the Proposed
Project would not conflict with the AQMP according to this criterion. The Proposed Project would not generate
short-term or long-term emissions of criteria pollutants that could potentially cause an increase in the frequency
or severity of existing air quality violations; cause or contribute to new violations; or delay timely attainment of
air quality standards beyond those impacts considered in the Certified EIR.
With respect to the second criterion, implementation of the Proposed Project according to the AQ/GHG
Memo prepared by Urban Crossroads would not exceed regional or local thresholds for construction or
operational impacts and would therefore have less than significant impacts. The Proposed Project would not
exceed SCAG's population, housing, or employment projections. The Project would not result in or cause
NAAQS or CAAQS violations nor would it result in any regional daily construction -source or operational -
source emissions exceedances. The Project would support AQMP objectives to reduce trips, promote infill
development, and balance jobs and housing, and would not conflict with implementation of the AQMP. The
Project is therefore considered to be consistent with the AQMP. Therefore, the Proposed Project would be
consistent with the region's AQMP. There would be no new significant impact or a substantial increase in the
severity of previously identified effects.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project
region is non -attainment under an applicable federal or state ambient air quality standard?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR disclosed that construction -related NO, and PM10 emissions would be significant and
Page 30 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
unavoidable. Construction of the Proposed Project would occur within the building envelope of the Approved
Project and would not expand the building footprint nor require additional grading or excavation. Thus, the
Proposed Project's construction -related air quality emissions would be within the scope of analysis of the
Approved Project identified in the Certified EIR. The Proposed Project would further incorporate all applicable
mitigation measures identified in the Certified EIR. Therefore, the Proposed Project would not create a new
significant impact or a substantial increase in the severity of previously identified effects.
Table 4, Proposed Pr ject Operational Emission Summary, shows that the maximum daily operational -source criteria
pollutant emissions generated by the Proposed Project. The Proposed Project's operational emissions would
not exceed the regional thresholds of significance established by the SCAQMD for any criteria emissions.
Table 4 Proposed Project Operational Emission Summary
Operational Activities - Summer
Scenario
Emissions (pounds per day)
VOC
NOx
CO
SOX
PM10
PM2.e
Area
12.96
0.40
34.38
1.81 E-03
0.19
0.19
Energy
0.34
2.99
2.02
0.02
0.23
0.23
Mobile
5.48
19.37
55.54
0.18
15.19
4.18
Total Maximum Daily Emissions
18.78
22.76
91.93
0.20
15.61
4.61
SCAQMD Regional Threshold
55
55
550
150
150
55
Threshold Exceeded?
NO
NO
NO
NO
NO
NO
Operational Activities -Winter
Scenario
Emissions (pounds per day)
VOC
NOx
CO
sox
PM10
PM2.5
Area
12.96
0.40
34.38
1.81 E-03
0.19
0.19
Energy
0.34
2.99
2.02
0.02
0.23
0.23
Mobile
5.41
19.77
54.69
0.17
15.19
4.18
Total Maximum Daily Emissions
18.71
23.16
91.09
0.19
15.61
4.61
SCAQMD Regional Threshold
55
55
550
150
150
55
Threshold Exceeded?
NO
NO
NO
NO
NO
NO
Further, Table 5, Operational Emission Comparison, compares peak operational -source criteria pollutant emissions
generated by the Proposed Project with peak operational -source criteria pollutant emissions generated by the
Currently Approved One Broadway Plaza land uses. As indicated at Table 5, the Proposed Project would result
in a net decrease in peak operational -source VOC, NOx, CO, and SOx emissions when compared to peak
operational -source criteria pollutant emissions generated by the Approved Project. The Certified EIR disclosed
that operational NOx emissions from the Approved Project would be significant and unavoidable. With the
Proposed Project, NOx impacts would be reduced to a less than significant level. The Proposed Project's
operational air quality emissions would be less than significant. The Proposed Project would reduce the
significant and unavoidable impact relating to operational NOx to a less than significant level. Although PM10
emissions go up slightly with the Proposed Project, they remain below AQMM's Significance Criteria.
Therefore, the Proposed Project would not create a new significant impact or a substantial increase in the
severity of previously identified effects. The Proposed Project would further incorporate all applicable
Apri12020 Page 31
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
mitigation measures identified in the Certified EIR. The Proposed Project would not require major revisions
to the Certified EIR.
Table 5 Operational Emission Comparison
Operational Activities
Emissions (pounds per day)
vOC
NO,
CO
sox
PM10
PM2.5
Proposed Project
18.78
23.16
91.93
0.20
15.61
4.61
Approved One Broadway Plaza
31.60
76.10
462.20
41.30
8.50
-
Difference
.12.82
-52.94
-370.27
-41.10
7.11
NIA
c) Expose sensitive receptors to substantial pollutant concentrations?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that the Approved Project would result in a less than significant impact relating
to local carbon monoxide concentrations. The Certified EIR found that the Approved Project's CO emissions
would be incompliance with the 1-hour and 8-hour state and federal standards. As discussed above, the
construction of the Proposed Project would be within the envelope of the Approved Project. The Proposed
Project would not expand the Approved Project's building footprint or require additional grading and
excavation. Therefore, the Proposed Project would not create a new significant impact or a substantial increase
in the severity of previously identified effects. The Proposed Project would not require major revisions to the
Certified EIR.
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number
of people?
No Impact. The Initial Study to the Certified EIR found that the Approved Project's office and commercial
uses would result in a less than significant impact to objectionable odors. According to SCAQMD, land uses
associated with odor complaints typically include agricultural uses, wastewater treatment plants, food processing
plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding facilities. The Proposed
Project does not include any uses identified by the SCAQMD as being associated with odors and therefore
would not produce objectionable odors. As such, the Proposed Project would have no impact related to
objectionable odors. The Proposed Project would comply with SCAQMD Rule 402 to prevent occurrences of
public nuisances (34). No changes or new information would require preparation of a subsequent EIR.
5.3.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as for deleted text and bold for new,
inserted text.
AQ-1 Use low -emission mobile construction equipment where feasible.
Page 32 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
AQ-2 Water site and clean equipment morning and evening to comply with AQMD Fugitive Dust
Measures BCM-03 and BCM-06. As part of the conditions of grading permit approval, the
project shall water the construction site and unpaved haul roads (with use of reclaimed water
or chemical soil binder, where feasible) twice daily.
AQ-3 Wash off trucks leaving the site to comply with AQMD Fugitive Dust Measure BCM-01. As
part of the conditions of grading permit approval, project construction contractors shall
wheel wash construction equipment and cover dirt in trucks during on -road hauling. This
is already ineluded in the partietdate emi E)fts in the rep Haul trucks
leaving the site shall also have a minimum freeboard distance of 12", or cover payloads.
AQ-4 Sweep streets if silt is carried over to adjacent public thoroughfares.
AQ-5 Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less.
AQ-6 Suspend grading operations during first and second stage smog alerts.
AQ-7 Suspend all grading operations when wind speeds (as instantaneous gusts) exceed 25 miles per
hour.
AQ-8 Maintain construction equipment engines by keeping them tuned.
AQ-9 Where feasible use low sulfur fuel for stationary construction equipment.
AQ-10 Where feasible utilize existing power sources (e.g., power poles) or clean fuel generators rather
than temporary power generators.
AQ-11 Provide on -site power sources during the early stages of the project.
AQ-12 Where feasible use low emission on -site stationary equipment (e.g. clean fuels).
AQ-13 Spread soil binders on site, unpaved roads and parking areas.
AQ-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive
construction areas (previously graded areas which remain inactive for 96 hours).
AQ-15 Reestablish groundcovers on construction site through seeding and watering of the site that
will not be disturbed for lengthy periods (such as two months or more).
AQ-16 Schedule truck deliveries and pickups during off-peak hour.
AQ-17 Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle
idling at curbsides.
AQ-18 Provide dedicated turn lanes as appropriate and provide roadway improvements at heavily
congested roadways.
Apri12020 Page 33
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
AQ-19 Provide on -site services.
AQ-20 Improve thermal integrity of the buildings and reduce thermal load with automated time
clocks or occupant sensors.
AQ-21 Install energy efficient street and parking lot lighting.
AQ-22 Comply with the AQMP Miscellaneous Sources PRC-03 to reduce emissions of restaurant
operations. Introduce efficient heating and other appliances, such as water heaters, cooking
equipment, refrigerators, furnaces and boiler units. Also, incorporate appropriate passive solar
design and solar heaters. This measure is intended to reduce VOC and PMlo emissions.
AQ-23 Provide lighter color roofing and road materials and tree planting programs to comply with
the AQMP Miscellaneous Sources MSC-01 measure.
AQ-24 Provide local shuttle and transit shelters and ridematching services to comply with Advanced
Transportation Technology ATT-02.
AQ-25 Ensure efficient parking management.
AQ-26 Provide preferential parking to high occupancy vehicles and shuttle services. Also, designate
additional car pool or vanpool parking.
AQ-27 Employers should provide variable work hours and telecommuting to employees to comply
with Advanced Transportation Technology ATT-01.
AQ-28 Provide dedicated parking spaces with electrical outlets for electrical vehicles.
AQ-29 Employers should provide ridematching, guaranteed ride home, or car pool or vanpool to
employees as a part of the TDM program and to comply with the AQMP Transportation
Improvements TCM-01 measure.
AQ-30 Employers should provide compensation, prizes or awards to ridesharers.
AQ-31 The City should synchronize traffic signals in the vicinity of the project site.
AQ-32 Introduce window glazing, wall insulation, and efficient ventilation methods.
5.4 BIOLOGICAL RESOURCES
5.4.1 Summary of Previous Environmental Analysis
Biological Resources were addressed in the Approved Project's Initial Study. The Certified EIR identified the
Project Site as being within an urbanized area. The Initial Study prepared for the Approved Project determined
that Approved Project would not have a substantial adverse effect, either directly or through habitat
modification on any species, identified as candidate, sensitive, or special status; on any riparian habitat or other
Page 34 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
sensitive natural community; or federally protected wetlands. The Approved Project would not interfere with
the movement of any native resident or migratory fish or wildlife species or with established native resident or
migratory wildfire corridor or impede native wildlife nursery sites.
The Approved Project would not conflict with any local policies or ordinances protecting biological resources,
since there are no significant biological resources on the Project Site. The Project Applicant would replace
significant trees removed from the Project Site with new trees planned as part of the Approved Project's
landscaping plan.
No adopted Habitat Conservation Plan, Natural Community Conservation, or other habitat conservation plan
exist on the Project Site.
5.4.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Have a substantial adverse effect, either
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special status species in local
X
or regional plans, policies, or regulations, or
by the California Department of Fish and
Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
X
California Department of Fish and Game or
U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on state
or federally protected wetlands (including,
but not limited to, marsh, vernal pool,
X
coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
d) Interfere substantially with the movement of
any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
X
impede the use of native wildlife nursery
sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a
X
tree preservation policy or ordinance?
Apri12020 Page 35
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
f) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural
X
Community Conservation Plan, or other
approved local, regional, or state habitat
conservation plan?
The Project Site and the surrounding area are located in an urban area. The Project Site is fully developed
and/or disturbed with converted residences, a one story commercial building, and surface parking lots. The
southern portion of the Project Site is currently under construction for the Approved Project.
Comments:
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
No Impact. The Project Site does not contain habitat for candidate, sensitive, or special status species.
Therefore, the Proposed Project would have no impact on these types of species. No impact would occur and
no mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity than those
previously identified in the Certified EIR would occur. No changes or new information would require
preparation of a subsequent EIR.
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community
identified in local or regional plans, policies, regulations, or by the California Department of Fish
and Game or U.S. Fish and Wildlife Service?
No Impact. As analyzed in the Certified EIR, the Project Site is completely developed and/or disturbed and
does not contain riparian habitat or other sensitive natural community. Therefore, the Proposed Project would
have no impact on these communities and no mitigation is necessary. Accordingly, no new significant impacts
or impacts of greater severity than those previously identified in the Certified EIR would occur. No changes
or new information would require preparation of a subsequent EIR.
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not
limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological
interruption, or other means?
No Impact. The Project Site is not in proximity to, nor does it contain federally protected wetlands or a blueline
stream as defined by the Clean Water Act (USFWS 2020). Therefore, as with the Approved Project,
implementation of the Proposed Project would not adversely affect wetlands. No impact would occur and no
Page 36 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity than those
previously identified in the Certified EIR would occur. No changes or new information would require
preparation of a subsequent EIR.
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife
species or with established native resident or migratory wildlife corridors, or impede the use of
native wildlife nursery sites?
No Impact. The Project Site is fully developed and/or disturbed and is located within an urbanized area. The
Project Site and the surrounding area do not include wildlife habitat or native wildlife nursery sites. The Project
Site is not located within a movement corridor for native fish or wildlife. As with the Approved Project,
implementation of the Proposed Project would not affect these types of biological resources. No impact would
occur and no mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity
than those previously identified in the Certified EIR would occur. No changes or new information would
require preparation of a subsequent EIR.
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree
preservation policy or ordinance?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would not result in new building square footage beyond the approved building envelope.
As such, the Proposed Project would not result in the removal of any additional trees. Operation of the One
Broadway Plaza project would be required to comply with the City's tree preservation ordinance (Chapter 33,
Article VII of the Municipal Code). As with the Approved Project, implementation of the Proposed Project
would not conflict with any local policies or ordinances protecting biological resources and no impact would
occur. No mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity than
those previously identified in the Certified EIR would occur. No changes or new information would require
preparation of a subsequent EIR.
f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community
Conservation Plan, or other approved local, regional, or state habitat conservation plan?
No Impact. As with the Approved Project, the Proposed Project is not within an adopted Habitat
Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat
conservation plan. The Project Site is also within an urbanized area; and the Proposed Project would not result
in construction of new building square footage beyond what was previously approved. As such, no impact to
an adopted habitat conservation plan, NCPP, or other local, regional, or state habitat conservation plan would
occur from implementation of the Proposed Project and no mitigation is necessary. Accordingly, no new
significant impacts or impacts of greater severity than those previously identified in the Certified EIR would
occur. No changes or new information would require preparation of a subsequent EIR.
5.4.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to biological resources are applicable to the Proposed Project.
Apri12020 Page 37
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.5 CULTURAL RESOURCES
5.5.1 Summary of Previous Environmental Analysis
The Approved Project would result in the removal of several structures that are identified as historic resources
by the City Register of Historical Property (SARHP), including 1007-1009 N. Broadway (Yale Apartments),
1015 N. Broadway (Twist -Basler House), 1109 N. Broadway (Koenig House). Additional structures listed on
the SARHP would be retained and rehabilitated including 1103 N. Broadway (McNeill -Basler House), 1115-
1117 N. Broadway (Macintosh Apartments), and 1211 N. Broadway (Kelley House). The property at 1205 N.
Broadway (Walter Moore House) is also listed on the SARHP and would remain in its existing location;
however, the house is considered out of the project and there are no plans to rehabilitate it. The Twist -Basler
House, McNeill -Basler House, and Koenig House are eligible for listing on National and California Registers.
The Certified EIR identifies mitigation measures to address the Approved Project's impact on the historic
resources; however, the Approved Project would result in a significant and unavoidable impact to materially
impairing historic resources.
The Certified EIR found that development of the Approved Project would have the potential to uncover
archeological resources and human remains. With the incorporation of Mitigation Measures CR-5 through
CR-8, impacts to archeological resources and human remains would be less than significant.
5.5.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Cause a substantial adverse change in the
significance of a historical resource
X
pursuant to § 15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource
X
pursuant to § 15064.5?
c) Disturb any human remains, including those
interred outside of formal cemeteries?
X
The City maintains a local inventory of historic structures, the Santa Ana Register of Historic Properties
(SARHP); the SARHP was last updated in February 3, 2020. The Project Site includes five properties listed on
the Register of Historic Properties. These properties include the McNeill -Basler House (1103 N. Broadway,
SARHP #52); Koenig House (1109 N. Broadway, SARHP #68); the Walter Moore House (1205 N. Broadway,
SARHP #69); 1115-1117 N. Broadway (Macintosh Apartments, SARHP #102); and Kelley House (1211 N.
Page 38 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Broadway, SARHP #104). The SARHP notes that the Twist -Basler House/Basler Home is no longer at the
Project Site and it was relocated to Cabrillo Park, Tennis Center (Santa Ana 2020).
Comments:
a) Cause a substantial adverse change in the significance of a historical resource pursuant to
§ 15064.5?
No impact. The Proposed Project amending the existing entitlements for the Approved Project to allow for
the incorporation of residential uses within the approved office tower. The Proposed Project would not expand
building square footage of the previously approved tower. As such, no changes proposed by the Proposed
Project would result in new impacts to the historical resources on site. The Proposed Project would incorporate
all identified mitigation measures. No impacts of greater severity than those previously identified in the
Certified FIR would occur, and no changes or new information would require preparation of a subsequent
FIR.
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to
§ 15064.5?
No impact. The Proposed Project would not result in new excavations or other soil disturbances. Therefore,
the Proposed Project would not have the possibility of uncovering or changing the significant of any
archaeological resources. The Proposed Project would incorporate all identified mitigation measures. No
impacts of greater severity than those previously identified in the Certified FIR would occur, and no changes
or new information would require preparation of a subsequent FIR.
c) Disturb any human remains, including those interred outside of formal cemeteries?
No impact. The Proposed Project would not result in new excavation or other soil disturbances beyond what
was approved under the Approved Project. Therefore, the Proposed Project would not have the possibility of
disturbing any human remains. The Proposed Project would incorporate all identified mitigation measures. No
impacts of greater severity than those previously identified in the Certified FIR would occur, and no changes
or new information would require preparation of a subsequent FIR.
5.5.3 Adopted Mitigation Measures Applicable to the Proposed Project
CR-1 Relocation of Historic Resources at 1007-1009 North Broadway (Yale Apartments).
The historical resources proposed for demolition as part of the proposed One Broadway Plaza
project should be made available for relocation as follows:
A. The availability of the Yale Apartments for relocation shall be noticed by posting a sign
at a location which is visible from the public right-of-way and by advertising in at least
one newspaper with a local circulation. These forms of notification shall persist at least
14 days;
Apri12020 Page 39
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
B. The buildings shall be made available free of charge for at least 60 days;
C. Plans for the relocation of the buildings shall be submitted to and evaluated by the City
Council;
D. If the City of Santa Ana Planning Commission approves the relocation plan, the applicant
has 30 days to remove the building(s) from the project site. If the building(s) are not
removed at the end of the 30 days, they may be demolished after they have been
documented, as required in measure CR-2; and
E. The length of this process shall endure for no more than 240 days from the date a
demolition application is submitted.
CR-2 Recordation of Historic Resources for 1007-1009 North Broadway (Yale Apartments).
Although the demolition of an historical resource cannot be mitigated to below a level of
significance, the following actions are important for documenting their loss for posterity. In
the event the Yale Apartments are not relocated, they shall be documented, prior to the
issuance of a demolition permit, in a report consistent with Historic American Buildings
Survey (HABS) standards. That report shall document the significance and physical condition
of the buildings proposed for demolition, both historic and current, photographs, written data
and text. The report and historic survey must be completed by a person technically trained in
the HABS methods. This documentation shall include:
A. A brief written historic and descriptive report in narrative format, including an
architectural data form;
B. A site plan on 8" x 11" paper showing the location of the building. This site plan shall
include a photo -key. The site plan will include appropriate measurements;
C. A sketch floor plan on 8" x 11" paper shall accompany each architectural data form;
D. Large format (4" x 5" or larger negative size) photographs in accordance with the HABS
guidelines. Views shall include several contextual views, all exterior elevations, detailed
views of significant exterior architectural features and interior views of significant
historical architectural features or spaces (if any). All photographs will be black and white,
will include captions and will be listed in a separate index;
E. Field photographs (35mm) based on the HABS guidelines. Views as detailed in large
format photographs. All photographs will be black and white, will include captions and
will be listed in a separate index;
F. The report shall include copies or prints of any available original plans and historic
photographs;
Page 40 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
G. Archivally stable reproductions of any available significant historic construction drawings
and photographs; and
H. Archival copies of the documentation shall be submitted to the City of Santa Ana.
I. In addition to the documentation identified above, the documentation shall include:
• Elevations of all sides of the buildings on minimum 19" x 24" mylar and waterproof
ink, copied and reduced to 8.5" x 11" on archival bond.
• Floor plan with measurements.
• Site plan should also include measurements.
Photographs must include a separate index and captions and photos should be black and
white.
J. All survey information must be performed by a person technically trained in HABS
methods.
CR-3 Rehabilitation for National and California Register Eligible Resources at 1103 North Broadway
(McNeill -Basler House).
The One Broadway Plaza project proposes the rehabilitation of the McNeill -Basler House
conform to the Secretary of the Interior's Standards for Rehabilitation (United States
Department of the Interior, National Park Service 1995). The rehabilitation is for use as a
commercial space. Any rehabilitation must conform with the Secretary of the Interior's
Standards for Rehabilitation (United States Department of the Interior National Park Service
1995).
The following actions ensure compliance with the required Standards of Rehabilitation for
proposed modifications to the structures at 1103 North Broadway:
A. The rehabilitation of the structure at 1103 North Broadway shall conform with the
Secretary of the Interior's Standards for Rehabilitation (United States Department of the
Interior, National Park Service 1995);
B. Detailed plans of the rehabilitation of the McNeill -Basler Home shall be submitted to
the City of Santa Ana for review and approval, prior to any changes to this structure.
The City shall have a qualified architectural historian review and approve the plans and
monitor the rehabilitation program, for consistency with the Standards for
Rehabilitation; and
C. The City of Santa Ana will document the rehabilitation program by establishing a
monitoring program and certification that the building is rehabilitated in accordance with
the Secretary's Standards shall occur prior to issuance of a building permit.
Apri12020 Page 41
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
CR-4 Resources Listed on the City of Santa Ana Register of Historical Property at 1103 North
Broadway (McNeill -Basler House), 1109 North Broadway (Koenig House), 1115-1117 North
Broadway (Macintosh Apartments), and 1211 North Broadway (Kelley House) shall be
rehabilitated in their present locations.
These properties are all listed on the City of Santa Ana Register of Historical Property. Prior
to any rehabilitation or modifications to the exteriors of these structures, other than painting,
the project applicant must conform with the requirements of Ordinance No. NS-2338 (An
Ordinance of the City Council of the City of Santa Ana Amending Chapter 30 of the Santa
Ana Municipal Code Regarding Places of Historical and Architectural Significance).
Mitigation measure CR-3, above, requires compliance with the Secretary of the Interior's
Standards for Rehabilitation for the proposed modifications to and rehabilitation of the
structure at 1103 North Broadway Street. This satisfies the intent of Ordinance No. NS-2338
for this structure. For the remaining structures listed above, the following apply:
A. Plans for modifications or rehabilitation to the exteriors of these structures must be
approved by the Planning Commission prior to any changes to these structures. It is
recommended that the Secretary's Standards for Rehabilitation be used to avoid any
adverse effects to these recognized local historical resources; and
B. The City of Santa Ana will document the rehabilitation program by establishing a
monitoring program of the work, and shall require review and approval of the plans by
a qualified architectural historian, and certification that the plans follow the design
standards adopted by the City.
CR-5 In the event unknown cultural resources are discovered during construction activities, all
construction activities within the vicinity of the finding shall halt and the City's Environmental
Coordinator shall be contacted for appropriate action.
CR-6 Human Remains.
If Human Remains are found during the test excavation, the Native American Graves
Protection Act Guidelines and State law require that the crew halt the work in the immediate
area; leave the remains in place and contact the City of Santa Ana project personnel and the
Orange County Coroner. Until a representative of the Coroner's office reviews the remains in
the field, they must not be removed. If the Coroner determines that the remains are
prehistoric, the Coroner will contact the Native American Heritage Commission and the most
likely descendent from the Native American community will be informed. The final deposition
of remains will be coordinated by representatives of the property owner and the most likely
descendent.
Page 42 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
CR-7 Artifacts
Any artifacts recovered shall be properly collected with photographs, field notes and locations
plotted on a USGS 7.5' topographic quadrangle and a project map. Artifacts will be identified,
catalogued and stabilized for curation. Any recovered artifacts shall be offered, on a first right -
of -refusal basis, to a repository with a retrievable collection system and an educational and
research interest in the materials. The Anthropology Museum at California State University,
Fullerton would be an appropriate repository to receive any artifacts collected on the project
site.
CR-8 Final Report.
A final report, including an itemized inventory and pertinent field data, shall be sent to the
City of Santa Ana, the South Central Coastal Information Center at California State University,
Fullerton and the County of Orange Harbors, Beaches and Parks Department.
CR-9 Relocation for Resources Listed on the City of Santa Ana Register of Historical Property at
1015 North Broadway (Twist -Basler House).
The developer shall relocate the structure located at 1015 North Broadway to a City approved
location. Further, the structure shall be placed on a permanent foundation, have all utility
services connected/operational and be rehabilitated to City standards.
5.6 ENERGY
5.6.1 Summary of Previous Environmental Analysis
Energy was not analyzed as a topic in the prior One Broadway Plaza EIR but was addressed in the Utilities and
Service Systems section of the Certified EIR. The Certified EIR found that the Approved Project would result
in an increase demand for electricity and natural gas. The Certified EIR found that Southern California Edison
(SCE) has sufficient capacity to meet the project -generated demand for electricity. The Approved Project would
not require electricity services beyond those planned or readily available or a substantial expansion of existing
facilities. The Certified EIR found that the construction -related impact on electric lines would not disrupt
service and construction -related impacts would be temporary. The Certified EIR found that Southern
California Gas Company would be served by an existing gas main, and the Approved Project would not require
natural gas facilities beyond those planned or readily available or a substantial expansion of existing facilities.
With coordination with SCGC, construction -related impacts on natural gas would not disrupt existing service.
The Certified EIR determined that the Approved Project's impact on energy would be less than significant and
implements mitigation measures to ensure coordination with SCE and SCGC and minimize damage to energy
facilities during construction and the undergrounding of electrical lines.
5.6.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Apri12020 Page 43
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Result potentially significant environmental
impact due to wasteful, inefficient, or
unnecessary consumption of energy
X
resources, during project construction or
operation?
b) Conflict with or obstruct a state or local plan
for renewable energy or energy efficiency?
X
Comments
a) Result potentially significant environmental impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project construction or operation?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that the Approved Project would be adequately served by the existing electricity
and natural gas infrastructure. The Approved Project would not require electricity or natural gas facilities
beyond those planned or readily available or a substantial expansion of existing facilities. The Proposed Project
would occur within the building envelope of the Approved Project. The Proposed Project would not increase
the square footage of the approved building. Development of the Approved Project and Proposed Project
would be required to comply with California energy efficiency standards. The Proposed Project would place
residential units into a previously approved office tower with commercial uses. The inclusion of residential uses
within the Approved Project would create mixed -use development would further promotes active
transportation, such as walking, and reduces dependency on vehicles. Therefore, the Proposed Project would
not be expected to result in wasteful, inefficient, or unnecessary consumption of energy resources. As a result,
the Proposed Project would not create a new significant impact or a substantial increase in the severity of
previously identified effects related, no change or new information would require preparation of a subsequent
EIR.
b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Energy consumption of new buildings in California is regulated by the State Building Energy Efficiency
Standards, embodied in Title 24 of the California Code of Regulations (CCR) which establishes "energy
budgets" and efficiency standards that regulate heating, cooling, ventilation, water heating, and lighting. The
Proposed Project's electric and natural gas consumption would be in accordance with State and City regulations
and practices. As such, the Proposed Project, as with the Approved Project would be considered consistent
with the goals and policies of the City's Conservation Element (1982) and Energy Element (1982). Impacts
Page 44 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
would be less than significant and no change or new information would require preparation of a subsequent
EIR.
5.6.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to energy are applicable to the Proposed Project.
5.7 GEOLOGY AND SOILS
5.7.1 Summary of Previous Environmental Analysis
The Certified EIR found that the development of the Approved Project would change the topography of the
site; however, this would not result in a significant impact since the change would be covered by buildings
constructed on the site. The soils on the site are classified as a single soil association and are relatively uniform
in composition of Mocho association, including loam, clay loam, and similar soil types. Geotechnical testing
indicated that the soils have low expansivity and mostly overconsolidated. The soils on the Project Site were
determined to be adequate for building and do not pose a constraint for the land uses proposed as part of the
Approved Project. The Certified EIR found that the Approved Project would impact existing topography and
soils at the Project Site and incorporates mitigation measures to ensure that impacts are less than significant.
The Approved Project does not include septic tanks; and no further discussion was required.
The Certified EIR determined that a less than significant impact would occur with regards to groundshaking,
liquefaction, and surface fault rupture. The Certified EIR identifies a mitigation measure to ensure that the
Approved Project would comply with the seismic design provisions of the Final Geology and Soils Report and
the Uniform Building Code to promote safety in the event of an earthquake. The Initial Study analyzed
landslides and determined that the Project Site and surrounding areas are relatively flat and developed.
Construction of the Approved Project would create dust, which would be reduced to a less than significant
level with the incorporation of a mitigation measure in place to control dust.
Paleontological resources were analyzed as part of the Cultural Resources section in the Initial Study prepared
for the Approved Project. The Initial Study determined that the Approved Project's impact to paleontological
resources and unique geologic features would be less than significant as the Project Site is currently developed
and no prior discoveries of paleontological resources have occurred.
5.7.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
April2o2o
Page 45
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
I Revisions
Effects
an EIR
No Impact
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death
involving:
i) Rupture of a known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault Zoning
Map, issued by the State Geologist for
the area or based on other substantial
X
evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
X
iii) Seismic -related ground failure,
including liquefaction?
X
iv) Landslides?
X
b) Result in substantial soil erosion or the loss
of topsoil?
X
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable as
a result of the project, and potentially result
X
in on- or off -site landslide, lateral spreading,
subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code
(2013), creating direct or indirect substantial
X
risks to life or property?
e) Have soils incapable of adequately
supporting the use of septic tanks or
alternative waste water disposal systems
X
where sewers are not available for the
disposal of wastewater?
f) Directly or indirectly destroy a unique
paleontological resource or site or unique
X
geologic feature?
No known fault traces are located in the City of Santa Ana POC 2020). The Project Site is not located within
a zone of potential liquefaction nor landslides POC 1998). Like most of the surrounding area, the Project Site
is flat and developed and is not subject to landslides or substantial erosion.
Page 46 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury,
or death involving:
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning map, issued by the State Geologist for the area or based on other
substantial evidence of a known fault? Refer to Division of Mines and Geology Special
Publication 42.
No Impact. As analyzed in the Certified EIR, no active or potentially active faults cross or project into
the Project Site. Fault rupture is not expected to impact the Project Site. No impact would occur, and no
changes or new information would require preparation of a subsequent EIR.
ii) Strong seismic ground shaking?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an
EIR. As discussed in the Certified FIR, seismic hazard from ground shaking is typical of Southern
California. The Proposed Project, similar to the Approved Project, would be designed in accordance with
the seismic design provisions of the Uniform Building Code to promote maximum safety in the event of
an earthquake. Similar to the Approved Project, the Proposed Project would comply with Mitigation
Measure G-4. Impacts would be less than significant and no changes or new information would require
preparation of a subsequent EIR.
iii) Seismic -related ground failure, including liquefaction?
No Impact. As discussed in the Certified EIR, the Project Site is not located within a liquefaction zone
(DOC 1998). Therefore, the Proposed Project would not result in any new impacts or increase the severity
of impacts with respect to liquefaction compared to the Approved Project and impacts would remain less
than significant.
iv) Landslides?
No Impact. the Project Site is not located within an earthquake -induced landside zone (DOC 1998). The
Project Site is generally flat and located within an urbanized area. No impact is anticipated, and no
mitigation is required. No changes or new information from the Proposed Project would require the
preparation of a subsequent EIR.
b) Result in substantial soil erosion or the loss of topsoil?
No Impact. The Proposed Project does not increase building area nor construct additional floor area. The
Proposed Project would occur within the Approved Project's building envelope. As such, the Proposed Project
would not result in the soil erosion or loss of topsoil. The Proposed Project would comply with identified
mitigation measures. There are no substantial changes in the circumstances, or new information that was not
Apri12020 Page 47
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
known and could not have been known at the time of the adoption of the Approved Project that would require
the preparation of a subsequent EIR.
c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of
the project, and potentially result in on- or off -site landslide, lateral spreading, subsidence,
liquefaction, or collapse.
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As under the Approved Project, the Proposed Project is not located on sensitive or unstable soil. As with the
Approved Project, the Proposed Project would comply with Mitigation Measure G-1 and a less than significant
impact would occur. There are no substantial changes in the circumstances, or new information that was not
known and could not have been known at the time of the adoption of the Approved Project that would require
the preparation of a subsequent EIR.
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (2013),
creating direct or indirect substantial risks to life or property?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that the soils on site have low expansivity potential. The Proposed Project does
not include any additional building square footage and therefore would not require additional grading or
earthwork. Pursuant to Mitigation Measure G-2, prior to acquiring a grading permit for construction, the
developer would be required to prepare a Final Geology and Soils report to specially assess shrink -swell
potential of potentially expansive soils on site and incorporate the recommendations outlined in the report.
The Proposed Project would comply with identified mitigation measures. There are no substantial changes in
the circumstances or new information that was not known and could not have been known at the time of the
adoption of the Approved Project that would require the preparation of a subsequent EIR.
e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water
disposal systems where sewers are not available for the disposal of waste water?
No Impact. As under the Approved Project, implementation of the Proposed Project would not involve the
construction or use of septic tanks or other alternative wastewater disposal system. No impact would occur,
and no changes or new information would require preparation of a subsequent EIR.
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
No Impact. The Proposed Project would not increase building area nor require additional earthwork activities.
The Proposed Project would occur within the Approved Project's building envelope. Therefore, the Proposed
Project would not directly or indirectly destroy paleontological resources or site or unique geologic feature.
There are no substantial changes in the circumstances, or new information that was not known and could not
have been known at the time of the adoption of the Approved Project that would require the preparation of
a subsequent EIR.
Page 48 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.7.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as setlr-egk for deleted text and bold for new,
inserted text.
G-1 The design for the project will comply with all applicable provisions of the Preliminary Geotechnical
Feasibility Investigation performed by Zeiser Kling Consultants and their Addendum
Recommendations, including recommendations for grading, removal and recompaction of soils,
foundations, settlement, pile foundations, design criteria, seismic design, retaining walls, ferrous
corrosion, surface drainage, pavement design, concrete hardscape, soldier pile/logging system and
supplemental investigations.
G-2 Prior to acquiring a grading permit for project construction, the developer will prepare a Final Geology
and Soils Report, to specifically assess the following:
i. The shrink -swell potential of potentially expansive soils on the site; specifically addressing
appropriate recommendations for soil treatments, grading procedures and/or foundation designs,
as appropriate, for the planned land use on the site.
ii. The potential for compressible soils on the site; specifically addressing appropriate
recommendations for soil treatments, grading procedures and/or foundation designs, as
appropriate, for the planned land use on the site.
The recommendations from the Final Geology and Soils Report will be incorporated into the grading
plan for the project.
G-3 Prior to obtaining a grading permit for project construction, the Final Geology and Soils Report will
specifically assess grading control with special emphasis on controlling fugitive dust which could be
generated during site preparation, grading and construction. The reports will specifically provide for
establishing procedures for dust control and monitoring so that unacceptable levels of dust do not
escape from the site. These dust control measures will be coordinated with the dust control measures
described in Section 3.4 (Air Quality) of the Certified EIR. The standards and procedures developed
in the reports will be incorporated into the grading plan to be followed by the project developer.
G-4 All structures to be erected on the One Broadway Plaza site will be designed in accordance with the
seismic design provisions in the Final Geology and Soils Report and of the Uniform Building Code to
promote safety in the event of such an earthquake.
G-5 During final design, the developer will consult with the Orange County Water District and the Regional
Water Quality Control Board, Santa Ana, regarding intrusion of foundation piles into the Orange
County Groundwater Basin. The project applicant will solicit the appropriate permits and approvals
from the OCWD and the RWQCB for the anticipated intrusion of the foundation piles into the
Apri12020 Page 49
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Groundwater Basin and will incorporate measures identified by those agencies in the final design and
construction specifications for the project.
5.8 GREENHOUSE GAS EMISSIONS
5.8.1 Summary of Previous Environmental Analysis
The Certified EIR did not analyze Greenhouse Gas Emissions.
5.8.2 Impacts Associated with the Proposed Project
Regulatory Setting
Federal Laws
The U.S. Environmental Protection Agency (EPA) announced on December 7, 2009, that GHG emissions
threaten the public health and welfare of the American people and that GHG emissions from on -road vehicles
contribute to that threat. The EPNs final findings respond to the 2007 U.S. Supreme Court decision that GHG
emissions fit within the Clean Air Act definition of air pollutants. The findings do not in and of themselves
impose any emission reduction requirements but allow the EPA to finalize the GHG standards proposed in
2009 for new light -duty vehicles as part of the joint rulemaking with the Department of Transportation (EPA
2009).
The EPNs endangerment finding covers emissions of six key GHGS—0O2, CH4, N20, hydrofluorocarbons,
perfluorocarbons, and SF6—that have been the subject of scrutiny and intense analysis for decades by scientists
in the United States and around the world (the first three are applicable to the Proposed Project).
In response to the endangerment finding, the EPA issued the Mandatory Reporting of GHG Rule that requires
substantial emitters of GHG emissions (large stationary sources, etc.) to report GHG emissions data. Facilities
that emit 25,000 metric tons (MT) or more of COz per year are required to submit an annual report.
State Laws
Current State of California guidance and goals for reductions in GHG emissions are generally embodied in
Executive Order S-03-05, Executive Order B-30-15; Assembly Bill (AB) 32; Senate Bill (SB) 32; and SB 375. In
addition to the regulations discussed below, the State of California has a number of laws relating to GHG in
different sectors, including transportation, renewable energy portfolio, energy efficiency, and water efficiency.
Executive Order S-03-05
Executive Order S-03-05, signed June 1, 2005, set the following GHG reduction targets for the state:
■ 2000 levels by 2010
■ 1990 levels by 2020
■ 80 percent below 1990 levels by 2050
Page 50 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Assembly Big 32, the Global Warming Solutions Act (2006)
Current State of California guidance and targets for reductions in GHG emissions are generally embodied in
AB 32. AB 32 was passed by the California state legislature on August 31, 2006, to place the state on a course
toward reducing its contribution of GHG emissions. AB 32 follows the 2020 tier of emissions reduction goals
established in Executive Order S-03-05.
Executive Order B 30-15
Executive Order B-30-15, signed April 29, 2015, sets a goal of reducing GHG emissions in the state to 40 percent
below 1990 levels by year 2030. Executive Order B-30-15 also directs CARB to update the Scoping Plan to
quantify the 2030 GHG reduction goal for the state and requires state agencies to implement measures to meet
the interim 2030 goal as well as the long-term goal for 2050 in Executive Order S-03-05. It also requires the
Natural Resources Agency to conduct triennial updates of the California adaption strategy, Safeguarding
California, in order to ensure climate change is accounted for in state planning and investment decisions.
Senate BIB 32 and Assembly BiR 197
In September 2016, Governor Brown signed Senate Bill 32 and Assembly Bill 197, making the Executive Order
goal for year 2030 into a statewide, mandated legislative target. AB 197 established a joint legislative committee
on climate change policies and requires the CARB to prioritize direction emissions reductions rather than the
market -based cap -and -trade program for large stationary, mobile, and other sources.
2017 Climate Change Scoping Plan
Executive Order B-30-15 and SB 32 required CARB to prepare another update to the Scoping Plan to address
the 2030 target for the state. On December 24, 2017, CARB approved the 2017 Climate Change Scoping Plan
Update, which outlines potential regulations and programs, including strategies consistent with AB 197
requirements, to achieve the 2030 target. The 2017 Scoping Plan establishes a new emissions limit of 260
MMTCOze for the year 2030, which corresponds to a 40 percent decrease in 1990 levels by 2030 (CARB 2017).
California's climate strategy will require contributions from all sectors of the economy, including enhanced
focus on zero- and near -zero emission (ZE/NZE) vehicle technologies; continued investment in renewables
such as solar roofs, wind, and other types of distributed generation; greater use of low carbon fuels; integrated
land conservation and development strategies; coordinated efforts to reduce emissions of short-lived climate
pollutants (methane, black carbon, and fluorinated gases); and an increased focus on integrated land use
planning to support livable, transit -connected communities and conserve agricultural and other lands.
Requirements for GHG reductions at stationary sources complement local air pollution control efforts by the
local air districts to tighten criteria air pollutants and TACs emissions limits on a broad spectrum of industrial
sources. Major elements of the 2017 Scoping Plan framework include:
■ Implementing and/or increasing the standards of the Mobile Source Strategy, which include increasing ZE
buses and trucks;
■ Low Carbon Fuel Standard (LCFS), with an increased stringency (18 percent by 2030).
Apri12020 Page 51
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
■ Implementation of SB 350, which expands the Renewables Portfolio Standard (RPS) to 50 percent RPS
and doubles energy efficiency savings by 2030.
■ California Sustainable Freight Action Plan, which improves freight system efficiency and utilizes near -zero
emissions technology and deployment of ZE trucks.
■ Implementing the proposed Short -Lived Climate Pollutant Strategy, which focuses on reducing methane
and hydrofluorocarbon emissions by 40 percent and anthropogenic black carbon emissions by 50 percent
by year 2030.
■ Post-2020 Cap -and -Trade Program that includes declining caps.
■ Continued implementation of SB 375.
■ Development of a Natural and Working Lands Action Plan to secure California's land base as a net carbon
sink.
In addition to the statewide strategies listed above, the 2017 Climate Change Scoping Plan also identified local
governments as essential partners in achieving the state's long-term GHG reduction goals and recommended
local actions to reduce GHG emissions —for example, statewide targets of no more than 6 MTCOae or less
per capita by 2030 and 2 MTCOae or less per capita by 2050. CARB recommends that local governments
evaluate and adopt robust and quantitative locally appropriate goals that align with the statewide per capita
targets and sustainable development objectives and develop plans to achieve the local goals. The statewide per
capita goals were developed by applying the percent reductions necessary to reach the 2030 and 2050 climate
goals (i.e., 40 percent and 80 percent, respectively) to the state's 1990 emissions limit established under AB 32.
For CEQA projects, CARB states that lead agencies have discretion to develop evidenced -based numeric
thresholds (mass emissions, per capita, or per service population) consistent with the Scoping Plan and the
state's long-term GHG goals. To the degree a project relies on GHG mitigation measures, CARB recommends
that lead agencies prioritize on -site design features that reduce emissions, especially from vehicle miles traveled
(VMT), and direct investments in GHG reductions within the project's region that contribute potential air
quality, health, and economic co -benefits. Where further project design or regional investments are infeasible
or not proven to be effective, CARB recommends mitigating potential GHG impacts through purchasing and
retiring carbon credits.
The Scoping Plan scenario is set against what is called the business -as -usual yardstick —that is, what would the
GHG emissions look like if the state did nothing at all beyond the policies that are already required and in place
to achieve the 2020 limit. It includes the existing renewables requirements, advanced clean cars, the "10 percent"
LCFS, and the SB 375 program for more vibrant communities, among others. However, it does not include a
range of new policies or measures that have been developed or put into statute over the past two years. Known
commitments are expected to result in emissions that are 60 MMTCOze above the target in 2030. If the
estimated GHG reductions from the known commitments are not realized due to delays in implementation or
technology deployment, the post-2020 Cap -and -Trade Program would deliver the additional GHG reductions
in the sectors it covers to ensure the 2030 target is achieved.
Page 52 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Senate BW 375
In 2008, SB 375, the Sustainable Communities and Climate Protection Act, was adopted to connect the GHG
emissions reductions targets established in the 2008 Scoping Plan for the transportation sector to local land use
decisions that affect travel behavior. Its intent is to reduce GHG emissions from light -duty trucks and
automobiles (excludes emissions associated with goods movement) by aligning regional long-range
transportation plans, investments, and housing allocations to local land use planning to reduce VMT and vehicle
trips. Specifically, SB 375 required CARB to establish GHG emissions reduction targets for each of the
18 metropolitan planning organizations (MPOs). The Southern California Association of Governments
(SCAG) is the MPO for the Southern California region, which includes the counties of Los Angeles, Orange,
San Bernardino, Riverside, Ventura, and Imperial.
Pursuant to the recommendations of the Regional Transportation Advisory Committee, CARB adopted per
capita reduction targets for each of the MPOs rather than a total magnitude reduction target. SCAG's targets
are an 8 percent per capita reduction from 2005 GHG emission levels by 2020 and a 13 percent per capita
reduction from 2005 GHG emission levels by 2035 (CARB 2010). The 2020 targets are smaller than the 2035
targets because a significant portion of the built environment in 2020 has been defined by decisions that have
already been made. In general, the 2020 scenarios reflect that more time is needed for large land use and
transportation infrastructure changes. Most of the reductions in the interim are anticipated to come from
improving the efficiency of the region's transportation network. The targets would result in 3 MMTCO2e of
reductions by 2020 and 15 MMTCOae of reductions by 2035. Based on these reductions, the passenger vehicle
target in CARB's Scoping Plan (for AB 32) would be met (CARB 2010).
2017 Update to the SB 375 Targets
CARB is required to update the targets for the MPOs every eight years. In June 2017, CARB released updated
targets and technical methodology and recently released another update in February 2018. The updated targets
consider the need to further reduce VMT, as identified in the 2017 Scoping Plan Update, while balancing the
need for additional and more flexible revenue sources to incentivize positive planning and action toward
sustainable communities. Like the 2010 targets, the updated SB 375 targets are in units of percent per capita
reduction in GHG emissions from automobiles and light trucks relative to 2005. This excludes reductions
anticipated from implementation of state technology and fuels strategies and any potential future state strategies
such as statewide road user pricing. The proposed targets call for greater per capita GHG emission reductions
from SB 375 than are currently in place, which for 2035, translate into proposed targets that either match or
exceed the emission reduction levels in the MPOs' currently adopted SCSs. As proposed, CARB staffs
proposed targets would result in an additional reduction of over 8 MMTCOze in 2035 compared to the current
targets. For the next round of SCS updates, CARB's updated targets for the SCAG region are an 8 percent per
capita GHG reduction in 2020 from 2005 levels (unchanged from the 2010 target) and a 19 percent per capita
GHG reduction in 2035 from 2005 levels (compared to the 2010 target of 13 percent) (CARB 2018). CARB
adopted the updated targets and methodology on March 22, 2018. All SCSs adopted after October 1, 2018 are
subject to these new targets.
Apri12020 Page 53
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
SCAG's RTP/SCS
SB 375 requires each MPO to prepare an SCS in their regional transportation plan. For the SCAG region, the
2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) was adopted on April
7, 2016, and is an update to the 2012 RTP/SCS (SCAG 2016). SCAG recently released the 2020-2045 RTP/SCS
(Draft Connect SoCal Plan) on November 7, 2019. In general, the SCS outlines a development pattern for the
region, which, when integrated with the transportation network and other transportation measures and policies,
would reduce vehicle miles traveled (VMT) from automobiles and light duty trucks and thereby reduce GHG
emissions from these sources.
The 2016-2040 RTP/SCS projects that the SCAG region will meet or exceed the passenger per capita targets
set in 2010 by CARB. It is projected that VMT per capita in the region for year 2040 would be reduced by 7.4
percent with implementation of the 2016-2040 RTP/SCS compared to a no -plan year 2040 scenario. Under
the 2016-2040 RTP/SCS, SCAG anticipates lowering GHG emissions 8 percent below 2005 levels by 2020,18
percent by 2035, and 21 percent by 2040. The 18 percent reduction by 2035 over 2005 levels represents a 2
percent increase in reduction compared to the 2012 RTP/SCS projection. Overall, the SCS is meant to provide
growth strategies that will achieve the aforementioned regional GHG emissions reduction targets. Land use
strategies to achieve the region's targets include planning for new growth around high quality transit areas and
livable corridors and creating neighborhood mobility areas to integrate land use and transportation and plan
for more active lifestyles (SCAG 2016). However, the SCS does not require that local general plans, specific
plans, or zoning be consistent with the SCS; instead, it provides incentives to governments and developers for
consistency.
Methodology
Urban Crossroads prepared a memorandum reviewing Air Quality and Greenhouse Gas Emissions for the
Proposed Project (AQ/GHG Memo) dated April 16, 2020. The AQ/GHG Memo is contained in Appendix
A. The Certified EIR did not quantify GHG emissions. As such, GHG emissions for the Approved Project
and Proposed Project were calculated employing the California Emissions Estimator Model (CalEEMod)
version 2016.3.2.
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
I Revisions
Effects
an EIR
No Impact
a) Generate greenhouse gas emissions, either
directly or indirectly, that may have a
X
significant impact on the environment?
Page 54 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emissions of greenhouse
X
gases?
Comments:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant
impact on the environment?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Both the Approved Project and the Proposed Project would contribute to global climate change through direct
emissions of GHG from onsite area sources and vehicle trips generated by the One Broadway Plaza
development, and indirectly through offsite energy production required for onsite activities, water
use/wastewater generation, and waste disposal. The AQ/GHG Memo prepared by Urban Crossroads
compares the greenhouse gas emissions from the Approved Project and the Proposed Project.
The estimated GHG emissions for the currently approved land uses are summarized on Table 6. As shown on
Table 6, Approved One Broadway Plaza land uses would generate a total of approximately 10,009.23 MTCO2e
per year. As shown on Table 7, Proposed Project would generate a total of approximately 5,795.27 MTCO2e
per year.
Table 6 Currently Approved One Broadwav Plaza Land Uses GHG Emissions
Emission Source
Emissions metric tons per ear
Cos
CHa
N20
Total CO2e
Area
0.01
4.00E-05
0.00
0.01
Energy
3,072.67
0.12
0.03
3,084.87
Mobile Sources
5,901.29
0.26
0.00
5,907.81
Waste
109.03
6.44
0.00
270.11
Water Usage
641.58
3.23
0.08
746.43
Total CO2e (All Sources)
10,009.23
Apri12020
Page 55
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Table 7 Proposed Project GHG
Emissions
Emission Source
Emissions metric tons per ear
CO2
CHa
N20
Total COze
Area
6.99
6.83E-03
0.00
7.17
Energy
2,278.04
0.08
0.03
2,287.63
Mobile Sources
2,759.07
0.13
0.00
2,762.31
Waste
1 87.72
5.18
0.00
217.32
Water Usage
1 447.46
2.26
1 0.06
520.84
Total CO2e (All Sources)
5,795.27
Based on greenhouse gas emissions generated by the Proposed Project compared to the Approved Project, the
Proposed Project would result in a net decrease 4,213.96 MTCO2e per year in greenhouse gas emissions
(approximately 42 percent less). Therefore, the Proposed Project would not result in new or substantively
different or substantively increased GHG emissions impacts than the emissions associated with the Approved
Project. The project -related greenhouse gas emissions are considered less than significant. There are no
substantial changes in the circumstances, or new information that would require the preparation of a
subsequent EIR.
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the
emissions of greenhouse gases?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
There are numerous State plans, policies and regulations adopted for the purpose of reducing GHG emissions.
The principal overall State plan and policy is Assembly Bill (AB) 32. The quantitative goal of AB 32 is to reduce
GHG emissions to 1990 levels by 2020. Executive Order B-30-15 and Senate Bill (SB) 32 further established a
new emissions limit of 260 MMTCO2e for the year 2030, which corresponds to a 40 percent decrease in 1990
levels by 2030. Statewide plans and regulations such as GHG emissions standards for vehicles (AB 1493), the
Low Carbon Fuel Standard, and regulations requiring an increasing fraction of electricity to be generated from
renewable sources are being implemented at the statewide level; as such, compliance at the project level is not
addressed. Therefore, the Proposed Project does not conflict with those plans and regulations.
5.8.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to greenhouse gas emissions were identified in the Certified EIR.
5.9 HAZARDS AND HAZARDOUS MATERIALS
5.9.1 Summary of Previous Environmental Analysis
The Certified EIR determined that during the construction of the Approved Project the accident prevention
and containment are the responsibility of the construction contractions, and provisions to manage hazardous
materials and waste are a standard component of construction plans. Further, the Approved Project would be
Page 56 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
required to comply with NPDES Permit requirements and implement best management practices to ensure the
proper handling of hazardous materials and to contain and clean up accidental releases. Construction of the
Approved Project would temporarily increase the transport of hazardous substances, such as vehicle fuels and
paints. Further, the construction of the Approved Project would demolish buildings that likely contain asbestos -
containing materials and lead -based paint.
The Phase I Environmental Site Assessment (ESA) prepared for the Approved Project determined that there
are no unusual hazardous conditions at the Project Site.
The Certified EIR determined that the operation of the Approved Project would include minimal hazardous
material use and waste. The presence of chemicals onsite, if not properly stored or handled could expose site
occupants to hazardous materials. The Certified EIR determined that the potential for significant adverse
impacts to offsite uses is unlikely given the nature and limited about of materials. Compliance with regulatory
measures, including the preparation of a Hazardous Materials Management Plan, would reduce impacts of
hazardous materials during the operation of the project.
The Certified EIR determined that the demolition of buildings on -site may contain asbestos materials and lead -
based paint. Hazardous materials could be used in the construction and operation of the Approved Project.
Mitigation measures would reduce these impacts to a less than significant level.
The Initial Study for the Certified EIR determined that the Project Site is not within a two-mile radius of a
public airport and no private airstrips are located in the vicinity of the Project Site. The Certified EIR addressed
the Approved Project's impact to air transportation in the Transportation and Traffic section. The Project Site
is located outside of the Accident Potential Zone for the John Wayne Airport. The Certified EIR determined
that the Approved Project would be required to comply with FAA Part 77 regulations.
The Initial Study for the Approved Project determined that the Project Site is located in an urbanized area and
would not be subject to wildland fires.
Apri12020 Page 57
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.9.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
X
materials?
b) Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
X
involving the release of hazardous materials
into the environment?
c) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one -quarter
X
mile of an existing or proposed school?
d) Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
X
significant hazard to the public or the
environment?
e) For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project result
X
in a safety hazard or excessive noise for
people residing or working in the project
area?
f) Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
X
plan?
g) Expose people or structures, either directly
or indirectly, to a significant risk of loss,
X
injury or death involving wildland fires?
Page 58 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Create a significant hazard to the public or the environment through the routine transport, use or
disposal of hazardous materials?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As with the Approved Project, the construction and operation of the Proposed Project would involve the use,
transport, and disposal of typical hazardous materials used in the construction and operation of residential
uses. For example, construction of the Proposed Project would use vehicle fuel for the construction equipment,
paints, and solvents and the operation of the Proposed Project would involve typical household cleaning
supplies. As with the Approved Project, the Proposed Project would implement Mitigation Measure HZ-3 to
ensure compliance with applicable federal, state, and local regulations for the use of hazardous materials and
generation of hazardous wastes. The Proposed Project would result in a less than significant impact. The
Proposed Project would follow existing regulations and would not result in any new or more severe impacts
that would require the preparation of a subsequent EIR.
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset
and accident conditions involving the release of hazardous materials into the environment?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that the demolition of existing structures on site could result in the accidental
release of asbestos containing materials (ACMs) and lead -based paint. The Certified EIR implements Mitigation
Measures HZ-1 and HZ-2 to address ACMs and lead -based paint. The Proposed Project would not demolish
any buildings, since the Proposed Project would occur within the approved office tower.
As discussed above, the Proposed Project would involve the handling of hazardous materials that are typical
of construction and operation of residential uses. As with the Approved Project, the handling of hazardous
materials is regulated by state and federal laws. The Proposed Project would not involve the use of materials in
a manner that poses any substantial hazards to people, or to animal or plant populations. In order to address
the use and handling of hazardous materials, the Proposed Project would implement identified mitigation
measures. Potential impacts relating to the release of hazardous materials would be less than significant. The
Proposed Project would not result in any new or more severe impacts that would require the preparation of a
subsequent EIR.
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or
waste within one -quarter mile of an existing or proposed school?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As stated in the Certified EIR, the potential for significant adverse impact to offsite uses, including the adjacent
High School of the Arts and Willard Junior High School (approximately 0.25 miles west), is unlikely given the
nature and amount of hazardous materials that would be used on site. As with the Approved Project, the
Proposed Project would not create a significant adverse impact to schools, including the Orange County
Education Arts Academy, El Sol Academy, High School of the Arts and Willard Junior High School. The
handling and transport of hazardous materials would be conducted in compliance with all applicable federal,
Apri12020 Page 59
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
State, and local laws and regulations regarding hazardous waste. The Proposed Project would not create a new
significant impact or a substantial increase in the severity of previously identified effect and would not require
the preparation of a subsequent EIR.
d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to
Government code Section 65962.5 and, as a result, would it create a significant hazard to the public
or the environment?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Phase I ESA prepared for the Approved Project determined that there are no unusual hazardous conditions
at the Project Site. A review of the State Water Resources Control Board's Geotracker and the Department of
Toxic Substances Control's EnviroStor databases indicate that there are no cleanup sites on the Project Site
(SWRCB 2020, DTSC 2020). Further, a review of US Environmental Protection Agency's EJSCREEN
mapping tool shows no hazardous waste sites on the Project Site (USEPA 2019). The Proposed Project would
not create a new significant impact or a substantial increase in the severity of previously identified effect and
would not require the preparation of a subsequent EIR.
e) For a project located within an airport land use plan or, where such a plan has not been adopted,
within two miles of a public airport or public use airport, would the project result in a safety hazard
or excessive noise for people residing or working in the project area?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As discussed in the Certified EIR, the Approved Project would be required to comply with FAA regulations
and file Form 7460-1 for buildings exceeding 200 feet in height. The Proposed Project would not increase the
height of the Approved Project nor add new building area. Therefore, this impact would remain less than
significant and the Proposed Project would not create a new significant impact or a substantial increase in the
severity of previously identified effect and would not require the preparation of a subsequent EIR.
f) Impair implementation of or physically interfere with an adopted emergency response plan or
emergency evacuation plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Initial Study for the Approved Project states that there are no designated emergency evacuation routes in
the City. The Public Services Section of the Certified EIR determined that the Approved Project would
incorporate fire access roadway requirements of the California Fire Code. For the Approved Project, SAID
required an additional traffic signal at the intersections of Broadway Street and 10th Street, Broadway Street and
Washington Avenue, and Sycamore Street and Washington Avenue as well as any intersection updates to
accommodate traffic for the Approved Project. Since these intersections are already signalized an emergency
vehicle preemption detector can be installed as part of the Approved Project (refer to Mitigation Measure PS-
8 below). Further, as discussed in Section 5.15, Public Services, the Proposed Project would implement all
identified mitigation measures which would ensure that the Proposed Project would result in a less than
significant impact to police protection and fire and emergency services. These mitigation measures would
further ensure that the Proposed Project would not impair the implementation of an emergency response plan.
This impact would be less than significant, and the Proposed Project would not create a new significant impact
Page 60 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
or a substantial increase in the severity of previously identified effect and would not require the preparation of
a subsequent EIR.
g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death
involving wildland fires?
No Impact. The Project Site is located in a dense urban environment and is surrounded by existing
development. There are no wildland areas, nor wildland interface areas located in the vicinity. As with the
Approved Project, implementation of the Proposed Project would not be affected or affect wildland fires. No
impact would occur and no changes or new information would require preparation of a subsequent EIR.
5.9.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as srrikethfeugh for deleted text and bold for new,
inserted text.
HZ-1 The City shall require the site demolition and remodeling contractors to conduct a building by
building inspection for the presence of asbestos -containing materials prior to the issuance of
demolition permits for the site. The demolition contractor may submit copies of asbestos
inspection reports for the site already prepared to satisfy SCAQMD Rule 1403 to fulfill this
requirement.
HZ-2 The City shall require the site demolition and remodeling contractors to conduct a building by
building inspection for the presence of lead -based paint prior to the issuance of demolition
permits for the site. Building inspection reports already prepared by the contractor to satisfy
Cal -OSHA worker safety requirements may be submitted to fulfill this mitigation measure.
HZ-3 Any use of hazardous materials or generation of hazardous wastes on the proposed project
site must be conducted in accordance with applicable federal, state and local regulations.
5.10 HYDROLOGY AND WATER QUALITY
5.10.1 Summary of Previous Environmental Analysis
The Certified EIR determined that construction and operation of the Approved Project may generate surface
runoff with pollutants that could impact area receiving waters. The Approved Project would be required to
prepare a Storm Water Pollution Prevention Plan, a Water Quality Management Plan, and a NPDES permit.
The Certified EIR found that development of the Approved Project would result in a moderate increase in
impervious surfaces on site. The project developer would regrade the Project Site so that flows drain into the
existing storm drain system that exists adjacent to the Project Site. Appropriate drainage facilities would be
constructed as part of the Approved Project. Identified mitigation measures would result impacts to less than
significant level.
Apri12020 Page 61
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
The Certified EIR (Geology and Soils Section) found that the depth of groundwater in the vicinity of the
Project Site is 80 to 85 feet below ground surface. The Approved Project would require foundation piles that
could extend to depths of 60 to 80 feet below ground surface, which could extend into the groundwater. The
Certified EIR identified a mitigation measure would reduce impacts to groundwater to a less than significant
level.
The Initial Study prepared for the Certified EIR found that the Project Site is not near a large body of water
that would generate tsunamis or seiches. The Certified EIR determined that the Project Site is outside of an
area that could flood. The Approved Project would not result in significant adverse impacts related to
placement of structures in a flood zone.
5.10.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Violate any water quality standards or waste
discharge requirements or otherwise
substantially degrade surface or ground
X
water quality?
b) Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the project
X
may impede sustainable groundwater
management of the basin?
c) Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river or through the addition of impervious
surfaces, in a manner which would:
(i) result in a substantial erosion or siltation
on- or off -site;
(ii) substantially increase the rate or amount
of surface runoff in a manner which
X
would result in flooding on- or offsite;
(iii) create or contribute runoff water which
would exceed the capacity of existing
or planned stormwater drainage
systems or provide substantial
additional sources of polluted runoff; or
(iv) impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
X
inundation?
Page 62 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
e) Conflict with or obstruct implementation of a
water quality control plan or sustainable
X
groundwater management plan?
Comments:
a) Violate any water quality standards or waste discharge requirements or otherwise substantially
degrade surface or ground water quality?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that construction and operation of the Approved Project may generate surface
runoff with pollutants that could impact area receiving waters. The Approved Project would be required to
prepare a SWPPP, WQMP, and NPDES permit. Construction and operation of the Proposed Project would
comply with the SWPPP, WQMP, and NPDES permit for the Approved Project. The Proposed Project would
not increase development floor area nor impervious surfaces. The Proposed Project would comply with
identified mitigation measures. As such, the Proposed Project would not create a new significant impact or a
substantial increase in the severity of previously identified effects and would not require the preparation of a
subsequent EIR.
The Certified EIR (Geology and Soils section) identifies Mitigation Measure G-5 to address the intrusion of
the Approved Project's foundation piles into the groundwater. Mitigation Measure G-5 would ensure that the
Approved Project's foundation piles would result in a less than significant impact regarding the introduction of
contaminants into the groundwater. The Proposed Project would comply with all identified mitigation
measures.
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge
such that the project may impede sustainable groundwater management of the basin?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would not expand the approved building square footage nor increase impervious
surfaces. As such implementation of the Proposed Project would not decrease groundwater supplies or
interfere with groundwater recharge. The Proposed Project would not create a new significant impact nor a
substantial increase in the severity of previously identified effects that would require the preparation of a
subsequent EIR.
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration
of the course of a stream or river or through the addition of impervious surfaces, in a manner which
would: (i) result in a substantial erosion or siltation on- or off -site; (ii) substantially increase the
Apri12020 Page 63
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
rate or amount of surface runoff in a manner which would result in flooding on- or offsite; (iii)
create or contribute runoff water which would exceed the capacity of existing or planned
stormwater drainage systems or provide substantial additional sources of polluted runoff; or (iv)
impede or redirect flood flows?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would not develop new floor area nor increase impervious surfaces. As such
implementation of the Proposed Project would not alter existing drainage pattern of the site nor the project
area. The Proposed Project would not alter the course of a stream or river. The Proposed Project would not
create a new significant impact nor a substantial increase in the severity of previously identified effects that
would require the preparation of a subsequent EIR.
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Initial Study for the Certified EIR determined that the Project Site is not near any large bodies of water
that could generate tsunamis or seiches. The Certified EIR determined that the Project Site is outside the area
that could be inundated by flood water. While the Project Site is not within a flood area, the Project Site may
be exposed to street flooding during period of heavy rain due to deficient storm drains. The Certified EIR
provides mitigation measures to address storm drain capacity. Since the Proposed Project would not increase
the development floor area nor impervious surfaces on the Project Site, the Proposed Project would result in a
less than significant impact to flood hazard and inundation. The Proposed Project would comply with the
SWPPP, WQMP, and NPDES permit and implement all identified mitigation measures. A less than significant
impact would occur.
e) Conflict with or obstruct implementation of a water quality control plan or sustainable
groundwater management plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would not construct new floor area nor increase impervious surfaces. Construction and
operation of the Proposed Project would comply with the SWPPP, WQMP, and NPDES permit. Further, the
Proposed Project would comply with Mitigation Measures W-1 through W-8. Therefore, the Proposed Project
would not conflict with or obstruct the implementation of a water quality control plan and would not impact
groundwater. A less than significant impact would occur.
5.10.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as for deleted text and bold for new,
inserted text.
W-1 Prior to issuance of a grading permit for the project:
Page 64 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
■ The developer will prepare and submit a Notice of Intent (NOI) to the State Water
Resources Control Board (SWRCB).
■ The developer will submit the NOI and the project Water Discharge Identification
Number (WDIN) to the City of Santa Ana City Engineer.
■ The developer will prepare a Stormwater Pollution Prevention Plan (SWPPP) and will
submit the SWPPP to the City Engineer for review and comment. The developer will
maintain the SWPPP on the construction site throughout the construction period.
W-2 During all site preparation, grading and construction, the project contractors will comply with
all applicable requirements of the NPDES permit, the Drainage Area Management Plan
(DAMP) and the City's Local Implementation Plan (LIP). The project contractors will
incorporate Best Management Practices (BMPs) from the DAMP and LIP and will implement
those measures as appropriate during site preparation, grading and construction.
W-3 During all site preparation, grading and construction, the construction contractors will be
responsible for implementing the SWPPP provisions. The SWRCB is responsible for
monitoring and enforcing the provision of the SWPPP. In addition, the City Engineer will
monitor and enforce these provisions during all site preparation, grading and construction, as
appropriate, to ensure the SWPPP is properly implemented.
W-4 Prior to the issuance of grading permits, the Project Developer shall provide for the review
and approval of the Director of Public Works a Water Quality Management Plan (WQMP)
prepared for the project consistent with the Orange County Drainage Area Management Plan.
The WQMP shall contain provisions and BMPs for both construction and operating
conditions.
W-5 Prior to the issuance of grading permits, the Project Developer shall submit a final drainage
plan for the proposed One Broadway Plaza project for review and approval by the City
Engineer.
W-6 Prior to the issuance of the first building permit, the Project Developer shall pay the City's
drainage area impact fee.
W-7 During operation of the proposed project, the Project Owner/Operator shall ensure that all
pest control, herbicide, insecticide and other similar substances used as part of maintenance
of project features are handled, stored, applied and disposed consistent with all applicable
federal, state and local regulations. The City Engineer shall monitor and enforce this provision.
W-8 Prior to the issuance of grading permits, the City Engineer shall verify that structural BMPs
have been permanently incorporated into project plans by the applicant. Such BMPs shall
ensure that pollutants from project -related storm water are mitigated consistent with
applicable state and local standards.
Apri12020 Page 65
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.11 LAND USE AND PLANNING
5.11.1 Summary of Previous Environmental Analysis
The Certified EIR concluded that the Approved Project would be compatible with existing land uses in the
project area. The Certified EIR discussed the Approved Project's consistency with the City of Santa Ana
General Plan (1982), Midtown Specific Plan (1996), Santa Ana Redevelopment Plan, and the Southern
California Association of Governments' (SCAG) Regional Comprehensive Plan and Regional Transportation
Plan. The Certified EIR found that the Approved Project is consistent with the Santa Ana Redevelopment
Plan and SCAG's Regional Comprehensive Plan and Regional Transportation Plan. With approval of
requested entitlements, the Approved Project would not be in conflict with the General Plan and the Midtown
Specific Plan. The Approved Project is located within an already developed area and would not physically
divide an established community and would not conflict with any applicable habitat conservation plans or
natural community conservation plan (both topics were scoped out in the Initial Study for the Approved
Project). The Certified EIR determined that the Approved Project would result in a less than significant
impact and no mitigation measures are required.
5.11.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Physically divide an established
X
community?
b) Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the purpose
X
of avoiding or mitigating an environmental
effect?
Comments:
a) Physically divide an established community?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would amend the existing entitlements to allow for up to 415 residential units within an
approved 37-story office tower. The Proposed Project's residential units would occur within the envelope of
the Approved Project; the Proposed Project would not result in an expansion of the building footprint or in
new development beyond what was analyzed in the Certified EIR. The Proposed Project would not create a
Page 66 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
new significant impact or a substantial increase in the severity of previously identified effects and impacts would
remain less than significant.
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or
regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The majority of the Project Site is currently zoned SD-75, One Broadway Plaza Specific Development District
with a corresponding land use designation of One Broadway Plaza District Center. One parcel on the Project
Site (APN: 398-561-03; located at 1205 N. Broadway) is currently zoned Midtown Specific Plan (SP3) with a
General Plan Land Use designation of Professional & Administration Office. The SD-75 zone and One
Broadway Plaza District Center land use designation do not allow for residential uses. With approval of the
entitlement requests to amend the SD-75 zoning and OBPDC land use designation, the proposed project would
not conflict with the SD-75 zoning and OBPDC land use designation on site. No change would occur to the
parcel with APN 398-561-03, which is zoned Midtown Specific Plan (SP3) with a General Plan Land Use
designation of Professional & Administration Office.
With the zone text amendment and general plan amendment, the Proposed Project would not create a new
significant impact or a substantial increase in the severity of previously identified effects. In addition, as
described in this Addendum, no significant impacts are associated with the Proposed Project. Therefore,
impacts related to land use would remain less than significant and no changes or new information would require
preparation of a subsequent EIR.
5.11.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to land use and planning were identified in the Certified EIR.
5.12 MINERAL RESOURCES
5.12.1 Summary of Previous Environmental Analysis
As referenced in the Certified EIR, the Initial Study determined that no mineral resources exist on the Project
Site, and the Approved Project would not result in the loss of availability of known mineral resources that
would be of state, regional or local value. No additional analysis was required in the EIR.
5.12.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Apri12020 Page 67
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Result in the loss of availability of a known
mineral resource that would be a value to
X
the region and the residents of the state?
b) Result in the loss of availability of a locally
important mineral resource recovery site
X
delineated on a local general plan, specific
plan or other land use plan?
For the purpose of CEQA analysis, mineral resources refer to aggregate resources that consist of sand, gravel,
and crushed rock. Aggregate resources provide bulk and strength in construction materials such as portland
cement and asphaltic concrete. Other nonfuel mineral resources include metals such as gold, silver, iron, and
copper and industrial metals such as boron compounds, rare-earth elements, clays, limestone, gypsum, salt, and
dimension stone.
The California Geological Survey (CGS) classifies the regional significance of mineral resources in accordance
with the California Surface Mining and Reclamation Act (SMARA) of 1975. The State Geologist is responsible
for classifying areas within California that are subject to urban expansion or other irreversible land uses.
SMARA also allowed the State Mining and Geology Board (SMGB), after receiving classification information
from the State Geologist, to designate lands containing mineral deposits of regional or statewide significance.
Classification into MRZ is completed by the State Geologist in accordance with the SMGB's priority list and
according to the presence or absence of significant mineral resources.
Of the four MRZ categories, lands classified as MRZ-2 are of the greatest importance. Such areas are underlain
by demonstrated mineral resources or are located where geologic data indicate that significant measured or
indicated resources are present. MRZ-2 areas are designated by SMGB as being "regionally significant." Such
designations require that a lead agency's land use decisions involving designated areas be made in accordance
with its mineral resource management policies (if any exist) and that it consider the importance of the mineral
resource to the region or the state as a whole, not just to the lead agency's jurisdiction. The MRZ-1 zone depicts
areas where adequate geologic information indicates that no significant mineral deposits are present, or where
it is judged that little likelihood exists for their presence. MRZ-3 indicates areas of undetermined mineral
resource significance.
Page 68 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Result in the loss of availability of a known mineral resource that would be a value to the region
and the residents of the state?
No Impact. The Proposed Project's residential units would occurwithin the envelope of the Approved Project;
the Proposed Project would not result in an expansion of the building footprint or in new development beyond
what was analyzed in the Certified EIR. Therefore, the Proposed Project would not result in any new impacts
to mineral resources. No impact would occur and no changes or new information would require preparation
of a subsequent EIR.
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on
a local general plan, specific plan or other land use plan?
No Impact. The Land Use Element states that there are no significant mineral aggregate resource areas
designations within the City (City of Santa Ana 1998). The Proposed Project's residential units would occur
within the envelope of the Approved Project; the Proposed Project would not result in an expansion of the
building footprint or in new development beyond what was analyzed in the Certified EIR. Therefore, the
Proposed Project would not result in any new impacts to mineral resources. No impact would occur and no
changes or new information would require preparation of a subsequent EIR.
5.12.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to mineral resources were identified in the Certified EIR.
5.13 NOISE
5.13.1 Summary of Previous Environmental Analysis
The Certified EIR determined that the construction of the Approved Project could generate noise levels that
exceed noise standards established by the City of Santa Ana noise thresholds. However, the implementation of
identified mitigation measures would reduce temporary construction noise impacts to a less than significant
level. Operation of the Approved Project, including use of the parking structure, operational noise due to
project traffic, and potential helipad noise, would result in a less than significant impact. The Certified EIR
determined that the Approved Project's contribution to future traffic noise is insignificant. The Certified EIR
found the Approved Project may experience future traffic noise levels in excess of the City's noise threshold
and identifies Mitigation Measure N-3 to ensure that the on -site commercial buildings would keep outside noise
from entering the interior of these buildings.
The Initial Study to the Certified EIR determined that because the Proposed Project is not located within an
airport land use plan nor within the vicinity of a public airport or private airstrip, no impact related to the
exposure of people residing or working in the project area to excessive airport related noise levels.
Apri12020 Page 69
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
The Certified EIR analyzed vibration as part of Geology and Soils. The Certified EIR determined that land
uses adjacent to the Project Site would experience temporary annoyance due to vibration from construction.
The Certified EIR determined that the Approved Project's impact relating to construction would be less than
significant.
5.13.2 Impacts Associated with the Proposed Project
Would the Proposed Project result in:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Generation of a substantial temporary or
permanent increase in ambient noise levels
in the vicinity of the project in excess of
X
standards established in the local general
plan or noise ordinance, or applicable
standards of other agencies?
b) Generation of excessive groundborne
X
vibration or groundborne noise levels?
c) For a project located within the vicinity of a
private airstrip or an airport land use plan or,
where such a plan has not been adopted,
within two miles of a public airport or public
X
use airport, would the project expose people
residing or working in the project area to
excessive noise levels?
Comments:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity
of the project in excess of standards established in the local general plan or noise ordinance, or
applicable standards of other agencies?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would not substantially increase construction noise, since the Proposed Project would
occur within the building envelope of the Approved Project. The Proposed Project would comply with
identified mitigation measures. With regards to construction noise, the Proposed Project would not create a
new significant impact or a substantial increase in the severity of previously identified effects that would require
the preparation of a subsequent EIR.
The Proposed Project would convert up to 19 floors of office uses (from the Approved Project) to up to 415
residential units. Based on the Trip Generation Memo (contained in Appendix B and discussed in the
Page 70 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Transportation section), the implementation of the Proposed Project would reduce vehicle trips to and from
the Project Site compared to the Approved Project. Since the Proposed Project is converting previously
approved office uses to residential uses, would not expand building floor area, and would result in a reduction
of vehicle trips, the operation of the Proposed Project would not create a new significant impact or a substantial
increase in the severity of previously identified effects that would require the preparation of a subsequent EIR.
In fact, with the reduction in trips, noise impacts resulting from the Proposed Project would actually be reduced
as compared to the Approved Project.
The Certified EIR determined that the Approved Project may experience future traffic noise levels in excess
of the City's noise threshold and identifies Mitigation Measure N-3 to lower impacts to a less than significant
level. The Proposed Project's would not place residences on the groundfloor, and therefore, the on -site
residential units would not be immediately adjacent to this noise source. The Proposed Project would not create
a new significant impact or a substantial increase in the severity of previously identified effects that would
require the preparation of a subsequent EIR.
b) Generation of excessive groundborne vibration or groundborne noise levels?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Certified EIR determined that land uses adjacent to the Project Site would experience temporary
annoyance due to vibration from construction. The construction of the Proposed Project would occur within
the building envelope of the Approved Project. As such, the construction of the Proposed Project would not
increase vibration due to construction. Consistent with the analysis of the Approved Project, the Proposed
Project would result in a less than significant impact. The Proposed Project would not create a new significant
impact or a substantial increase in the severity of previously identified effects that would require the preparation
of a subsequent EIR.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where
such a plan has not been adopted, within two miles of a public airport or public use airport, would
the project expose people residing or working in the project area to excessive noise levels?
No Impact. Similar to the conditions evaluated in the Certified EIR, there are no public airports, public use
airports or private airstrips in the Proposed Project Site vicinity. The Proposed Project would not expose people
residing or working in the area to excessive levels of aircraft- or airport -related noise. The Proposed Project
would not create a new significant impact or a substantial increase in the severity of previously identified effects.
Overall, the Proposed Project would be consistent with the Approved Project as analyzed in the Certified EIR.
The Proposed Project would not create a new significant impact or a substantial increase in the severity of
previously identified effects.
5.13.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
Apri12020 Page 71
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
mitigation measures from the Certified EIR are shown as striketlregk for deleted text and bold for new,
inserted text.
N-1 Project construction shall be limited to the hours of 7 a.m. to 8 p.m. on Monday through
Friday and from 8 a.m. to 8 p.m. on Saturday. Construction shall not be allowed on Sunday or
federal holidays.
N-2 Temporary noise barriers shall be installed between the project construction area and adjacent
residents. These noise barriers may include the use of leaded blankets, an acoustic blanket or
several layers of plywood. "Bravo" acoustic blankets may also be used. Barriers should be 16
to 20 feet high.
N-3 The commercial buildings in the project will require mechanical ventilation to keep outside
noise from entering the interior of these buildings. The central ventilation systems for the
buildings shall allow for sufficient ventilation so that office windows can be closed. Air
conditioning units may be adequate for mechanical ventilation as long as they meet the
ventilation requirements of the UBC. This shall be coordinated with the project's mechanical
engineer.
N-4 Prior to any site preparation, grading or construction, the project contractor will provide the
Principals at the Orange County High School of the Arts, Orange County Educational Arts
Academy and the El Sol Science and Arts Academy with the project construction schedule
indicating the type of construction activity and duration. The project construction schedule
shall address all construction activity from the start of the project to completion.
5.14 POPULATION AND HOUSING
5.14.1 Summary of Previous Environmental Analysis
According to the Certified EIR, the Approved Project would generate 2,126 jobs, which is unlikely to exceed
regional employment projections for City of Santa Ana. Job creation could increase housing demand in the
City, which would be met by the construction of new residential projects and existing housing programs. The
Certified EIR determined that it is unlikely that the increase would exceed regional projections. No mitigation
measures were required.
5.14.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Page 72
PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
X
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)?
b) Displace substantial numbers of existing
people or housing, necessitating the
X
construction of replacement housing
elsewhere?
Southern California Association of Governments
The Southern California Association of Governments (SCAG) represents Imperial, Los Angeles, Orange,
Riverside, San Bernardino, and Ventura counties. It is a regional planning agency and serves as a forum for
addressing regional issues concerning transportation, the economy, community development, and the
environment. SCAG maintains the Regional Transportation Plan/Sustainable Communities Strategy
(RTP/SCS). On April 7, 2016, SCAG adopted the 2016-2040 Regional Transportation Plan/Sustainable
Communities Strategy (RTP/SCS). As part of the RTP/SCS, SCAG analyzes demographic and growth
forecasts for its region (SCAG 2016a). Table 8 below summaries the growth projections for the City of Santa
Ana and Orange County.
Table 8 Forecast, City of Santa Ana and Orange Cou
Change, Percent Change,
2012 2040 2012-2040 2012-2040
Population
City of Santa Ana
329,200
343,100
13,900
4.2%
Orange County
3,071,600
3,461,500
389,900
12.7%
Housing
City of Santa Ana
73,300
78,000
4,700
6.4%
Orange County
999,500
1,152,300
152,800
15.3%
Employment
City of Santa Ana
154,800
166,000
11,200
7.2%
Orange County
1,526,500
1,898,900
372,400
24.4%
Source: SCAG 2016b.
Apri12020 Page 73
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Induce substantial unplanned population growth in an area, either directly (for example, by
proposing new homes and businesses) or indirectly (for example, through extension of roads or
other infrastructure)?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would introduce residential units to the Approved Project, which did not include
residential uses. The Proposed Project would allow for approximately 318,153 square feet of residential uses
(maximum of 415 dwelling units) within up to 19 floors in place of some of the office uses. The Proposed
Project would result in direct population growth with the incorporation of housing units.
The City of Santa Ana assumes an average of 2.4 persons per multi -family units based on Municipal Code
Section 34-204. The Proposed Project's 415 dwelling units would conservatively generate 996 new residents.
Based on Table 8 above, the Proposed Project's 415 dwelling units and anticipated population growth would
be well within the growth projections for the City of Santa Ana and for Orange County. As such, the Proposed
Project would not result in unplanned population growth or housing growth.
With regards to employment, the Certified EIR found that the Approved Project's office and commercial uses
would generate 2,126 jobs that would be within the anticipated growth projections. The Proposed Project would
result in a decrease in non-residential square footage and would therefore generate less jobs than the Approved
Project. The Approved Project's employment generation is within SCAG's employment growth projections,
and therefore the Proposed Project's employment generation is within SCAG's employment growth projections.
As such, the Proposed Project would not result in unplanned, indirect population growth.
A significant impact related to population or housing would not occur and no mitigation is required. No changes
or new information would require preparation of a subsequent EIR.
b) Displace substantial numbers of existing people or housing, necessitating the construction of
replacement housing elsewhere?
No Impact. The southern portion of the Project Site where the office tower is to be located is currently under
construction for the Approved Project. The Proposed Project would allow for residential units within the
previously approved office tower building. The Proposed Project would not develop new building square
footage or expand the Approved Project. The Proposed Project would not create a new significant impact or
a substantial increase in the severity of previously identified effects. No changes or new information would
require preparation of a subsequent EIR.
5.14.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to population and housing were identified in the Certified EIR.
Page 74 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.15 PUBLIC SERVICES
5.15.1 Summary of Previous Environmental Analysis
According to the Certified EIR, the Approved Project would create additional demand for police services and
fire and/or emergency rescue services. Additionally, the Approved Project would be expected to lead to new
school -aged students. The Certified EIR determined that the Approved Project would not impact library
services. Potential impacts would be reduced to less than significant levels through implementation of identified
mitigation measures.
The Approved Project's impact to parks was discussed in the Initial Study to the Certified EIR under the
Recreation topic. The Initial Study determined that implementation of the Approved Project would not
significantly increase the use of area parks or lead to substantial physical deterioration of these recreation
resources. The Approved Project's impact on parks and recreational facilities was determined to be less than
significant.
5.15.2 Impacts Associated with the Proposed Project
Would the Proposed Project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities, the
construction of which could cause significant environmental impacts, in order to maintain acceptable service
ratios, response times, or other performance objectives for any of the public services:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Fire protection?
X
b) Police protection?
X
c) Schools?
X
d) Parks?
X
e) Libraries?
X
Comments:
a) Fire protection?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Orange County Fire Authority (OCFA) provides fire protection and emergency services to the project
area. The Proposed Project would allow for residential uses in place of some of the approved office uses. The
Apri12020 Page 75
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Proposed Project would occur within the existing building envelope and would not increase the size of the
building nor add new floor area. As with the Approved Project, the Proposed Project would be required to pay
fire facilities fees. The payment of the fire facilities fees would reduce the impact of the Proposed Project. With
the implementation of mitigation identified in the Certified EIR, the impact would remain less than significant.
The Proposed Project shall comply with such mitigation measures and would not create a new significant impact
or a substantial increase in the severity of previously identified effects. The obligation of the Proposed Project
to meet all access, water and fire protection systems required under the California Building Code and Fire Code,
as well as the City Municipal Codes will assist in maintaining impacts that are less than significant. No changes
or new information would require preparation of a subsequent FIR.
b) Police protection?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As discussed in the Certified EIR, the Santa Ana Police Department (SAPD) provides all law enforcement
services to the project area. The Proposed Project would allow for residential uses in place of some of the
approved office uses. The Proposed Project would occur within the existing building envelope and would not
increase the size of the building nor add new floor area. As with the Approved Project, the Proposed Project
would comply with identified mitigation measures to ensure that the design of the Proposed Project meets
SAPD's design standards and on -site security and impacts would be less than significant. The Proposed Project
would not create a new significant impact or a substantial increase in the severity of previously identified effects
and would not require the preparation of a subsequent EIR.
c) Schools?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Project Site is served by the Santa Ana Unified School District (SAUSD). The Proposed Project would be
served by Heroes Elementary School (located at 1111 W Civic Center Dr), Willard Intermediate School (located
at 1342 N Ross St), and Santa Ana High School (located at 520 W Walnut St). The Proposed Project would
generate up to 415 residential units and up to 996 residents at the Project Site, some of which are expected to
be school -aged children. As shown in Table 9, the Proposed Project would be expected to generate
approximately 234 students. As such, the Proposed Project would increase the demand for school services. As
with the Approved Project, the Proposed Project would be required to pay SB 50 school impact fees to the
SAUSD. Payment of school impact fees will ensure that the impact of the Proposed Project on school services
are less than significant level; the Proposed Project would not result in the need for new or physically altered
schools or result in the construction of a new school. The Proposed Project would not create a new significant
impact or a substantial increase in the severity of previously identified effects.
Page 76 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Table 9 Proposed Project Student Generation
School
Generation Rate (Multifamily)
Proposed Dwelling Units
Student Generated
Elementary School
0.2899
415
120
Middle School
0.1256
415
52
High School
0.1484
415
62
Total:
234
Source: Dolinka Group 2014.
d) Parks?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would generate residents on -site which are anticipated to use area parks. As discussed in
the Initial Study for the Approved Project, French Park is the nearest park to the Project Site. Sasser, Angels,
and Birch Parks are also in the project vicinity. Additionally, the Approved Project includes a courtyard on -site
and interior recreation space, which could be used by onsite residents. The development of the Proposed
Project would be required to comply with the City's Park Acquisition and Development Fee. Payment of the
park fees would ensure that the Proposed Project's impacts are less than significant.
e) Library services?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As indicated in the Certified EIR, the Project Site is served by Santa Ana Library System services. The Project
area is served by the Civic Center Library at 26 Civic Center Plaza, which is approximately 0.3 miles southwest
of the Project Site. The Santa Ana Library system includes the Civic Center Library, which includes a computer
lab, learning center, and Santa Ana History Room, and the Newhope Library Learning Center, which includes
a computer lab, learning center, and teen space. The City also has the Rancho Santiago Community College
Library and the Orange County Law Library.
Future residents of the Project Site would be mainly served by the Civic Center Library; however, residents
would have access to all libraries in the City of Santa Ana. The ability to visit any library within the Santa Ana
Library System would alleviate demand on the Civic Center library. Further, the Santa Ana Library system is
funded by the City's General Fund in combination with grants and donations (City of Santa Ana 2020). As
such, the operation of the One Broadway Plaza would contribute to the library by paying property taxes.
Therefore, the Proposed Project would result in a less than significant impact to library services.
5.15.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as for deleted text and bold for new,
inserted text.
Apri12020 Page 77
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
PS-1 The design of the project parking structure shall conform to the City of Santa Ana Police
Department's design standards for parking structures.
PS-2 The design of the project shall include on site office spaces for the SAPD, which will be shared
with any on site security staff. Two designated parking spaces will be provided for the SAPD
near the main entrance of the proposed One Broadway Plaza project.
PS-3 Prior to issuance of building permits, the project developer shall submit a construction
phasing plan for the proposed project to the SAFD OCFA. The plan will be consistent with
SAFD OCFA Fire Code requirements. Also, the project developer shall provide evidence to
the SAFD OCFA that the proposed fire protection services will be adequate to serve the
proposed project development. A fire exit shall be provided in the office mixed -use building
along with adequate fire protection facilities and equipment to serve the proposed 37-story
office mixed -use building.
PS-4 Prior to issuance of building permits, the project developer shall submit a construction
phasing plan for the project to the SAFD OCFA. This plan will show that emergency vehicle
access to the project site is adequate. Emergency access will be provided on Washington
Avenue and Sycamore Street.
PS-5 The final design of the project shall include fire sprinklers in the office mixed -use building
and parking garage at locations specified by the SAPD OCFA. The project shall also conform
with all applicable SAPD OCFA fire protection and access requirements.
PS-6 The final design of the project shall include fire hydrants at locations specified by the
SOCFA.
PS-7 The project developer shall notify the SAM 0CFA and SAPD when the affiee mixed -use
building heliport is operational-
PS-8 The project developer shall contribute a fair share amount to have an emergency vehicle
preemption detector placed on the existing traffic signal arm at the intersection of Broadway
Street and 10th Street, Broadway Street and Washington Avenue and Washington Avenue and
Sycamore Street. These detectors shall also be placed on any other traffic signal and modified
as part of this project.
PS-9 The project developer shall incorporate a repeater in the design of the project to prevent
interference with Police and Fire Department radio signals.
PS-10 Prior to the issuance of building permits, the project developer shall submit evidence to the
City of Santa Ana of a fee payment between the developer and the SAUSD to offset school
facility related impacts.
PS-11 The project site and sidewalks adjacent to the site shall be properly barricaded to prevent
unauthorized access to the site during project construction activities.
Page 78 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
PS-12 The Principals at Willard Intermediate School, the Orange County High School of Arts, El
Sol Science and Arts Academy, Orange County Educational Arts Academy, and Davis
Elementary School shall be notified by the project developer before project construction
begins that students may be required to use sidewalks on the opposite sides of streets to avoid
project construction activities and closure of the sidewalks adjacent to the project site.
PS-13 The project developer shall submit to the Santa Ana Unified School District a School Access
Plan that provides for the safe passage of students to and from Willard Intermediate School
and the Orange County High School of the Arts. The plan shall be subject to approval by the
Santa Ana Unified School District before construction activities are initiated. The School
Access Plan shall include, but not be limited to:
■ The closure of the sidewalks on Washington Avenue, Tenth Street, Sycamore Street and
Broadway adjacent to the project site. Appropriate signs shall be posted that the sidewalks
are closed and pedestrians are directed to use sidewalks on the opposite sides of the
streets.
■ Barricading the perimeter of the project site with temporary fencing to secure
construction equipment, minimizing trespassing, vandalism and short-cut attractions, and
to reduce hazards to students during project demolition activities.
■ The posting of a flag person at the entrance(s) to the project site to protect pedestrians
from conflicts with heavy equipment and haul trucks entering or leaving the project site
during the times of school arrivals and departures.
■ The funding of crossing guards at the intersection of Washington Avenue and Broadway,
Washington Avenue and Sycamore Street, Tenth and Sycamore Streets and Tenth Street
and Broadway. Crossing guards shall be provided during the times of school arrivals and
departures when the schools are in session Monday through Friday. If determined to be
necessary by the principal of the Orange County High School of the Arts (OCHSA),
provide crossing guards at the intersection of Sycamore and Tenth Streets when special
daytime performances are held at the OCHSA auditorium.
Provide sufficient written notice of commencement and completion of project
construction activities to the principals of Willard Intermediate School and the Orange
County High School of the Arts.
Provide the name and telephone number of a contact person who is knowledgeable about
the project for the developer and construction contractor for use by the principals of
Willard Intermediate School and the Orange County High School of the Arts.
Apri12020 Page 79
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.16 RECREATION
5.16.1 Summary of Previous Environmental Analysis
According to the Initial Study prepared for the Certified EIR, the Approved Project would not significantly
increase the use of area parks or recreational facilities. The Approved Project would not result in the
deterioration of recreational resources in the area. The Approved Project does not include recreational
facilities that would require the construction or expansion of recreational facilities.
5.16.2 Impacts Associated with the Proposed Project
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Would the project increase the use of
existing neighborhood and regional parks or
other recreational facilities such that
X
substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
X
might have an adverse physical effect on
the environment?
The Parks, Recreation, and Community Services Agency have been responsible for maintaining, managing
construction, and programming facilities within its park and recreation network, along with several public
school grounds. The Agency provides a range of recreational opportunities that include parks, sport fields, the
Santa Ana Stadium, senior and recreation centers, swimming pools, the Santa Ana Zoo, and the trail system.
Comments:
a) Would the project increase the use of existing neighborhood and regional parks or other
recreational facilities, such that substantial physical deterioration of the facility would occur or be
accelerated?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As discussed in Section 5.14, Population and Housing, the Proposed Project would be expected to generate
996 residents. These residents are anticipated to use area parks and recreational resources. However, the
Proposed Project would not result in the substantial physical deterioration of area parks or recreational facilities.
The development of the Proposed Project would be required to comply with the City's Park Acquisition and
Page 80 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Development Fee. The payment of the fee would ensure that the Proposed Project's impacts are less than
significant.
b) Does the project include recreational facilities or require the construction or expansion of
recreational facilities, which might have an adverse physical effect on the environment?
No Impact. As with the Approved Project, no public recreational facilities are proposed as part of the
Proposed Project. The Proposed Project would not create a new significant impact or a substantial increase in
the severity of previously identified effects that would require the preparation of a subsequent EIR.
5.16.3 Adopted Mitigation Measures Applicable to the Proposed Project
No mitigation measures related to recreation were identified in the Certified EIR.
5.17 TRANSPORTATION
5.17.1 Summary of Previous Environmental Analysis
Primary arterial access to the Approved Projectwould be provided by Main Street and Broadway. The Approved
Project includes the development of an eight -level parking garage which would have access from two locations:
(1) north access along Washington and Sycamore and (2) south access along Sycamore and an exit only driveway
on Broadway. Implementation of the Approved Project would alter the circulation of adjacent roadways, which
would impact surface transportation routes adjacent to and in the vicinity of the Project Site. The Approved
Project could impact traffic through neighborhoods. After incorporation of identified mitigation measures, the
Approved Project would result in a less than significant impact to surface transportation routes and
neighborhood traffic. The Certified EIR determined that the Approved Project would not impact any existing
bus routes or other transit facilities along Broadway; however, the Approved Project would generate workers
who are likely to use the bus system. The Approved Project would temporarily remove sidewalks along most
of the Project Site to accommodate project construction and will be re -constructed by project as part of street
improvements. The Approved Project incorporates mitigation measures to address increased bus demand and
pedestrian facilities and would result in a less than significant impact. The Approved Proj ect would be required
to comply with the City's Transportation Demand Management Ordinance. Implementation of the Approved
Project would result in two street segments (Main Street between 17th Street and 1st Street and Broadway
between (Santa Clara Avenue and 1st Street) and seven intersections (Main Street & 17th Street; Broadway
Street & 17th; Main Street & Washington Avenue; Broadway Street & 4th Street; 1st Street & Flower Street;
Santa Ana Boulevard & Flower Street; and Fairview & 1st Street) exceeding the level of service thresholds.
After the incorporation of mitigation measures, the impact at these intersections and roadway segments remain
significant and unavoidable.
5.17.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Apri12020
Page 81
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Conflict with a program, plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle and
X
pedestrian facilities?
b) Would the project conflict or be inconsistent
with CEQA Guidelines section 15064.3,
X
subdivision (b)?
c) Substantially increase hazards due to a
geometric design feature (e.g., sharp curves
or dangerous intersections) or incompatible
X
uses (e.g., farm equipment)?
d) Result in inadequate emergency access?
X
This section is based on the report prepared by Urban Crossroads on April 16, 2020, titled One Broadway Pla.Za
Trip Generation Evaluation ("Trip Generation Evaluation'. The Trip Generation Evaluation is contained in
Appendix B.
Methodology
Trip Generation
The Trip Generation Evaluation by Urban Crossroads compared the Proposed Project's trip generation with
the Approved Project's Trip generation. Urban Crossroads calculated the Proposed Project's trip generation.
Table 10 presents the trip generation rates obtained from the ITE Trip Generation Manual (10th Edition, 2017)
for the proposed multifamily housing use and the remaining other office, retail, and restaurant uses originally
contemplated. The ITE trip generation rate utilized for the multifamily housing is for developments located
within City Center Core areas (as opposed to rates for developments within a general urban/suburban setting).
The average rates for General Office uses located within City Center Core areas has also been utilized to
estimate the trip generation for the office uses proposed in the tower, while the average rates for General Office
located within general urban/suburban areas have been used to estimate traffic for the rehabilitated structures.
The latest ITE Trip Generation Manual does not provide any trip rate data for Specialty Retail, as such, the
average rates for the Shopping Center land use (ITE Code 820) have been utilized. Similar to the 2002 Traffic
Study, an AM inbound and outbound split is not reported for the Quality Restaurant land use. As such, a
50%/50% split has been assumed for the AM peak hour, consistent with the 2002 Traffic Study.
Page 82 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Table 10 ITE Trip Generation Rates
Land Use
Units
ITE LU
Code
AM Peak Hour
PM Peak Hour
Dail
In
Out
Total
In
Out
Total
Multifamily Housing (High-Rise)
DU
222
0.08
0.14
0.22
0.13
0.10
0.23
2.16
General Office 2
TSF
710
0.43
0.07
0.50
0.07
0.36
0.43
4.30
General Office 3
TSF
710
1.00
0.16
1.16
0.18
0.97
1.15
9.74
Shopping Center
TSF
820
0.58
0.36
0.94
1.83
1.98
3.81
37.75
Quality Restaurant 4
TSF
931
0.37
0.37
0.73
5.23
2.57
7.80
83.84
High Turnover (Sit -Down) Restaurant
TSF
932
5.47
4.47
9.94
6.06
3.71
9.77
112.18
Source: Urban Crossroads 2020 (Appendix B)
Notes: DU = dwelling units; TSF = thousand square feet
1 Based on average rates for developments located within Center City Core areas.
2 Based on average rates for ITE Land Use Code 710 for developments located within Center City Core areas (using 253,728 square feet). Daily trip generation rate
not available in ITE Trip Generation Manual. Estimated based on 10 times the PM peak hour.
3 Based on average rates for ITE Land Use Code 710.
4 ITE Trip Generation Manual does not provide in/out split for the AM peak hour; as such, a 50/50 split has been assumed.
Based on Table 10 above, the resulting trip generation for the Proposed Project is shown on Table 11. Pass -by
reduction assumptions for the shopping center, quality restaurant, and high turnover (sit-down) restaurant uses
are consistent with the current ITE Trip Generation Handbook (3rd Edition, 2017). A 5% reduction has also
been applied to account for transit mode share, consistent with other projects in the City of Santa Ana. As
shown in Table 11, the Proposed Project is estimated to generate 2,792 trip -ends per day with 234 AM peak
hour trips and 301 PM peak hour trips.
Table 11 Proposed Project Trip Generation Summary
Land Use
Quantit
Units
AM Peak Hour
PM Peak Hour
Dail
In
Out
Total
In
Out
Total
Multifamily Housing (High -Rise) (Tower)
415
DU
35
57
92
55
40
95
896
Office (Tower)
190.047
TSF
82
13
95
13
69
82
818
Office (Rehabilitated Structures)
9.803
TSF
10
2
12
2
9
11
96
Shopping Center (Tower & Garage)
8.525
TSF
5
3
8
16
17
33
322
Pass -by Reduction (PM/Daily: 34%):
0
0
0
-5
-5
-10
-110
Shopping Center Total:
5
3
8
11
12
23
212
Quality Restaurant (Tower)
15.915
TSF
6
6
12
83
41
124
1,334
Pass -by Reduction (PM/Daily: 44%):
0
0
0
-18
-18
-36
-588
Quality Restaurant Total:
6
6
12
65
23
88
746
High Turnover (Sit Down) Restaurant
(Rehabilitated Structures)
2.681
TSF
15
12
27
16
10
26
302
Pass -by Reduction (PM/Daily: 43%):
0
0
0
-4
-4
-8
-130
Apri12020 Page 83
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Table 11 Proposed Project Trip Generation Summary
Land Use
Quantity
Units
AM Peak Hour
PM Peak Hour
Dail
In
Out
Total
In
Out
Total
High Turnover (Sit -Down) Restaurant Total:
15
12
27
12
6
18
172
Transit Mode Share Reduction (5%):
-8
-5
-12
-8
-8
-16
-148
PROPOSED PROJECT TOTAL
145
88
234
1 150
151
301
2,792
Source: Urban Crossroads 2020 (Appendix B)
Notes: DU = dwelling units; TSF = thousand square feet
Comments:
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including
transit, roadway, bicycle and pedestrian facilities?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Circulation System and Roadways
Based on the Trip Generation Evaluation by Urban Crossroads, the Approved Project included a total of 744
AM Peak Hour Trips, 819 PM Peak Hour Trips, and 6,686 trip -ends per day. Based on Table 11, above, the
Proposed Project would generate 2,792 trip -ends per day with 234 AM peak hour trips and 301 PM peak hour
trips. Table 12 below compares the Proposed Project's trip generation with the Approved Project. As shown in
Table 12, the development of the Proposed Project is anticipated to generate 3,894 fewer trip -ends per day
with 510 fewer AM and 518 fewer PM peak hour trips as compared to the Approved Project. This equates to
a 69 percent reduction during the AM, 63 percent reduction during the PM peak hour, and a 58 percent
reduction to daily trip -ends. As the Proposed Project would result in a reduction of trips compared to the
Approved Project, the Proposed Project would not generate new impacts to the circulation system. No
significant new impact or substantial increase in the severity of a previously described impact would occur, and
the preparation of a subsequent EIR would not be required.
Table 12 Trip Generation Comparison
Project
AM Peak Hour
PM Peak Hour
Dail
In
Out
Total
In
Out
Total
Currently Approved 1
637
107
744
211
609
819
6,686
Proposed Project 2
145
88
234
150
151
301
2,792
Change
-492
-19
-510
-61
-458
-518
-3,894
Source: Urban Crossroads 2020 (Appendix B)
1 Trip generation based on the currently approved Project per the 2002 Traffic Study.
2 Proposed Project trip generation.
Page 84
PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
All roadway improvements described in Mitigation Measures T-1 through T-13 are part of the Approved
Project and will continue to be in effect as part of the Proposed Project. Since the Proposed Project would
reduce the number of trips compared to the Approved Project, the Proposed Project would not require any
additional roadway improvements than those required as part of the Approved Project. The Proposed Project
will incorporate all mitigation measures that are part of the Proposed Project, which would further ensure that
impacts to the City's circulation systems are less than significant.
Transit, Bicycle and Pedestrian Facilities
The Proposed Project would occur within the building envelop of the Approved Project. The Proposed Project
would not introduce any new roadway features that may impact transit, bicycle or pedestrian facilities. The
Proposed Project would not conflict with adopted policies, plans, or programs supporting alternative
transportation. The Proposed Project would comply with City of Santa Ana Municipal Code requirements and
applicable local, state, or federal laws or regulations. The Proposed Project will adhere to mitigation measures
identified in the Certified EIR, which would ensure that impacts to alternative transportation remains less than
significant, therefore, the preparation of a subsequent EIR would not be required.
b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision
(b)?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project is a mixed -use residential/office project located within a designated TPA. As a result, the
Proposed Project is consistent with CEQA Guidelines section 15064.3. As stated in the City of Santa Ana
Traffic Impact Study Guidelines (September 2019), projects may be screened out from completing a full VMT
analysis if they have the potential to reduce VMT/SP and would consequently result in a less -than -significant
transportation impact. In other words, the project should have the potential to reduce VMT/SP and be
consistent with the Regional Transportation Plan (RTP)/Sustainable Communities Strategy's (SCS) in order to
be initially screened out. Projects located within Transit Priority Areas (I?As) and low-VMT generating Traffic
Analysis Zones (TAZ) have the potential to reduce VMT/SP and are consistent with the RTP/SCS. As
illustrated in Appendices A and B of the City of Santa Ana Traffic Impact Study Guidelines, the Proposed
Project is located in a TPA and low-VMT generating TAZ.
The Project is proposed to develop residential, office, retail, and restaurant uses. The mixed -use nature of the
Proposed Project promotes low-VMT generation within the TAZ as well as the overall City. As discussed with
the City of Santa Ana Planning Department, an increase of approximately 5,406 households is projected for
the City based on the Orange County Transportation Analysis Model (OCTAM) from the base year of 2016 to
the forecasted year of 2045. As such, the households proposed by the Project would be consistent with the
growth anticipated in the RTP/SCS for the City. Orange County currently experiences a high demand and low
supply of households in the region and the Proposed Project would have the potential to serve the regional
demand for households and is therefore consistent with the goals and objectives of the RTP/SCS.
The Proposed Project would result in a less than significant impact. The preparation of a subsequent EIR
would not be required.
Apri12020 Page 85
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm equipment)?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project would place multi -family residential units within an urbanized area where multi -family
residential units already exist. Therefore, the Proposed Project would not introduce incompatible uses. The
Proposed Project would not alter access to the Project Site nor introduce new geometric design features beyond
what was analyzed in the Certified EIR. The Proposed Project would adhere to all identified mitigation
measures identified in the Certified EIR, which would ensure that impacts regarding geometric design feature
are less than significant. Therefore, no significant new impact or substantial increase in the severity of a
previously described impact would occur, and the preparation of a subsequent EIR would not be required.
d) Result in inadequate emergency access?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Approved Project incorporates two access points to the approved eight -level parking garage. As part of
the development of the Approved Project, the Approved Project incorporates street improvements, such as
the installation of a roundabout at the intersection of Sycamore Street and 10th Street and other roadway
modifications. The Certified EIR determined that the Approved Project's impact to surface transportation
routes adjacent to or in the vicinity of the Project Site would be less than significant with the incorporation of
mitigation measures. The Proposed Project does not include any roadway modifications and as shown in Table
12, the Proposed Project would result in a reduction of project trips. Therefore, the Proposed Project would
not create significant new impact or substantial increase in the severity of a previously described impact, and
the preparation of a subsequent EIR would not be required.
5.17.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into Mitigation Monitoring Plan for this Addendum. Any
modifications to the mitigation measures from the Certified EIR are shown as strikegifetigh for deleted text
and bold for new, inserted text.
T-1 The developer shall pay all costs (design, construction, administration and inspection) for
Washington Avenue and 10th Street to operate as one-way streets which include signal
modifications and appropriate protected left -turn signal at Main Street/Washington Avenue,
Main Street/10th Street, Washington Avenue/Sycamore Street, Broadway Street/Washington
Avenue and Broadway Street/10th Street.
T-2 The project proponent shall pay for all costs for the installation of a roundabout at the
intersection of Sycamore Street and 10th Street.
T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge area at
the intersection of Sycamore Street and 10th Street where a roundabout is to be constructed.
The project developer shall be required to pay all costs (design, construction, administration
Page 86 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
and inspection) for these mitigation measures, as they are part of the roundabout as stated in
T-2.
T-4 Main Street, between 17th Street and the 1-5 ramps, shall have all on -street parking stalls and
parking meters removed, and Main Street shall be restriped to provide three northbound and
two southbound travel lanes. The project proponent shall pay all costs (design, construction,
administration and inspection) associated with these removals and re -striping when building
permits are issued.
T-5 Main Street, between 17th Street and Civic Center Drive, shall have all on -street parking stalls
and parking meters removed and Main Street shall be re -striped to provide a third northbound
through lane within the existing right-of-way. The developer shall pay all costs associated with
re -striping and removing existing parking meters.
T-6 The developer shall pay all costs (acquisition, design, construction, administration and
inspection) for providing southbound right -turn lane at the intersection of Main Street and
17th Street.
T-7 The developer shall pay all costs (acquisition, design, construction, administration and
inspection) for providing southbound right -turn lane at the intersection of Broadway Street
and 17th Street.
T-8 Westbound Santa Clara Avenue shall be re -striped at Broadway Street to provide one left turn
lane and one shared left turn/right turn lane. The project proponent shall pay all costs (design,
construction, administration and inspection) associated with this re -striping when project
building permits are issued.
T-9 Northbound Grand Avenue from Fruit Street to 14th Street shall be re -striped at Santa Ana
Boulevard/1-5 HOV ramps to provide three northbound travel lanes. The project proponent
shall pay all costs (design, construction, administration and inspection) associated with this re -
striping when project building permits are issued.
T-10 I-5 northbound off -ramp shall be re -striped to provide a westbound left turn lane, a shared
left turn/right turn lane and a right turn lane at Grand Avenue. The project developer shall
pay all costs (design, permitting, construction, administration and inspection) when building
permits are issued.
T-11 A new traffic signal shall be installed at the intersection of Main Street and 15th Street.
Communications cable and conduit required to connect the traffic signal to the City of Santa
Ana's Traffic Signal Master System shall be a part of traffic signal installation. The project
proponent shall pay all costs (design, construction, administration and inspection) associated
with this signalization when project building permits are issued.
T-12 A new traffic signal shall be installed at the intersection of Santa Ana Boulevard and French
Street. Communications cable and conduit required to connect the traffic signal to the City of
Apri12020 Page 87
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Santa Ana's Traffic Signal Master System shall be a part of traffic signal installation. The
project proponent shall pay all costs (design, construction, administration and inspection)
associated with this signalization when building permits are issued.
T-13 A new traffic signal shall be installed at the intersection of Sycamore Street and 15th Street.
Communications cable and conduit required to connect the traffic signal to the City of Santa
Ana's Traffic Signal Master System shall be a part of traffic signal installation. The project
proponent shall pay all costs (design, construction, administration and inspection) associated
with this signalization when building permits are issued.
T-14 The project proponent shall pay the appropriate City Transportation System Improvement
Fee to help offset the One Broadway Plaza Projects' impact on the City of Santa Ana street
system.
T-15 The developer should coordinate with the Orange County Transportation Authority (OCTA)
to identify ways to enhance transit use by tenants of One Broadway Plaza. The project
developer shall install a bus stop, bus transit or any other transit related improvements if
requested by the OCTA.
T-16 The project proponent shall satisfy the relevant requirements of the City's TDM Ordinance,
including conformity of site plans with facility standards specified in the TDM Ordinance,
and submission and implementation of a TDM strategy plan and program.
T-17 The project developer shall contribute to neighborhood traffic studies for the six
neighborhoods evaluated in Section 3.5.8 of the Certified EIR (including before and after
traffic counts) in order to assess any intrusion of project traffic into these neighborhoods. If
traffic intrusion attributable to the project is identified, corrective measures will be identified.
Depending of the potential impacts, examples of corrective measures could include; forced -
turn channelization, semi-diverters, diagonal diverters and cul-de-sacs. If approved by the
neighborhoods per the City's Procedures for Neighborhood Traffic Plans, corrective measures
will be implemented at a maximum cost to the developer of $200,000 per neighborhood. The
funds to implement the improvements are directly payable to the City of Santa Ana prior to
issuance of building permits.
T-18 The project parking garage entrances/exits shall be designed to meet City sight distance
standards. A landscaped median shall be constructed at the intersection of Broadway at the
parking structure egress to restrict left turn movements from of vehicles exiting on Broadway
subject to the review and approval of the City Engineer. The project proponent shall pay all
costs associated with this median prior to building permits being issued.
T-19 To assure use of onsite parking as intended, the project proponent or their successor will
require that all residential and commercial tenants leases specify that residents and
employees must park onsite within the One Broadway Plaza parking garage. In addition, the
property manager will require that parking personnel patrol adjoining properties on a daily
Page 88 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
basis to enforce such lease provisions. This daily patrol will be performed by a uniformed
parking employee driving a utility vehicle that will be signed to identify it as a part of the One
Broadway Plaza Management. The areas to be patrolled will be marked on a grid map of the
streets surrounding One Broadway Plaza.
T-20 The project developer shall provide pedestrian access around the project site during project
construction activities and post appropriate signs around the site directing pedestrians to use
the sidewalks across the street from the project site. Permanent sidewalks shall be installed
around the project site to provide for pedestrians access to the site.
T-21 Prior to approval of the project plans, the project proponent will file a Notice of Proposed
Construction or Alteration with the FAA. Conditions placed on the project by the FAA will
be incorporated in the final design and construction of the project office tower.
T-22 Prior to approval of the project plans, the project proponent shall take the project to the
Orange County Airport Land Use Commission for a review and consistency determination.
T-23 After certification of the project Final EIR, the project proponent shall apply to the Caltrans
Aeronautics Department for a State helipad Permit.
T-24 There is no measure T-24.
T-25 Vehicles traveling westbound on Washington Avenue shall be diverted either northbound or
southbound at Main Street.
T-26 Vehicles traveling eastbound on Tenth Street shall be diverted either northbound or
southbound at Main Street.
Apri12020 Page 89
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.18 TRIBAL CULTURAL RESOURCES
5.18.1 Summary of Previous Environmental Analysis
Tribal Cultural Resources was not analyzed as a topic in the prior Certified EIR but was addressed in the
Cultural Resources topic. The Certified EIR found that the Approved Project's location in the Santa Ana
floodplain and the limited number of Native American remains found or recorded in the immediate area, the
potential for finding buried prehistoric remains low. However, the possibility exists of unearthing prehistoric
remains with deeper excavations. The Certified EIR implemented mitigation measures CR-5 through CR-8 to
reduce the impact of to find to a less than significant level.
5.18.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Environmental Issues
Substantial
Change in
Project
Requiring
Major EIR
Revisions
Substantial
Change in
Circum-
stances
Requiring
Major EIR
Revisions
New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR
No Impact
a) Would the project cause a substantial
adverse change in the significance of a
tribal cultural resource, defined in Public
Resources Code § 21074 as either a site,
feature, place, cultural landscape that is
geographically defined in terms of the size
and scope of the landscape, sacred place,
or object with cultural value to a California
Native American tribe, and that is:
(i) Listed or eligible for listing in the
California Register of Historical Resources,
or in a local register of historical resources
as defined in Public Resources Code
X
section 5020.1(k), or
(ii) A resource determined by the lead
agency, in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in subdivision
(c) of Public Resources Code § 5024.1. In
applying the criteria set forth in subdivision
(c) of Public Resource Code § 5024.1, the
lead agency shall consider the significance
of the resource to a California Native
American tribe.
Page 90
PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
The City of Santa Ana sent certified tribal consultation letters to 10 Native American contacts notifying them
of the Proposed Project pursuant to SB 18. No tribal consultation requests were received.
Comments:
a) Would the project cause a substantial adverse change in the significance of a tribal cultural
resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural
landscape that is geographically defined in terms of the size and scope of the landscape, sacred
place, or object with cultural value to a California Native American tribe, and that is:
(i) Listed or eligible for listing in the California Register of Historical Resources, or in a local
register of historical resources as defined in Public Resources Code section 5020.1(k), or
(ii) A resource determined by the lead agency, in its discretion and supported by substantial
evidence, to be significant pursuant to criteria set forth in subdivision?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Proposed Project amends the existing entitlements of the Approved Project, to allow for residential uses.
The Proposed Project would not result in new excavations or earthwork activities that have the potential to
unearth tribal cultural resources. As such, the Proposed Project would not have the possibility of unearthing
tribal resources. The City of Santa Ana sent certified tribal consultation letters pursuant to SB 18. No tribal
consultation requests were received. No significant new impact or substantial increase in the severity of a
previously described impact would occur, and there are no substantial changes in the circumstances, or new
information that was not known and could not have been known at the time of the adoption of the Certified
EIR with respect to Tribal Cultural Resources and a subsequent EIR is not required.
5.18.3 Adopted Mitigation Measures Applicable to the Proposed Project
Refer to the Cultural Resources Section CR-5 through CR-8.
5.19 UTILITIES AND SERVICE SYSTEMS
5.19.1 Summary of Previous Environmental Analysis
The Certified EIR determined that the Approved Project would increase the demand for electricity, natural gas,
water, and telephone services. The Approved Project would increase the generation of wastewater, soil waste,
and runoff. The Certified EIR found that the construction of the Approved Project would require the removal
of electrical facilities, gas lines, phone lines, and water and sewer lines to allow for Approved Project
improvements. The Approved Project would install replacement utilities infrastructure and/or pay its fair -share
where needed. The Approved Project would contribute a fair -share contribution to upgrade storm drains. The
Approved Project would result in a less than significant impact to telephone service; telephone easements on
the Project Site would be consolidated. The Approved Project was found to create a significant and unavoidable
impact with the interference of television signals from area television stations.
Apri12020 Page 91
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
The Approved Project would comply with federal, state and local statutes and regulations for solid waste,
including the City's recycling program. The project contractor would be required to recycle demolition and
construction debris. The Approved Project was found to result in no impact.
5.19.2 Impacts Associated with the Proposed Project
Would the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
X
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
b) Have sufficient water supplies available to
serve the project from existing entitlements
and resources or are new or expanded
X
entitlements needed?
c) Result in a determination by the wastewater
treatment provider which serves or may
serve the project that it has adequate
capacity to serve the project's projected
X
demand in addition to the provider's existing
commitments?
d) Generate solid waste in excess of State or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
X
the attainment of solid waste reduction
goals?
e) Comply with federal, state, and local
management and reduction statutes and
X
regulations related to solid waste?
This section is partially based on the report prepared by DMc Engineering on March 3, 2020, titled Water and
Sewer Coparison for the One Broadway Plara ("Water and Sewer Study"). The Water and Sewer Study is contained
in Appendix C.
Page 92 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Comments:
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment
or storm water drainage, electric power, natural gas, or telecommunications facilities, the
construction or relocation of which could cause significant environmental effects?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Water
As with the Approved Project, the Proposed Project would increase water use within the City, thus potentially
increasing the need for water treatment services, but would not require the construction of new water treatment
facilities or the expansion of existing facilities. The Proposed Project would implement appropriate mitigation
measures. Therefore, there would be no additional impacts related to construction of water improvements
required to serve the Proposed Project. Impacts would remain less than significant and would not require the
preparation of a subsequent EIR.
Wastewater
As with the Approved Project, the Proposed Project would increase wastewater generation, thus potentially
increasing the need for wastewater treatment services, but would not require the construction of new water
treatment facilities or the expansion of existing facilities. The Proposed Project would implement appropriate
mitigation measures. Therefore, there would be no additional impacts related to construction of wastewater
improvements required to serve the Proposed Project. Impacts would remain less than significant and would
not require the preparation of a subsequent EIR.
Stormwater
The Proposed Project would not increase the building footprint and would therefore not affect the
imperviousness of the Approved Project. The Proposed Project would not result in the relocation or
construction of new or expanded stormwater services. Therefore, the Proposed Project would result in a less
than significant impact. The Proposed Project would not create a new significant impact or a substantial increase
in the severity of previously identified effects that would require the preparation of a subsequent EIR.
Electric Power
The Certified EIR found that Southern California Edison (SCE) has sufficient capacity to meet the project -
generated demand for electricity. The Approved Project would not require electricity services beyond those
planned or readily available or a substantial expansion of existing facilities. With the incorporation of identified
mitigation measures, the Proposed Project would not require the construction of new energy production or
transmission facilities beyond what was approved as part of the Approved Project. No significant new impact
or substantial increase in the severity of a previously described impact would occur, and the preparation of a
subsequent EIR would not be required.
Apri12020 Page 93
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Natural Gas
The Certified EIR found that Southern California Gas Company would be served by an existing gas main, and
the Approved Project would not require natural gas facilities beyond those planned or readily available or a
substantial expansion of existing facilities. The Proposed Project would not substantially increase demands
beyond the available supply and with implementation of appropriate mitigation to promote conservation of
energy, impacts would remain less than significant and the preparation of a subsequent EIR would not be
required.
Telecommunications
As with the Approved Project, the Proposed Project would result in a less than significant impact to
telecommunication services. The Proposed Project would be contained within the building envelope of the
Approved Project; therefore, the Proposed Project would not disrupt telecommunication lines with
construction. A less than significant impact would occur with regards to telecommunication. The Proposed
Project would not create anew significant impactor a substantial increase in the severity of previously identified
effects that would require the preparation of a subsequent EIR.
Television Signals
The Proposed Project would be contained within the building envelope of the Approved Project. As such, the
Proposed Project would not add additional building height or expand the building which may contribute further
disrupt television signals. The Proposed Project would therefore result in a less than significant impact. The
Proposed Project would comply with identified mitigation measures. The Proposed Project would not create a
new significant impact or a substantial increase in the severity of previously identified effects that would require
the preparation of a subsequent EIR.
b) Have sufficient water supplies available to serve the project from existing entitlements and
resources or are new or expanded entitlements needed?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
There is a 12-inch water line adjacent to the Project Site running along Broadway street. According to the Water
and Sewer Study prepared by DMc Engineering (dated March 3, 2020, and contained in Appendix C), shows
that the current entitled water demand is estimated to be approximately 46,621 gallons per day. The Proposed
Project's estimated water demand is 71,711 gpd, as outlined in Table 13 below.
Page 94 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Table 13 Proposed Project Water Demand
Land Use
Unit Water Demand
Factor
Project DU, capita or
Acreage
Daily Water Usage(gpd)
Office (commercial)
0.09 gpd/sf
259,002 sf
23,311
Apartments (high-rise residential) — 415 units
110 gpd/capita 2
440 capita 3
48,400
Total Proposed Water Demand
71,711
Total Current Entitled Water Flow
(46,621)
Project Net Water Demand (Project — Current)
+25,090
Notes:
I Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.09 gpd/sf)
2 Unit Water Demand Factors was taken from the City of Santa Ana Water and Sewer Design Guidelines (110 gpd/capita)
3 Capacity was assumed at 1 person per bedroom (440 capita) for the 415 apartments
The Proposed Project would incorporate Mitigation Measure U-7, which requires the developer to pay their
fair share amount for the necessary facilities to accommodate project -related water supplies, and Mitigation
Measure U-10, which requires the project developer to pay all costs for the construction of a new 8-inch
waterline. The Department of Public Works has reviewed the Water and Sewer Study and determined that with
incorporation of identified mitigation measures no new significant impact would result from the
implementation of the Proposed Project.
c) Result in a determination by the wastewater treatment provider which serves or may serve the
project that it has adequate capacity to serve the project's projected demand in addition to the
provider's existing commitments?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
There is a 15-inch sewer line adjacent to the Project Site and running along N. Broadway. Table 14 below
outlines the proposed conditions for wastewater service. The Proposed Project's estimated wastewater
generation is 72,727 gpd.
Table 14 Proposed Project Wastewater Generation
Land Use
Unit Water Demand
Factor
Project DU, capita or
Square Footage
Total Average
Wastewater
Generation(gpd)
Total Peak Flow
Wastewater
Generation cfs 2
Office (commercial)
0.0765 gpd/sf
259,002 sf
19,814 gpd
0.09 cfs
Apartments (residential)
127.5 gpd/unit
415 units
52,913 gpd
0.25 cfs
Total Proposed Wastewater Generation
72,727 gpd
0.34
Total Current Entitled Wastewater Flow
(39,628) gpd
(0.18) cfs
Project Net Wastewater Flow (Project — Current)
1 +33,099 gpd
1 +0.16 cfs
Notes:
1 Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.0765 gpd/sf & 127.5 gpd/unit)
2 Peak Flow = 3 * Average Daily Flow
Apri12020 Page 95
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
The Proposed Project would incorporate Mitigation Measure U-10, which requires the project developer to pay
all costs for the construction of a new 6-inch sewer line. The Department of Public Works has reviewed the
Water and Sewer Study and determined that with incorporation of identified mitigation measures no new
significant impact would result from the implementation of the Proposed Project.
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of solid waste reduction goals?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Approved Project would generate 3,397 lbs/day or solid waste. Based on Table 15 below, the Proposed
Project would generate approximately 3,214 lbs/day of solid waste, which represents a net decrease of 183
lbs/day of solid waste. As such, the Proposed Project would be within the approved capacity of the Approved
Project. The Proposed Project would be required to comply with all local and State standards regulating the
production, disposal, recycling, and handling of solid waste (including AB341). The Proposed Project would
result in a less than significant impact and would not require the preparation of a subsequent EIR.
Table 15 Proposed Project Solid Waste Generation
Land Use
Solid Waste Generation
Factor
Project DU or square
footage
Solid Waste Generation
Ibslda
Office (commercial)
0.006 Ibs/sf/day
259,002 sf
1,554
Apartments (high-rise residential)
4 Ibs/du/day
415 du
1,660
Total Proposed Solid Waste Generation
3,214
Total Current Entitled Solid Waste Generation
(3,397)
Project Net Solid Waste Generation (Project — Current)
(183)
Source: CalRecycle, 2019.
e) Comply with federal, state, and local management and reduction statutes and regulations related
to solid waste?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
Assembly Bill 341 became effective in July 2012 requires that local jurisdictions divert at least 75 percent of
solid waste generated be source reduced, recycled, or composted by the year 2020. Assembly Bill 341 further
mandates commercial and multifamily recycling. In 2017, the City diverts 67 percent of its solid waste generated.
The City of Santa Ana implements various recycling programs and meets the State's mandated diversion goal
(City of Santa Ana 2020). Proposed Project would be consistent with AB 341. The Proposed Project would
have less than significant impacts and would not require the preparation of a subsequent EIR.
5.19.3 Adopted Mitigation Measures Applicable to the Proposed Project
The following mitigation measures have been carried through from the One Broadway Plaza EIR. These
mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the
mitigation measures from the Certified EIR are shown as for deleted text and bold for new,
inserted text.
Page 96 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
U-1 The project developer shall coordinate with SCE prior to construction to determine the exact
location of all underground and overhead electrical facilities or taking action which could
damage such facilities or interfere with their operations. The Contractor shall protect all
electrical facilities and associated structures to be left on the project site from damage.
U-2 All new electrical lines shall be placed underground as required by the City of Santa Ana.
U-3 The project developer shall coordinate with SCGC prior to construction to determine the
exact location of all underground natural gas facilities and take action to prevent damage to
these facilities or interference with their operations. The Contractor shall protect all natural
gas pipelines and associated structures to be left on the project site from damage.
U-4 The project developer shall coordinate with Adelphia (formerly Comcast) prior to
construction to determine the exact location of all underground cable facilities or taking action
which could damage such facilities or interfere with their operations. The Contractor shall
protect all existing cable lines and associated structures to be left on the project site from
damage.
U-5 The project developer shall coordinate with Pacific Bell prior to construction to determine the
exact location of all underground telephone facilities or taking action which could damage
such facilities or interfere with their operations. The Contractor shall protect all existing
telephone lines and associated structures to be left on the project site from damage.
U-6 Prior to the issuance of grading permits, the project developer shall demonstrate to the City
of Santa Ana that all construction related waste generated on site would be recycled wherever
feasible as the first choice of disposal method, leaving the option of landfill disposal as a last
alternative. The proposed commercial use shall incorporate facilities for collection and pick-
up of recyclable materials into the design of the project office building. The project developer
shall coordinate with City staff to develop appropriate recycling programs for this project.
U-7 The project developer shall coordinate with the Santa Ana Water Utility prior to construction
to determine the exact location of all existing underground water facilities and take action to
prevent damage to these facilities to be left on the project site or interference with their
operations. The project developer shall also pay their fair share amount for the necessary
facilities to accommodate project -related water supplies.
U-8 The project developer shall coordinate with CSDOC and the City of Santa Ana Public Works
Department prior to construction to determine the exact location of all underground sewer
facilities and take action to prevent damage to these facilities or interference with their
operations. The Contractor shall protect all sewer lines and associated structures that will be
left on the project site from damage.
Apri12020 Page 97
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
U-9 The project developer shall pay their fair share amount, as determined by the City of Santa
Ana, to construct the proposed storm drain system serving the project site to Broadway Street
in accordance with the City's Master Plan of Drainage.
U-10 The project developer shall pay all costs for the construction of a new 8-inch waterline and a
6-inch sewer to be constructed within Washington Avenue and 10th Street to replace these
lines abandoned in a portion of Sycamore Street.
5.20 WILDFIRE
5.20.1 Summary of Impacts Identified in the Program EIR
Wildfire was not analyzed as a topic in the prior One Broadway Plaza Certified EIR; however, it was addressed
as part of the Hazards and Hazardous Materials section and was scoped out in the Initial Study. The Initial
Study determined that the Project Site is located in an urban area. The Approved Project would not expose
people or structures to a significant risk of loss, injury or death involving wildland fires, including wildland fires
that occur on land adjacent to urbanized areas or where residences are intermixed with wildlands. The Initial
Study further determined that the Project Site is not subject to mudflows due to the flat topography.
5.20.2 Impacts Associated with the Proposed Project
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would
the Proposed Project:
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation
X
plan?
b) Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to,
X
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
c) Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
X
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
Page 98
PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
d) Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
X
post -fire slope instability, or drainage
changes?
The Project Site (and the City of Santa Ana) is not within or near a Very High Fire Hazard Severity Zone
according to CalFire. The Project Site is also not within or near in a State Responsibility Area (SRA).
Comments:
a) Substantially impair an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Initial Study for the Approved Project states that there are no designated emergency evacuation routes in
the City. As with the Approved Project, operation of the Proposed Project could interfere with response times
of emergency vehicles but after implementation of appropriate mitigation would assure that impacts would
remain less than significant. Incorporation of Mitigation Measures PS-1 through PS-9 would ensure that the
Proposed Project would result in a less than significant impact to police protection, and fire and emergency
services. Specifically, Mitigation Measures PS-8 would ensure that emergency vehicles receive green lights with
preemption detectors at identified intersections. Therefore, the Proposed Project would not substantially impact
an adopted emergency response plan or emergency evacuation plan. Therefore, the Proposed Project would
not create a new significant impact or a substantial increase in the severity of previously identified effects that
would require the preparation of a subsequent EIR.
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose
project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a
wildfire?
No Impact. The Proposed Project is located in an urban environment and is surrounded by existing
development. There are no wildland areas, nor wildland interface areas located in the vicinity. Consequently, no
wildland fires would affect, or be affected by implementation of the Proposed Project. No impact would occur
for the Proposed Project and no changes or new information would require preparation of a subsequent EIR.
Apri12020 Page 99
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may
result in temporary or ongoing impacts to the environment?
No Impact. The Proposed Project is located in an urban environment and is surrounded by existing
development. Installation or maintenance of associated infrastructures would not exacerbate fire risk or result
in temporary ongoing impacts to the environment as wildland nor wildland interface areas exist at or around
the Project Site area. No impact would occur for the Proposed Project and no changes or new information
would require preparation of a subsequent EIR.
d) Expose people or structures to significant risks, including downslope or downstream flooding or
landslides, as a result of runoff, post -fire slope instability, or drainage changes?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As discussed in the Certified EIR, the Project Site is flat and located in an urbanized area. The Project Site is
not subject to landslides or slope instability. The Project Site is not located in or adjacent to wildland area. As
with the Approved Project, adherence to appropriate mitigation would assure that impacts related to runoff
and drainage changes for the Proposed Project would remain less than significant. As documented in this
analysis, the Proposed Project would not result in new significant impacts or a substantial increase in the severity
of previously identified effects and is consistent with the Certified EIR and would not require the preparation
of a subsequent EIR.
5.20.3 Adopted Mitigation Measures Applicable to the Proposed Project
Refer to Mitigation Measure PS-1 through PS-9 under the Section 5.15, Public Services.
Page 100 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
5.21 MANDATORY FINDINGS OF SIGNIFICANCE
Less Than
Significant
Substantial
Impact/No
Substantial
Change in
New
Changes or
Change in
Circum-
Information
New
Project
stances
Showing New
Information
Requiring
Requiring
or Increased
Requiring
Major EIR
Major EIR
Significant
Preparation of
Environmental Issues
Revisions
Revisions
Effects
an EIR
No Impact
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below self-
sustaining levels, threaten to eliminate a
X
plant or animal community, substantially
reduce the number or restrict the range of a
rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? ("Cumulatively considerable"
means that the incremental effects of a
project are considerable when viewed in
X
connection with the effects of past projects,
the effects of other current projects, and the
effects of probable future projects.)
c) Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
X
indirectly?
Comments:
a) Does the project have the potential to substantially degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to
drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially
reduce the number or restrict the range of a rare or endangered plant or animal or eliminate
important examples of the major periods of California history or prehistory?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
The Project Site does not contain any significant biological resources. As demonstrated in this Addendum, the
Proposed Project would not result in new significant impacts to biological or cultural resources, nor would it
substantially increase the severity of impacts evaluated and determined in the Certified EIR. Because the
Proposed Project would not meet any of the criteria identified in Section 15162 of the State CEQA Guidelines
requiring preparation of a subsequent or supplemental EIR, an Addendum to the Certified EIR is the
appropriate document type for the Proposed Project.
Apri12020 Page 101
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
5. Environmental Analysis
b) Does the project have impacts that are individually limited, but cumulatively considerable?
("Cumulatively considerable" means that the incremental effects of a project are considerable
when viewed in connection with the effects of past projects, the effects of other current projects,
and the effects of probable future projects.)
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
With approval of the discretionary requests, the Proposed Project would be consistent with the amount of
development planned for the Project Site. Therefore, the Proposed Project will not result in any new
cumulatively considerable impacts or substantially increase the severity of the cumulative effects previously
disclosed in the Certified EIR. As demonstrated in this Addendum, the Proposed Project would not result in
new significant impacts, nor would it substantially increase the severity of impacts evaluated and determined in
the Certified EIR. Because the Proposed Project would not meet any of the criteria identified in Section 15162
of the State CEQA Guidelines requiring preparation of a subsequent or supplemental EIR, an Addendum to
the Certified EIR is the appropriate document type for the Proposed Project.
c) Does the project have environmental effects, which will cause substantial adverse effects on
human beings, either directly or indirectly?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR.
As demonstrated in this Addendum, the Proposed Project would not result in new significant impacts, nor
would it substantially increase the severity of impacts evaluated and determined in the Certified EIR. Because
the Proposed Project would not meet any of the criteria identified in Section 15162 of the State CEQA
Guidelines requiring preparation of a subsequent or supplemental EIR, an Addendum to the Certified EIR is
the appropriate document type for the Proposed Project.
Page 102 PlaceWorks
6. List of Preparers
6.1 CITY OF SANTA ANA
Planning and Building Agency, Planning Division
Vince C. Fregoso, AICP Planning Manager
Public Works Agency
Nabil Saba
Mir T. Fattahi, MsCE, P.E.
6.2 PLACEWORKS
William Halligan, Esq.
Mariana Zimmermann
Gina Froelich
Cary Nakama
Executive Director
Consultant Engineer
Managing Principal, Environmental Services
Associate
Senior Editor
Graphic Artist
Apri12020 Page 103
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
6. List of Preparers
Thi page intenlionalyleft blank.
Page 104 PlaceWorks
7. References
California Air Resources Board (CARB). 2010, August. Staff Report Proposed Regional Greenhouse Gas
Emission Reduction Targets for Automobiles and Light Trucks Pursuant to Senate Bill 375.
2017, November. California's 2017 Climate Change Scoping Plan: The Strategy for Achieving
California's 2030 Greenhouse Gas Target.
https://www.arb.ca.gov/cc/scopingplan/2030sp—pp—final.pdf
2018, February. Proposed Update to the SB 375 Greenhouse Gas Emission Reduction Targets.
https://www.arb.ca.gov/cc/sb375/sb375—target—update—final—staff report—feb2018.pdf.
California Department of Conservation (DOC). 1998, April 15. Earthquake Zones of Required Investigation
Orange Quadrangle.
2020, February 20 (accessed). Fault Activity Map of California (2010)
https://maps.conservation.ca.gov/cgs/fam/
California Department of Forestry & Fire Protection (CalFire). 2011, October. Very High Fire Hazard
Severity Zones in LRA. https://osftn.fire.ca.gov/media/6739/ffiszl—map3O.pdf.
California Department of Resources Recycling and Recovery (CalRecycle). 2019. Estimated Solid Waste
Generation Rates. https://www2.calrecycle.ca.gov/WasteCharacterizadon/General/Rates.
California Department of Toxic Substances Control (DTSC). 2020, February 26 (accessed). EnviroStor.
https://www.envirostor.dtsc.ca.gov/public/map/
Dolinka Group, LLC. 2014, February 27. Residential Development School Fee Justification Study. Santa Ana
Unified School District.
Orange County Treasurer -Tax Collector. 2019. Treasurer -Tax Collector.
http://tax.ocgov.com/tcweb/map--disdaimer—main.asp
Santa Ana, City of. 2020, March 2 (accessed). Santa Ana Recycles — You Make the Difference!
https://www.santa-ana.org/green/recychng-programs
2020, February 3. Santa Ana Register of Historic Properties. https://www.santa-
ana.org/sites/default/files/pb/documents/SA Register of Historic Properties 2.3.20.pdf
2019, July. City Budget Detail. https://www.Santa-ana.org/sites/default/files/finance/budget/2019-
2020/e-Budget%20Book_0.pdf
Apri12020 Page 105
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
7. References
2017, March 16. Final 2016 Air Quality Management Plan. http://www.aqmd.gov/docs/default-
source/ clean -air -plans / air -quality -management -plans /2016-air-quality-management-plan / final-2016-
aqmp/final2016agmp.pdPsfvrsn=l 5.
2013, February. Final 2012 Air Quality Management Plan. https://www.agmd.gov/home/air-
quality/clean-air-plans/air-quality-mgt-plan/ final-2012-air-quality-management-plan
1982, September 20 (adopted). City of Santa Ana General Plan.
Southern California Association of Governments (SCAG). 2016a, April. The 2016-2040 Regional
Transportation Plan/Sustainable Communities Strategy (RTP/SCS).
http://scagrtpscs.net/Documents/2016/final/f2Ol6RTPSCS.pdf
2016b. Demographics and Growth Forecast. 2016-2040 RTP/SCS Appendix.
http: / / scagrtpscs.net/Documents/2016/final/f2Ol 6RTPSCS_DemographicsGrowthForecast.pdf
State Water Resources Control Board (SWRCB). 2020, February 26 (accessed). GeoTracker.
http://geotracker.waterboards.ca.gov/.
US Environmental Protection Agency (USEPA). 2009, December. EPA: Greenhouse Gases Threaten Public
Health and the Environment: Science overwhelmingly shows greenhouse gas concentrations at
unprecedented levels due to human activity.
https:/ /archive.epa.gov/epapages/newsroom_archive/newsreleases/08dl l a451131bca58525768500
5bf252.html.
US Environmental Protection Agency (USEPA). 2019 (version). EJSCREEN.
https://ejscreen.epa.gov/mapper/.
U.S. Fish and Wildlife Service. 2020, February 21 (accessed). National Wetlands Inventory, Surface Waters
and Wetlands. https://www.fws.gov/wetlands/data/Mapper.html
Page 106 PlaceWorks
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Appendix Air Quality / Greenhouse Gas Memo
Apri12020
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Thi page intenlionalyleft blank.
PlaceWorks
OURBAN 260 E. Baker St. I Suite 200 1 Costa Mesa, CA 92626 1 (949) 660-1994
CROSS ROADS urbanxroads.com
April 16, 2020
Mr. Mike Harrah
Caribou Industries, Inc.
1103 N. Broadway
Santa Ana, CA 92701
SUBJECT: ONE BROADWAY PLAZA AIR QUALITY & GREENHOUSE GAS MEMORANDUM
Dear Mr. Mike Harrah:
Urban Crossroads, Inc. is pleased to provide the following Air Quality & Greenhouse Gas Memorandum
for One Broadway Plaza development which is located on the northeast corner of Broadway and 101i,
Street in the City of Santa Ana. The purpose of this work effort is to assess the potential changes in air
quality and greenhouse gas (GHG) emissions associated with the update to the uses proposed for the
Project. The Project consists of the development of 415 multifamily residential dwelling units in place
of 318,153 square feet of office use.
BACKGROUND
The Project is proposing to amend the General Plan Land Use Element to allow the development of
residential uses (at the density/intensity proposed) for the One Broadway Plaza District Center
(OBPDC) Specific Development District (SD) 75. Currently, SD75 allows for the development of a 37-
story tower with 518,000 square feet of office uses, a destination restaurant at the top two levels of
the tower, and residential uses are not currently permitted. The following assessment is in support of
the proposed addendum to the Environment Impact Report (EIR).
CURRENTLY APPROVED PROJECT
The previous Final Environmental Impact Report for One Way Broadway Plaza (FEIR) (August 2004) was
prepared by P&D Consultants and analyzed a 37-story building and surrounding rehabilitated
structures, which are broken down by use below in Table 1. The Project also includes an 8-level
freestanding parking structure with approximately 2,100 parking spaces (1).
13142-05 AQ & GHG Memo
O URBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 2 of 7
TABLE 1: CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USE STATISTICAL SUMMARY
Land Use
Square Feet'
Office Building
508,200
Rehabilitated Office
9,803
Retail
8,525
Formal Dining
15,915
Casual Dining
2,681
TOTAL
545,124
1 Source: Air Quality Assessment For: One Broadway Plaza, January 2002
CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USES OPERATIONAL AIR QUALITY EMISSIONS
The operational -source emissions for the currently approved land uses were reported in the FEIR and
are summarized on Table 2 (1). As shown on Table 2, operational -source emissions would exceed
applicable SCAQMD regional thresholds for emissions of NOx.
TABLE 2: CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USES OPERATIONAL EMISSIONS SUMMARY
Emissions (Ibs/day)'
VOC
NOx
CO
Sox
PM10
Total Maximum Daily Emissions
31.60
76.10
462.20
41.30
8.50
SCAQMD Regional Threshold
55
55
550
150
150
Threshold Exceeded?
NO
YES
NO
NO
NO
Ibs/day = Pounds Per Day
Source: Final Environmental Impact Report for One Broadway Plaza, August 2004.
1 The FEIR did not identify emissions from PM2.5.
CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USES GHG EMISSIONS
It should be noted that the FEIR did not quantify GHG emissions. As such, GHG emissions were
calculated employing the California Emissions Estimator ModelTM (CaIEEMod) version 2016.3.2. The
estimated GHG emissions for the currently approved land uses are summarized on Table 3. As shown
on Table 3, Currently Approved One Broadway Plaza land uses would generate a total of approximately
10,009.23 MTCO2e per year.
13142-05 AQ & GHG Memo
L, URBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 3 of 7
TABLE 3: CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USES GHG EMISSIONS
Emission Source
Emissions (MT/yr)
CO2
CH4
N20
Total CO2e
Area Source
0.01
4.00E-05
0.00
0.01
Energy Source
3,072.67
0.12
0.03
3,084.87
Mobile Sources
5,901.29
0.26
0.00
5,907.81
Waste
109.03
6.44
0.00
270.11
Water Usage
641.58
3.23
0.08
746.43
Total CO2e (All Sources)
10,009.23
MT/yr = Metric Tons Per Year
PROPOSED PROJECT
The Project is proposing to develop a mixed -use development with both residential and office uses at
One Broadway Plaza. The Project requires a General Plan Land Use Element amendment to permit
residential development within the OBPDC. The One Broadway Plaza building includes 518,000 square
feet of office uses. Approximately 60% (318,153 square feet) is proposed for a total of 415 apartment
units.
AIR QUALITY IMPACTS
PROPOSED PROJECT OPERATIONAL AIR QUALITY EMISSIONS
Operational -source air quality impacts were modeled employing the CalEEMod version 2016.3.2.
Maximum daily operational -source criteria pollutant emissions generated by operations of the
Proposed Project are summarized on Table 4. As indicated, air pollutant emissions generated by
operations of the Proposed Project would not exceed regional thresholds of significance established by
the SCAQMD for any criteria emissions.
13142-05 AQ & GHG Memo
L, URBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 4 of 7
TABLE 4: PROPOSED PROJECT OPERATIONAL EMISSIONS SUMMARY
Operational Activities -
Summer Scenario
Emissions (Ibs/day)
VOC
NOx
CO
Sox
PM10
PM2.5
Area Source
12.96
0.40
34.38
1.81E-03
0.19
0.19
Energy Source
0.34
2.99
2.02
0.02
0.23
0.23
Mobile Source
5.48
19.37
55.54
0.18
15.19
4.18
Total Maximum Daily Emissions
18.78
22.76
91.93
0.20
15.61
4.61
SCAQMD Regional Threshold
55
55
550
150
150
55
Threshold Exceeded?
NO
NO
NO
NO
NO
NO
Operational Activities -
Winter Scenario
Emissions (Ibs/day)
VOC
NOx
CO
Sox
PM20
PM2.5
Area Source
12.96
0.40
34.38
1.81E-03
0.19
0.19
Energy Source
0.34
2.99
2.02
0.02
0.23
0.23
Mobile Source
5.41
19.77
54.69
0.17
15.19
4.18
Total Maximum Daily Emissions
18.71
23.16
91.09
0.19
15.61
4.61
SCAQMD Regional Threshold
55
55
550
150
150
55
Threshold Exceeded?
NO
NO
NO
NO
NO
NO
GHG EMISSIONS
PROPOSED PROJECT GHG EMISSIONS
GHG emissions impacts were modeled employing the CalEEMod version 2016.3.2. As shown on Table
5, Proposed Project would generate a total of approximately 5,795.27 MTCO2e per year.
TABLE 5: PROPOSED PROJECT GHG EMISSIONS
Emission Source
Emissions (MT/yr)
CO2
CH4
N20
Total CO2e
Area Source
6.99
6.83E-03
0.00
7.17
Energy Source
2,278.04
0.08
0.03
2,287.63
Mobile Sources
2,759.07
0.13
0.00
2,762.31
Waste
87.72
5.18
0.00
217.32
Water Usage
447.46
2.26
0.06
520.84
Total CO2e (All Sources)
5,795.27
13142-05 AQ & GHG Memo
L, URBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 5 of 7
AIR QUALITY AND GHG EMISSIONS COMPARISON
Table 6 compares peak operational -source criteria pollutant emissions generated by Proposed Project
with peak operational -source criteria pollutant emissions generated by the Currently Approved One
Broadway Plaza land uses. As indicated at Table 6, the Proposed Project would result in a net decrease
in peak operational -source VOC, NOx, CO, and SOx emissions when compared to peak operational -
source criteria pollutant emissions generated by the Currently Approved One Broadway Plaza land
uses. It should be noted that Proposed Project would reduce NOx impacts to less than significant levels.
Additionally, the Proposed Project would not result in new or substantively different or substantively
increased operational -source air quality impacts than the emissions associated with the Currently
Approved One Broadway Plaza land uses.
TABLE 6: OPERATIONAL EMISSIONS COMPARISON
Operational Activities
Emissions (lbs/day)
VOC
NOx
CO
Sox
PM10
PM2.5
Proposed Project
18.78
23.16
91.93
0.20
15.61
4.61
Currently Approved One Broadway Plaza Land Uses
31.60
76.10
462.20
41.30
8.50
-
Variance (Proposed Project — Currently Approved)
-12.82
-52.94
370.27
-41.10
-7.11
N/A
GHG EMISSIONS COMPARISON
Table 7 compares GHG emissions of the Proposed Project with GHG emissions generated by the
Currently Approved One Broadway Plaza land uses. As indicated at Table 7, the Proposed Project would
result in a net decrease in GHG emissions (approximately 42 percent less). The Proposed Project would
therefore not result in new or substantively different or substantively increased GHG emissions
impacts than the emissions associated with the Currently Approved One Broadway Plaza land uses.
TABLE 7: GHG COMPARISON
Emission Source
Annual Emissions (MTCO2e)
Proposed Project
5,795.27
Currently Approved One Broadway Plaza Land Uses
10,009.23
Variance (Proposed Project — Currently Approved)
-4,213.96
CONCLUSIONS
Based on the analysis presented here, air pollutant emissions generated by Proposed Project would
not exceed applicable SCAQMD thresholds. Nor would the Proposed Project otherwise generate or
13142-05 AQ & GHG Memo
L�► URBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 6 of 7
result in air pollutant emissions or air pollutant emissions concentrations that would result in
potentially adverse impacts.
Moreover, in comparison to the emissions generated by the uses under the Currently Approved One
Broadway Plaza land uses, operational -source NOx impacts would be comparatively diminished under
the Proposed Project. No changed or new information has been identified to indicate that the potential
for the Proposed Project to result in impacts that would be substantively greater than or different from
those that would result from development of the Currently Approved One Broadway Plaza land uses.
If you have any questions, please contact me directly at (949) 336-5987.
Respectfully submitted,
URBAN CROSSROADS, INC.
FiIA�_ M_
Haseeb Qureshi,
Associate Principal
13142-05 AQ & GHG Memo
L�► uRBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 7 of 7
REFERENCES
1. P&D Consultants. Final Environmental Impact Report for One Broadway Plaza. 2004.
13142-05 AQ & GHG Memo
L�► URBAN
ATTACHMENT A
CALEEMOD EMISSIONS MODEL OUTPUTS
13142-05 AQ & GHG Memo
O URBAN
CaIEEMod Version: CalEEMod.2016.3.2 Page 1 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
One Broadway Plaza (Proposed Project)
Orange County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses
Size
Metric
Lot Acreage
Floor Surface Area
Population
General Office Building
190.05 +
1000sgft
; 0.00
190,047.00
i 0
•------------------------------_------------------------------_-----------------------------
Office Park 9.80
= - - ;-------------
1000sgft ; 0.00 9,803.00 i 0
+
•---g------------------------)--_------------------------------_-----------------------------
Hi h Turnover Sit Down Restaurant 2.68 +
= - - -;-------------
1000sgft ; 0.00 2,681.00 -+ 0
•---- --- - - - --y----------------_------------------------------_-
Qualit Restaurant 15.91 +
---------------------- - - - --- = --- ----;-------------- - - - - --
1000sgft ; 0.00 15,915.00 -+ 0
Apartments High Rise 415.00 +
--------------•----------------------------_------------------------------_----+---------------
Dwelling Unit ; 4.32 318,153.00 i 1187
•------------------------------_------------------------------_-----------------------------
--------------}------------------E---------------
Strip Mall
8.53
1000sgft
0.00
8,525.00
0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
CO2Intensity 702.44 CH4Intensity 0.029 N20Intensity 0.006
(lb/MWhr) (lb/MWhr) (lb/MWhr)
1.3 User Entered Comments & Non -Default Data
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
Project Characteristics -
Land Use - Total Lot Area = 4.32 ac
Construction Phase - Operational Run Only.
Off -road Equipment - Operational Run Only.
Trips and VMT - Operational Run Only.
Vehicle Trips - Trip Characteristics based on the One Broadway Plaze Trip Generation Evaluation by Urban Crossroads, Inc.
Woodstoves -
Area Coating -
Water And Wastewater -
Solid Waste -
Mobile Land Use Mitigation -
Area Mitigation -
Table Name
Column Name
Default Value
New Value
tblLandUse
Land UseSquareFeet
9,800.00
9,803.00
----------------------------_-----------------------------
tblLandUse
r-----------------------------t--------------------------
Land UseSquareFeet 1 2,680.00 2,681.00
----------------------------_-----------------------------r
tblLandUse
----------------------------- t--------------------------
Land UseSquareFeet 1 15,910.00 15,915.00
tblLandUse
Land UseSquareFeet 1 415,000.00 318,153.00
-----------------------------_-----------------------------r-----------------------------t--------------------------
tblLandUse
Land UseSquareFeet 1 8,530.00 8,525.00
-----------------------------
tblLandUse
------------------------------ ------------t--------------------------
LotAcreage } 4.36 0.00
-----------------------------
tblLandUse
------------------------------ t-----------------------------t--------------------------
LotAcreage 0.22 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.06 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.37 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 6.69 4.32
-----------------------------_----------------------------
tblLandUse
' ---------------------------------------
LotAcreage } 0.20 0.00
----------------------------- _------------------------------
tblOffRoadEquipment
r-----------------------------t--------------------------
OffRoadEquipmentUnitAmount 1 1.00 0.00
-----------------------------
tblOffRoad Equipment
------------------------------t------------------------------ --------------------------
OffRoadEquipmentUnitAmount 3.00 0.00
CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
tblOffRoadEquipment
OffRoadEquipmentUnitAmount
2.00
0.00
-----------------------------
tblVehideTrips
Y----------------------------
DV_TP
�-----------------------------
} 20.00
--------------------------
0.00
tblVehideTrips
DV_TP
} 18.00
0.00
tblVehideTrips
DV_TP
} 40.00
0.00
tblVehideTrips
PB_TP
} 15.00
34.00
tblVehideTrips
PR_TP
} 37.00
57.00
tblVehideTrips
PR_TP
} 38.00
56.00
tblVehideTrips
PR_TP
} 45.00
66.00
tblVehideTrips
ST_TR
} 4.98
2.16
tblVehideTrips
ST_TR
} 2.46
4.31
tblVehideTrips
ST_TR
} 158.37
122.40
tblVehideTrips
ST_TR
} 1.64
2.21
tblVehideTrips
ST_TR
} 94.36
90.04
tblVehideTrips
ST_TR
} 42.04
46.12
tblVehideTrips
SU_TR
} 3.65
2.16
tblVehideTrips
SU_TR
} 1.05
4.31
tblVehideTrips
SU_TR
} 131.84
142.64
tblVehideTrips
SU_TR
} 0.76
0.70
tblVehideTrips
SU_TR
} 72.16
71.97
tblVehideTrips
SU_TR
} 20.43
21.10
tblVehideTrips
WD_TR
} 4.20
2.16
tblVehideTrips
WD_TR
} 11.03
4.31
tblVehideTrips
WD_TR
} 127.15
112.64
tblVehideTrips
WD_TR
} 11.42
9.79
tblVehideTrips
WD_TR
} 89.95
83.82
--------------------------
tblVehideTrips
------------------------------
WD_TR
------------------------------
44.32
--------------------------
37.77
CaIEEMod Version: CalEEMod.2016.3.2 Page 4 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
lb/day
lb/day
2020 •i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000
Maximum
11
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0. 0000
0.0000
0.0000
0.0000
0. 0000
0.0000
Mitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
lb/day
lb/day
2020 •i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Maximum
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 5 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Reduction
CaIEEMod Version: CalEEMod.2016.3.2 Page 6 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
2.2 Overall Operational
Unmitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
PM10
PM10
Total
PM2.5
PM2.5
I
Category
lb/day
lb/day
Area •i 121.7085 9.0081 245.4242 0.5402 31.8901 31.8901 31.8901 31.8901 •3,887.2711i 7,531.698 :11,418.970i 11.6528 0.2638 :11,788.915
i i � � i
9 i 0 i 5
Energy •i 0.3377 i 2.9937 2.0185 i 0.0184 0.2333 i 0.2333 0.2333 0.2333 i 3,684.206 3,684.206 i 0.0706 0.0675 3,706.099
4 i 4 i i i 8
Mobile •1 6.1611 i 23.6790 � 74.1514 i 0.2580 � 21.8707 � 0.2543 i 22.1251 � 5.8484 i 0.2386 6.0870 i 26,157.98 26,157.98 i 1.1248 26,186.10
40 40 i 48
Total
128.2073
321.5940
0.8166
21.8707
32.3778
54.2485
5.8484
32.3621
38.2104
3,887.271
37,373.88
41,261.16
12.8483
0.3314
11
708
1
93
04
j
141,681.12
01
Mitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Category
lb/day
lb/day
Area •i 12.9636 i 0.3975 34.3752 i 1.8100e- 0.1890 i 0.1890 0.1890 0.1890 0.0000 i 61.6989 61.6989 i 0.0603 0.0000 i 63.2051
003 i i i i i ■ i i i
a
----- ---- •r------------- ------- ------- ------- ------- ------- ----------------------_--------------J-------J-------�-------*-------
Energy •i 0.3377 i 2.9937 � 2.0185 i 0.0184 � � 0.2333 i 0.2333 � i 0.2333 � 0.2333 � i 3,684.206 3,684.206 i 0.0706 0.0675 i 3,706.099
'�
i i i i i i i i ■ 4 i 4 i i i 8
Mobile •i 5.4822 i 19.3734 55.5377 i 0.1809 15.0033 0.1817 i 15.1851 4.0120 i 0.1704 4.1824 18,352.78 18,352.78 i 0.8334 18,373.62
Total
18.7835
22.7647
91.9313
0.2012
15.0033
0.6040
15.6074
4.0120
0.5927
4.6047
0.0000
22,098.69
22,098.69
0.9642
0.0675
22,142.92
11
50
50
87
CaIEEMod Version: CalEEMod.2016.3.2 Page 7 of 17
One Broadway Plaza (Proposed Project) - Orange County, Summer
Date: 4/16/2020 1:19 PM
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
85.35
36.20
71.41
75.37
31.40
98.13
71.23
31.40
98.17
87.95
100.00
40.87
46.44
92.50
79.62
46.88
Reduction
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 •Demolition •Demolition :1/28/2020 2/24/2020 5: 20-
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural
Coating — sgft)
OffRoad Equipment
Phase Name I Offroad Equipment Type I Amount I Usage Hours I Horse Power I Load Factor
Demolition
'Concrete/Industrial Saws
; 0;
i
8.00i 81 : 0.73
�- - - - -
i
--------------------------------------
Demolition
+Excavators
; 0
8.001 158, 0.38
----------------------------
--------------------------*------------------------------r-------------
-------------
Demolition
•Rubber Tired Dozers
0
8.00: 247: 0.40
Trips and VMT
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
I Hauling Trip
Number
I Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
I Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix HDT Mix HHDT
CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
3.1 Mitigation Measures Construction
3.2 Demolition - 2020
Unmitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
Off -Road •i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
=00000
Unmitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
Hauling �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 � i 0.0000 0.0000 0.0000 i i 0.0000
Vendor �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000
%------------------------------------------'-------------------------------------------'---------------
Worker �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 � i 0.0000 0.0000 0.0000 i i 0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 9 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
3.2 Demolition - 2020
Mitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 1 i 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
Category
lb/day
lb/day
I I I I I I I I I
Hauling •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 1 1 0.0000 I 1 0.0000 1 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I 1 I I
Vendor •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
1 1 I
• 1
1 1
I I I 1 1 I I I
Worker •1 0.0000 I 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 1 1 0.0000 I 1 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.0 Operational Detail - Mobile
CaIEEMod Version: CalEEMod.2016.3.2 Page 10 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
4.1 Mitigation Measures Mobile
Increase Density
Increase Diversity
Improve Destination Accessibility
Improve Pedestrian Network
ROG
NOx
CO
I S02
I Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
1777Total
CO2
CH4
I N20
I CO2e
Category
lb/day
lb/day
Mitigated
•i 5.4822 i 19.3734 i 55.5377 0.1809 i 15.0033 0.1817
15.1851
i 4.0120
0.1704 4.1824
18,352.78 18,352.78 0.8334
i i 18,373.62
Unmitigated
6.1611 23.6790 74.1514 0.2580 21.8707 0.2543
- 22.1251
5.8484
0.2386 6.0870
26,157.98 26,157.98 - 1.1248
26,186.10
40 40
48
4.2 Trip Summary Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
Apartments High Rise ; 896.40 896.40 896.40 3,063,135 2,101,311
...................................... ------------T-----------Y------------------------:--------------------------
.------------
General Office Building ; 819.10 ; 819.10 819.10 2,638,707 1,810,153
............................ ...... ----- -------,:------------------------:------------------------
;-----------T
High Turnover (Sit Down Restaurant) ; 301.88 , 328.03 382.28 584,717 401,116
................................................... ---------- ----------- ---------------------- ----------------------- -r
Office Park 95.94 , 21.66---T6:86----y------------------------- 168,278
.... ........� ---_ ----
Quality Restaurant ; 1,333.58 1,432.54 1145.04 2,470,857 1,695,008
......................................---------------------------- -----------------------:------------------------
Strip Mall ; 322.18 ; 393.40 179.98 714,239 489,968
Total 3,769.07
3,891.13
3,429.66
9,716,959
6,665,834
CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
4.3 Trip Type Information
Miles
Trip %
Trip Purpose %
Land Use
H-W or C-W
H-S or C-C
H-O or C-NW
H-W or C W
H-S or C-C
H-O or C-NW
Primary
Diverted
Pass -by
Apartments High Rise 14.70
5.90
8.70
40.20
1 19.20
40.60
86
11
3
........................------------------
1
--------
---- -------------
General Office Building 16.60
8.40
6.90
33.00
48.00
19.00
77
19
4
.......................• - - - - - - - - - - - - - - - - - - - - T _ _ _ _ _ _ _ _ _ _
High Turnover (Sit Down ; 16.60 8.40 6.90
- - - - - - - _ --_
8.50
_ _ _ _ _ _ _ _
1 72.50
T _ _ _ _ _ _ _ _ _ _ _
19.00
_ _ _ _ _ _ _ _ _ _
57
_ _ _ _ _ _ _ _ _ _ _ _ _
0
_ _ _ _ _ _ _ _ _ _ _ _ _
43
.......:......r........6---------- ------- T --
? I
--------
---- -------------
Office Park 16.60
8.40
6.90
33.00
48.00
19.00
82
15
3
QRestaurant 16.60 8.40 6.90 Y uality
12.00
1 69.00
19.00
56
0
44
Strip Mall 16.60
8.40
6.90
16.60
64.40
19.00
66
0
34
4.4 Fleet Mix
Land Use
I LDA
I LDT1
I LDT2
I MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
Apartments High Rise
0.555968} 0.043848;
0.210359;
0.116378;
0.016765;
0.005795;
0.025008;
0.016160;
0.001677;
0.001586;
0.004867;
0.000586-
0.001002
r
General Office Building
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
. . . . . . . . . . . . . . . . 4 . . . . . . . .;....------------ '................ '................ '................ '................ '................ '................ '................ '................ '................ '................4 ---------
High Turnover (Sit Down
0.5559681 0.043848:
0.210359:
0.116378:
0.016765:
0.005795:
0.025008:
0.016160:
0.001677:
0.001586:
0.004867:
0.000586:
0.001002
Restaurant)
....................... f------- .*-------T-------T-------T-------T-------T-------T-------T-------T-------T-------T-------
--------
Office Park
0.555968� 0.043848�
0.210359�
0.116378�
0.016765�
0.005795�
0.025008�
0.016160�
0.001677.
0.001586�
0.0048671
0.000586
0.001002
-----------------------_-------- ---------------
Quality Restaurant
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
Strip Mall
0.555968. 0.043848'
0.210359'
0.116378'
0.016765'
0.005795'
0.025008'
0.016160'
0.001677'
0.001586'
0.004867'
0.000586'
0.001002
5.0 Energy Detail
Historical Energy Use: N
5.1 Mitigation Measures Energy
CaIEEMod Version: CalEEMod.2016.3.2 Page 12 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
ROG
NOx
I CO
I S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
I N20
CO2e
Category
lb/day
lb/day
NaturalGas •i 0.3377 i 2.9937 i 2.0185 i 0.0184 i i 0.2333
i 0.2333
i i 0.2333 0.2333
3,684.206 � 3,684.206 0.0706 0.0675
1 3,706.099
Mitigated ;i
, i 4 4
i 8
NaturalGas
0.3377 2.9937 2.0185 0.0184 0.2333
0.2333
0.2333 0.2333
3,684.206 • 3,684.206 • 0.0706 - 0.0675
• 3,706.099
Unmitigated
4 4
8
CaIEEMod Version: CalEEMod.2016.3.2 Page 13 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
lb/day
lb/day
Apartments High
i 12992.9 •1 0.1401 1.1974 0.5095 7.6400e- 0.0968 i 0.0968 0.0968 0.0968 1 1,528.572 1,528.572 0.0293 0.0280 1,537.656
Rise
'1 1 I 1 003 1 1 I I 1 . 1 4 1 4 1 1 I 0
1
---------- _
1 ; 1 I I I I I I 1 , I 1 1 1
1------------------------------------------�-------�--------------------1-------�-------�--------------
r------71------- 1 1 1 1 1 1 1 1 , � 1 1 1 1 T
General Office
4758.99 .1 0.0513 1 0.4666 1 0.3919 1 2.8000e- 1 1 0.0355 1 0.0355 1 1 0.0355 0.0355 1 559.8806 1 559.8806 1 0.0107 1 0.0103 i 563.2077
Building
1 1 1 003
-----------1
'1 �--------I--------I--------A--------I------- �------- -I ------- -I ---------------• 1 -I--------I------- -A-------1
r------71-------1 1 1 1 1 1 1 1 , �-------I-------1 1 1 T'------
High Turnover (Sit
1904.76 •1 0.0205 1 0.1867 1 0.1569 1 1.1200e- 1 1 0.0142 1 0.0142 1 1 0.0142 0.0142 1 224.0893 1 224.0893 1 4.3000e- 1 4.1100e- i 225.4209
Down Restaurant)
1 ; 1 I 1 003 I I I I I . I I 003 1 003 1
--- --------1
'1------------------------------------------�-------�---------------• 1 �-------�--------------1
------
1
Office Park
305.37 3.2900e- 0.0299 0.0252 1.8000e- 2.2800e- 2.2800e- 2.2800e- 2.2800e- 35.9259 35.9259 6.9000e- 6.6000e- i 36.1394
1 003 1 1 1 004 1 1 003 1 003 1 1 003 003 . 1 1 1 004 1 004 1
---------- -r------71-------1
j i 1 I I I I I I I , 1 I I I 1
:----------------------------------------------------------------. 1---------------------1
1 1 1 1 1 1 1 , �-------I-------1 1 1 T'------
Quality
11307.1 •1 0.1219 1 1.1085 1 0.9312 1 6.6500e- 1 1 0.0843 1 0.0843 1 1 0.0843 0.0843 11,330.24211,330.2421 0.0255 1 0.0244 11,338.147
'
Restaurant
; 1 I I 003 I I I I I . 1 6 1 6 1 1 I 6
1
--------- --r------71-------1
Strip Mall
1 ; I I I I I I I I , I I I 1
1---------A--------A--------A--------A--------A--------A--------A--------------- ------1-------------------------------
1 1 1 1 1 1 1 � � 1 1 1 1 T""---
46.7123 5.000Oe- 4.5800e- 3.8500e- 3.000Oe- 3.5000e- 3.5000e- 3.5000e- 3.5000e- 1 5.4956 5.4956 1.1000e- 1.000Oe- 5.5282
.1 1 1 1 1 1 1 1 1 1 1 1
1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 . 1 1 1 004 1 004 1
t
0.3377
2.9938
2.0185
0.0184
0.2333
0.2333
0.2333
0.2333
3,684.206
3,684.206
0.0706
0.0675
3,706.099
4
4
8
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
5.2 Energy by Land Use - NaturalGas
Mitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
Bio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
JPM2.5Total
INBio-CO2
I
Land Use
kBTU/yr
lb/day
lb/day
Apartments High
12.9929 •i 0.1401 i 1.1974 0.5095 7.6400e- 0.0968 i 0.0968 0.0968 0.0968 i 1,528.572 1,528.572 i 0.0293 i 0.0280 1,537.656
Rise
003 4 4 i 0
--------
General Office
------- J-------'------- - J--------A------- - J------- - J------- '------- ----- -- ------------- -A - - - - - - - - J------- - J- - - - - --
i 4.75899 -1 0.0513 i 0.4666 0.3919 2.8000e- i 0.0355 i 0.0355 0.0355 0.0355 i 559.8806 559.8806 i 0.0107 i 0.0103 i 563.2077
Building
003
High Turnover (Sit
1.90476 •i 0.0205 i 0.1867 0.1569 1.1200e- i 0.0142 i 0.0142 0.0142 0.0142 i 224.0893 224.0893 i 4.3000e- i 4.1100e- 1 225.4209
Down Restaurant)
i 003 i 003 003 i
----------
Office Park
--------------'-----------------------------------'-------- -------------------------------
0.30537 •1 3.2900e- i 0.0299 0.0252 1.8000e- i 2.2800e- i 2.2800e- 2.2800e- 2.2800e- i 35.9259 35.9259 i 6.9000e- i 6.6000e- 1:36.1394
i '� 003 004 003 003 003 003 004 004
Quality
.� i i i i i i
�� J------- �-------'------- �------- J------- �------- �------- '------- --------� -A ------- �------- �------- i
i 11.3071 i 0.1219 i 1.1085 � 0.9312 � 6.6500e- i � 0.0843 i 0.0843 � � 0.0843 0.0843 i 1,330.242 � 1,330.242 i 0.0255 i 0.0244 i 1,338.147
Restaurant
003 6 6 i 6
----------
Strip Mall
- J-------- -------- -------- J-------- -------- J--------------'--------------- -I-------- J-------- J-------
0.0467123•i 5.000Oe- i 4.5800e- 3.8500e- 3.000Oe- i 3.5000e- i 3.5000e- 3.5000e- 3.5000e- i 5.4956 5.4956 i 1.1000e- i 1.0000e- i 5.5282
004 003 003 005 004 004 004 004 i i � i i i � � � i i � 004 004
Total
0.3377
2.9938
2.0185
0.0184
0.2333
0.2333
0.2333
0.277
3,684.206
3,684.206
0.0706
0.0675
3,706.099
4
4
8
6.0 Area Detail
6.1 Mitigation Measures Area
No Hearths Installed
CaIEEMod Version: CalEEMod.2016.3.2 Page 15 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
ROG
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
Category
lb/day
lb/day
Mitigated •i 12.9636 i 0.3975
i 34.3752 i 1.8100e-
i i 0.1890
i 0.1890
0.1890
0.1890 0.0000 i 61.6989 61.6989 i 0.0603 0.0000
63.2051
003
Unmitigated •• 121.7085 9.0081
245.4242 0.5402
31.8901
31.8901
31.8901
31.8901 •3,887.2711- 7,531.698 •11,418.970- 11.6528 0.2638
•11,788.915
9 0
5
6.2 Area by SubCategory
Unmitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Subcategory
lb/day
lb/day
Architectural 1 1.1219 0.0000 i 0.0000 0.0000 0.0000 � i � 0.0000 0.0000
Coating
Consumer �� 10.7935 0.0000 i 0.0000 0.0000 0.0000 � i � 0.0000 0.0000
Products
Hearth •i 108.7449 i 8.6106 211.0490 i 0.5384 i 31.7012 i 31.7012 i 31.7012 31.7012:3,887.271117,470.000:11,357.271i 11.5926 0.2638 i11,725.710
0 1 i 4
Landscaping •i 1.0482 i 0.3975 34.3752 i 1.8100e- 0.1890 i 0.1890 0.1890 0.1890 61.6989 61.6989 i 0.0603 63.2051
003
Total
121.7085
9.0081
245.4242
0.5402
31.8901
31.8901
31.8901
31.8901
3,887.271
7,531.698
11,418.97
11.6528
0.2638
11,788.91
1
9
00
1
1 55
CaIEEMod Version: CalEEMod.2016.3.2 Page 16 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
6.2 Area by SubCategory
Mitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Subcategory
lb/day
lb/day
Architectural •i 1.1219 i � i i � 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000
Coating
Consumer •i 10.7935 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000
Products
Hearth •i 0.0000 i 0.0000 0.0000 i 0.0000 i � 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 � 0.0000 1 0.0000
----------- -i----------------------------------------------------------- - - - --- -- + i----------------------------*
Landscaping •i 1.0482 i 0.3975 � 34.3752 i 1.8100e- i � 0.1890 i 0.1890 � i 0.1890 0.1890 i 61.6989 � 61.6989 i 0.0603 � � 63.2051
003
Total
12.9636
0.3975
34.3752
1.8100e-
0.1890
0.1890
0.1890
61.6989
61.6989
0.0603
0.0000
63.2051
003
F-777000
7.0 Water Detail
7.1 Mitigation Measures Water
8.0 Waste Detail
8.1 Mitigation Measures Waste
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
CaIEEMod Version: CalEEMod.2016.3.2 Page 17 of 17 Date: 4/16/2020 1:19 PM
One Broadway Plaza (Proposed Project) - Orange County, Summer
Fire Pumos and Emeraencv Generators
IEquipment Type I Number I Hours/Day I Hours/Year I Horse Power I Load Factor I Fuel Type I
Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type
User Defined Equipment
Equipment Type Number
11.0 Vegetation
CaIEEMod Version: CalEEMod.2016.3.2 Page 1 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
One Broadway Plaza (Proposed Project)
Orange County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses
Size
Metric
Lot Acreage
Floor Surface Area
Population
General Office Building
190.05 +
1000sgft
; 0.00
190,047.00
i 0
•------------------------------_------------------------------_-----------------------------
Office Park 9.80
= - - ;-------------
1000sgft ; 0.00 9,803.00 i 0
+
•---g------------------------)--_------------------------------_-----------------------------
Hi h Turnover Sit Down Restaurant 2.68 +
= - - -;-------------
1000sgft ; 0.00 2,681.00 -+ 0
•---- --- - - - --y----------------_------------------------------_-
Qualit Restaurant 15.91 +
---------------------- - - - --- = --- ----;-------------- - - - - --
1000sgft ; 0.00 15,915.00 -+ 0
Apartments High Rise 415.00 +
--------------•----------------------------_------------------------------_----+---------------
Dwelling Unit ; 4.32 318,153.00 i 1187
•------------------------------_------------------------------_-----------------------------
--------------}------------------E---------------
Strip Mall
8.53
1000sgft
0.00
8,525.00
0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
CO2Intensity 702.44 CH4Intensity 0.029 N20Intensity 0.006
(lb/MWhr) (lb/MWhr) (lb/MWhr)
1.3 User Entered Comments & Non -Default Data
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
Project Characteristics -
Land Use - Total Lot Area = 4.32 ac
Construction Phase - Operational Run Only.
Off -road Equipment - Operational Run Only.
Trips and VMT - Operational Run Only.
Vehicle Trips - Trip Characteristics based on the One Broadway Plaze Trip Generation Evaluation by Urban Crossroads, Inc.
Woodstoves -
Area Coating -
Water And Wastewater -
Solid Waste -
Mobile Land Use Mitigation -
Area Mitigation -
Table Name
Column Name
Default Value
New Value
tblLandUse
Land UseSquareFeet
9,800.00
9,803.00
----------------------------_-----------------------------
tblLandUse
r-----------------------------t--------------------------
Land UseSquareFeet 1 2,680.00 2,681.00
----------------------------_-----------------------------r
tblLandUse
----------------------------- t--------------------------
Land UseSquareFeet 1 15,910.00 15,915.00
tblLandUse
Land UseSquareFeet 1 415,000.00 318,153.00
-----------------------------_-----------------------------r-----------------------------t--------------------------
tblLandUse
Land UseSquareFeet 1 8,530.00 8,525.00
-----------------------------
tblLandUse
------------------------------ ------------t--------------------------
LotAcreage } 4.36 0.00
-----------------------------
tblLandUse
------------------------------ t-----------------------------t--------------------------
LotAcreage 0.22 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.06 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.37 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 6.69 4.32
-----------------------------_----------------------------
tblLandUse
' ---------------------------------------
LotAcreage } 0.20 0.00
----------------------------- _------------------------------
tblOffRoadEquipment
r-----------------------------t--------------------------
OffRoadEquipmentUnitAmount 1 1.00 0.00
-----------------------------
tblOffRoad Equipment
------------------------------t------------------------------ --------------------------
OffRoadEquipmentUnitAmount 3.00 0.00
CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
tblOffRoadEquipment
OffRoadEquipmentUnitAmount
2.00
0.00
-----------------------------
tblVehideTrips
Y----------------------------
DV_TP
�-----------------------------
} 20.00
--------------------------
0.00
tblVehideTrips
DV_TP
} 18.00
0.00
tblVehideTrips
DV_TP
} 40.00
0.00
tblVehideTrips
PB_TP
} 15.00
34.00
tblVehideTrips
PR_TP
} 37.00
57.00
tblVehideTrips
PR_TP
} 38.00
56.00
tblVehideTrips
PR_TP
} 45.00
66.00
tblVehideTrips
ST_TR
} 4.98
2.16
tblVehideTrips
ST_TR
} 2.46
4.31
tblVehideTrips
ST_TR
} 158.37
122.40
tblVehideTrips
ST_TR
} 1.64
2.21
tblVehideTrips
ST_TR
} 94.36
90.04
tblVehideTrips
ST_TR
} 42.04
46.12
tblVehideTrips
SU_TR
} 3.65
2.16
tblVehideTrips
SU_TR
} 1.05
4.31
tblVehideTrips
SU_TR
} 131.84
142.64
tblVehideTrips
SU_TR
} 0.76
0.70
tblVehideTrips
SU_TR
} 72.16
71.97
tblVehideTrips
SU_TR
} 20.43
21.10
tblVehideTrips
WD_TR
} 4.20
2.16
tblVehideTrips
WD_TR
} 11.03
4.31
tblVehideTrips
WD_TR
} 127.15
112.64
tblVehideTrips
WD_TR
} 11.42
9.79
tblVehideTrips
WD_TR
} 89.95
83.82
--------------------------
tblVehideTrips
------------------------------
WD_TR
------------------------------
44.32
--------------------------
37.77
CaIEEMod Version: CalEEMod.2016.3.2 Page 4 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
lb/day
lb/day
2020 •i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000
Maximum
11
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0. 0000
0.0000
0.0000
0.0000
0. 0000
0.0000
Mitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
lb/day
lb/day
2020 •i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Maximum
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 5 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Reduction
CaIEEMod Version: CalEEMod.2016.3.2 Page 6 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
2.2 Overall Operational
Unmitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
PM10
PM10
Total
PM2.5
PM2.5
Total
I
Category
lb/day
lb/day
Area •i 121.7085 9.0081 245.4242 0.5402 31.8901 31.8901 31.8901 31.8901 •3,887.2711i 7,531.698 :11,418.970i 11.6528 0.2638 :11,788.915
i i � � i
9 i 0 i 5
Energy •i 0.3377 i 2.9937 2.0185 i 0.0184 0.2333 i 0.2333 0.2333 0.2333 i 3,684.206 3,684.206 i 0.0706 0.0675 3,706.099
4 i 4 i i i 8
Mobile •1 6.0732 i 24.3217 71.7076 i 0.2463 21.8707 0.2557 i 22.1264 5.8484 i 0.2398 6.0882 i 24,981.74 24,981.74 i 1.1250 25,009.87
•� 26
i 71 i 71 � i
� � � � i i i � � i
Total
128.1194
319.1503
0.8049
21.8707
32.3791
54.2498
5.8484
32.3633
38.2117
3,887.271
36,197.65
12.8485
0.3314
40,504.88
11
[=3235
1
24
1700784.92
35
1
78
1
Mitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Category
lb/day
lb/day
Area •i 12.9636 i 0.3975 34.3752 i 1.8100e- 0.1890 i 0.1890 0.1890 0.1890 0.0000 i 61.6989 61.6989 i 0.0603 0.0000 i 63.2051
003 i i i i i ■ i i i
Energy •i 0.3377 i 2.9937 2.0185 i 0.0184 0.2333 i 0.2333 0.2333 0.2333 3,684.206 3,684.206 i 0.0706 0.0675 i 3,706.099
'�
i i i i i i i i ■ 4 i 4 i i 8
1
-----------%i------- J------- J------- J------- J------- J------- J------- J------- J---------------+-------i-------J-------�-------�-------*-------
Mobile 5.4083 i 19.7703 54.6927 i 0.1727 15.0033 0.1831 i 15.1864 4.0120 i 0.1717 4.1837 � 17,517.96 17,517.96 i 0.8411 17,538.98
i 20 20 i 92
■
Total
18.7096
23.1616
91.0863
0.1929
15.0033
0.6054
15.6087
4.0120
0.5940
4.6060
0.0000
21,263.86
21,263.86
0.9720
0.0675
21,308.29
11
73
73
40
CaIEEMod Version: CalEEMod.2016.3.2 Page 7 of 17
One Broadway Plaza (Proposed Project) - Orange County, Winter
Date: 4/16/2020 1:17 PM
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
85.40
36.24
71.46
76.04
31.40
98.13
71.23
31.40
98.16
87.95
100.00
41.26
46.95
92.44
79.62
47.39
Reduction
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 •Demolition •Demolition :1/28/2020 2/24/2020 5: 20-
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural
Coating — sgft)
OffRoad Equipment
Phase Name I Offroad Equipment Type I Amount I Usage Hours I Horse Power I Load Factor
Demolition
'Concrete/Industrial Saws
; 0;
i
8.00i 81 : 0.73
�- - - - -
i
--------------------------------------
Demolition
+Excavators
; 0
8.001 158, 0.38
----------------------------
--------------------------*------------------------------r-------------
-------------
Demolition
•Rubber Tired Dozers
0
8.00: 247: 0.40
Trips and VMT
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
I Hauling Trip
Number
I Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
I Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix HDT Mix HHDT
CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
3.1 Mitigation Measures Construction
3.2 Demolition - 2020
Unmitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
Off -Road •i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
=00000
Unmitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
Hauling �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 � i 0.0000 0.0000 0.0000 i i 0.0000
Vendor �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000
Worker �� 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 � i 0.0000 0.0000 0.0000 i i 0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 9 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
3.2 Demolition - 2020
Mitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
lb/day
lb/day
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 1 i 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
Category
lb/day
lb/day
I I I I I I I I I
Hauling •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 1 1 0.0000 I 1 0.0000 1 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I 1 I I
Vendor •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
1 1 I
• 1
1 1
I I I 1 1 I I I
Worker •1 0.0000 I 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 1 1 0.0000 I 1 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.0 Operational Detail - Mobile
CaIEEMod Version: CalEEMod.2016.3.2 Page 10 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
4.1 Mitigation Measures Mobile
Increase Density
Increase Diversity
Improve Destination Accessibility
Improve Pedestrian Network
ROG
NOx
CO
I S02
I Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
1777Total
CO2
CH4
I N20
I CO2e
Category
lb/day
lb/day
Mitigated
•i 5.4083 i 19.7703 i 54.6927 0.1727 i 15.0033 0.1831
15.1864
i 4.0120
0.1717
4.1837
17,517.96 17,517.96 0.8411
i i 17,538.98
Unmitigated
6.0732 24.3217 71.7076 0.2463 21.8707 0.2557
- 22.1264
5.8484
0.2398
6.0882
24,981.74 24,981.74 1.1250
25,009.87
71 71
26
4.2 Trip Summary Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
Apartments High Rise ; 896.40 896.40 896.40 3,063,135 2,101,311
...................................... ------------T-----------Y------------------------:--------------------------
.------------
General Office Building ; 819.10 ; 819.10 819.10 2,638,707 1,810,153
............................ ...... ----- -------,:------------------------:------------------------
;-----------T
High Turnover (Sit Down Restaurant) ; 301.88 , 328.03 382.28 584,717 401,116
................................................... ---------- ----------- ---------------------- ----------------------- -r
Office Park ........� ---_ ---- 95.94 , 21.66---T6:86----y------------------------- 168,278
....
Quality Restaurant ; 1,333.58 1,432.54 1145.04 2,470,857 1,695,008
......................................---------------------------- -----------------------:------------------------
Strip Mall ; 322.18 ; 393.40 179.98 714,239 489,968
Total 3,769.07
3,891.13
3,429.66
9,716,959
6,665,834
CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
4.3 Trip Type Information
Miles
Trip %
Trip Purpose %
Land Use
H-W or C-W
H-S or C-C
H-O or C-NW
H-W or C W
H-S or C-C
H-O or C-NW
Primary
Diverted
Pass -by
Apartments High Rise 14.70
5.90
8.70
40.20
1 19.20
40.60
86
11
3
........................------------------
1
--------
---- -------------
General Office Building 16.60
8.40
6.90
33.00
48.00
19.00
77
19
4
.......................• - - - - - - - - - - - - - - - - - - - - T _ _ _ _ _ _ _ _ _ _
High Turnover (Sit Down ; 16.60 8.40 6.90
- - - - - - - _ --_
8.50
_ _ _ _ _ _ _ _
1 72.50
T _ _ _ _ _ _ _ _ _ _ _
19.00
_ _ _ _ _ _ _ _ _ _
57
_ _ _ _ _ _ _ _ _ _ _ _ _
0
_ _ _ _ _ _ _ _ _ _ _ _ _
43
.......:......r........6---------- ------- T --
?
--------
---- -------------
Office Park 16.60
8.40
6.90
33.00
48.00
19.00
82
15
3
QRestaurant 16.60 8.40 6.90 Y uality
12.00
1 69.00
19.00
56
0
44
Strip Mall 16.60
8.40
6.90
16.60
64.40
19.00
66
0
34
4.4 Fleet Mix
Land Use
I LDA
I LDT1
I LDT2
I MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
Apartments High Rise
0.555968} 0.043848;
0.210359;
0.116378;
0.016765;
0.005795;
0.025008;
0.016160;
0.001677;
0.001586;
0.004867;
0.000586-
0.001002
r
General Office Building
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
. . . . . . . . . . . . . . . . 4 . . . . . . . .;....------------ '................ '................ '................ '................ '................ '................ '................ '................ '................ '................4 ---------
High Turnover (Sit Down
0.5559681 0.043848:
0.210359:
0.116378:
0.016765:
0.005795:
0.025008:
0.016160:
0.001677:
0.001586:
0.004867:
0.000586:
0.001002
Restaurant)
....................... f------- .*-------T-------T-------T-------T-------T-------T-------T-------T-------T-------T-------
--------
Office Park
0.555968� 0.043848�
0.210359�
0.116378�
0.016765�
0.005795�
0.025008�
0.016160�
0.001677.
0.001586�
0.0048671
0.000586
0.001002
-----------------------_-------- ---------------
Quality Restaurant
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
Strip Mall
0.555968. 0.043848'
0.210359'
0.116378'
0.016765'
0.005795'
0.025008'
0.016160'
0.001677'
0.001586'
0.004867'
0.000586'
0.001002
5.0 Energy Detail
Historical Energy Use: N
5.1 Mitigation Measures Energy
CaIEEMod Version: CalEEMod.2016.3.2 Page 12 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
ROG
NOx
I CO
I S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
I N20
CO2e
Category
lb/day
lb/day
NaturalGas •i 0.3377 i 2.9937 i 2.0185 i 0.0184 i i 0.2333
i 0.2333
i i 0.2333 0.2333
3,684.206 � 3,684.206 0.0706 0.0675
1 3,706.099
Mitigated ;i
, i 4 4
i 8
NaturalGas
0.3377 2.9937 2.0185 0.0184 0.2333
0.2333
0.2333 0.2333
3,684.206 • 3,684.206 • 0.0706 - 0.0675
• 3,706.099
Unmitigated
4 4
8
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
lb/day
lb/day
Apartments High
i 12992.9 •1 0.1401 1.1974 0.5095 7.6400e- 0.0968 i 0.0968 0.0968 0.0968 1 1,528.572 1,528.572 0.0293 0.0280 1,537.656
Rise
'1 1 I 1 003 1 1 I I 1 . 1 4 1 4 1 1 I 0
1
---------- _
1 ; 1 I I I I I I 1 , I 1 1 1
1------------------------------------------�-------�--------------------1-------�-------�--------------
r------71------- 1 1 1 1 1 1 1 1 , � 1 1 1 1 T
General Office
4758.99 .1 0.0513 1 0.4666 1 0.3919 1 2.8000e- 1 1 0.0355 1 0.0355 1 1 0.0355 0.0355 1 559.8806 1 559.8806 1 0.0107 1 0.0103 i 563.2077
Building
1 1 1 003
-----------1
'1------------------------------------------------------------------------• 1------------------------1
r------71-------1 1 1 1 1 1 1 1 , �-------I-------1 1 1 T'------
High Turnover (Sit
1904.76 •1 0.0205 1 0.1867 1 0.1569 1 1.1200e- 1 1 0.0142 1 0.0142 1 1 0.0142 0.0142 1 224.0893 1 224.0893 1 4.3000e- 1 4.1100e- i 225.4209
Down Restaurant)1
003 1 1 1 1 1 . 1 1 003 1 003 1
--- --------1
'1------------------------------------------�-------�---------------• 1 �-------�--------------1
------
1
Office Park
305.37 3.2900e- 0.0299 0.0252 1.8000e- 2.2800e- 2.2800e- 2.2800e- 2.2800e- 35.9259 35.9259 6.9000e- 6.6000e- i 36.1394
1 003 1 1 1 004 1 1 003 1 003 1 1 003 003 . 1 1 1 004 1 004 1
---------- -r------71-------1
j 0 1 I I I I I I I , 1 I I I 1
:-----------------------------------------------------------------------. 1------------------------1
1 1 1 1 1 1 1 , �-------I-------1 1 1 T'------
Quality
1 11307.1 •1 0.1219 1 1.1085 1 0.9312 1 6.6500e- 1 1 0.0843 1 0.0843 1 1 0.0843 0.0843 11,330.24211,330.2421 0.0255 1 0.0244 11,338.147
1
Restaurant
1 ; 1 I I 003 I I I I I . 1 6 1 6 1 1 I 6
1
---------
Strip Mall
1 ; I I I I I I I I , I I I 1
1---------I---------------------------------
r------71-------1 1 1 1 1 1 1 1 , � 1 1 1 1 T------
------------------------------ ------1-------------------------------
46.7123 5.000Oe- 4.5800e- 3.8500e- 3.000Oe- 3.5000e- 3.5000e- 3.5000e- 3.5000e- 1 5.4956 5.4956 1.1000e- 1.000Oe- 5.5282
.1 1 1 1 1 1 1 1 1 1 1 1
1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 . 1 1 1 004 1 004 1
t
0.3377
2.9938
2.0185
0.0184
0.2333
0.2333
0.2333
0.2333
3,684.206
7684.206
0.0706
0.0675
3,706.099
4
4
8
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
5.2 Energy by Land Use - NaturalGas
Mitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
Bio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
JPM2.5Total
INBio-CO2
I
Land Use
kBTU/yr
lb/day
lb/day
Apartments High
12.9929 •i 0.1401 i 1.1974 0.5095 7.6400e- 0.0968 i 0.0968 0.0968 0.0968 i 1,528.572 1,528.572 i 0.0293 i 0.0280 1,537.656
Rise
003 4 4 i 0
--------
General Office
------- J-------'------- - J--------A------- - J------- - J------- '------- ----- -- ------------- -A - - - - - - - - J------- - J- - - - - --
i 4.75899 -1 0.0513 i 0.4666 0.3919 2.8000e- i 0.0355 i 0.0355 0.0355 0.0355 i 559.8806 559.8806 i 0.0107 i 0.0103 i 563.2077
Building
003
High Turnover (Sit
1.90476 •i 0.0205 i 0.1867 0.1569 1.1200e- i 0.0142 i 0.0142 0.0142 0.0142 i 224.0893 224.0893 i 4.3000e- i 4.1100e- 1 225.4209
Down Restaurant)
i 003 i 003 003 i
----------
Office Park
--------------'-----------------------------------'-------- -------------------------------
0.30537 •1 3.2900e- i 0.0299 0.0252 1.8000e- i 2.2800e- i 2.2800e- 2.2800e- 2.2800e- i 35.9259 35.9259 i 6.9000e- i 6.6000e- 1:36.1394
i '� 003 004 003 003 003 003 004 004
Quality
.� i i i i i i
�� J------- �-------'------- �------- J------- �------- �------- '------- --------� -A ------- �------- �------- i
i 11.3071 i 0.1219 i 1.1085 � 0.9312 � 6.6500e- i � 0.0843 i 0.0843 � � 0.0843 0.0843 i 1,330.242 � 1,330.242 i 0.0255 i 0.0244 i 1,338.147
Restaurant
003 6 6 i 6
----------
Strip Mall
- J-------- -------- -------- J-------- -------- J--------------'--------------- -I-------- J-------- J-------
0.0467123•i 5.000Oe- i 4.5800e- 3.8500e- 3.000Oe- i 3.5000e- i 3.5000e- 3.5000e- 3.5000e- i 5.4956 5.4956 i 1.1000e- i 1.0000e- i 5.5282
004 003 003 005 004 004 004 004 i i � i i i � � � i i � 004 004
Total
0.3377
2.9938
2.0185
0.0184
0.2333
0.2333
0.2333
0.277
3,684.206
3,684.206
0.0706
0.0675
3,706.099
4
4
8
6.0 Area Detail
6.1 Mitigation Measures Area
No Hearths Installed
CaIEEMod Version: CalEEMod.2016.3.2 Page 15 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
ROG
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
Category
lb/day
lb/day
Mitigated •i 12.9636 i 0.3975
i 34.3752 i 1.8100e-
i i 0.1890
i 0.1890
0.1890
0.1890 0.0000 i 61.6989 61.6989 i 0.0603 0.0000
63.2051
003
Unmitigated •• 121.7085 9.0081
245.4242 0.5402
31.8901
31.8901
31.8901
31.8901 •3,887.2711- 7,531.698 •11,418.970- 11.6528 0.2638
•11,788.915
9 0
5
6.2 Area by SubCategory
Unmitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Subcategory
lb/day
lb/day
Architectural 1 1.1219 0.0000 i 0.0000 0.0000 0.0000 � i � 0.0000 0.0000
Coating
Consumer �� 10.7935 0.0000 i 0.0000 0.0000 0.0000 � i � 0.0000 0.0000
Products
Hearth •i 108.7449 i 8.6106 211.0490 i 0.5384 i 31.7012 i 31.7012 i 31.7012 31.7012:3,887.271117,470.000:11,357.271i 11.5926 0.2638 i11,725.710
0 1 i 4
Landscaping •i 1.0482 i 0.3975 34.3752 i 1.8100e- 0.1890 i 0.1890 0.1890 0.1890 61.6989 61.6989 i 0.0603 63.2051
003
Total
121.7085
9.0081
245.4242
0.5402
31.8901
31.8901
31.8901
31.8901
3,887.271
7,531.698
11,418.97
11.6528
0.2638
11,788.91
1
9
00
1
1 55
CaIEEMod Version: CalEEMod.2016.3.2 Page 16 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
6.2 Area by SubCategory
Mitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Subcategory
lb/day
lb/day
Architectural •i 1.1219 i � i i � 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000
Coating
Consumer •i 10.7935 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000
Products
Hearth •i 0.0000 i 0.0000 0.0000 i 0.0000 i � 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 � 0.0000 1 0.0000
----------- -i----------------------------------------------------------- - - - --- -- + i----------------------------*
Landscaping •i 1.0482 0.3975 34.3752 1.8100e- 0.1890 0.1890 0.1890 0.1890 i 61.6989 61.6989 0.0603 � 63.2051
i � i i � i � i � i �
003
Total
12.9636
0.3975
34.3752
1.8100e-
0.1890
0.1890
0.1890
61.6989
61.6989
0.0603
0.0000
63.2051
003
F-777000
7.0 Water Detail
7.1 Mitigation Measures Water
8.0 Waste Detail
8.1 Mitigation Measures Waste
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
CaIEEMod Version: CalEEMod.2016.3.2 Page 17 of 17 Date: 4/16/2020 1:17 PM
One Broadway Plaza (Proposed Project) - Orange County, Winter
Fire Pumos and Emeraencv Generators
IEquipment Type I Number I Hours/Day I Hours/Year I Horse Power I Load Factor I Fuel Type I
Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type
User Defined Equipment
Equipment Type Number
11.0 Vegetation
CaIEEMod Version: CalEEMod.2016.3.2 Page 1 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
One Broadway Plaza (Proposed Project)
Orange County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses
Size
Metric
Lot Acreage
Floor Surface Area
Population
General Office Building
190.05 +
1000sgft
; 0.00
190,047.00
i 0
•------------------------------_------------------------------_-----------------------------
Office Park 9.80
= - - ;-------------
1000sgft ; 0.00 9,803.00 i 0
+
•---g------------------------)--_------------------------------_-----------------------------
Hi h Turnover Sit Down Restaurant 2.68 +
= - - -;-------------
1000sgft ; 0.00 2,681.00 -+ 0
•---- --- - - - --y----------------_------------------------------_-
Qualit Restaurant 15.91 +
---------------------- - - - --- = --- ----;-------------- - - - - --
1000sgft ; 0.00 15,915.00 -+ 0
Apartments High Rise 415.00 +
--------------•----------------------------_------------------------------_----+---------------
Dwelling Unit ; 4.32 318,153.00 i 1187
•------------------------------_------------------------------_-----------------------------
--------------}------------------E---------------
Strip Mall
8.53
1000sgft
0.00
8,525.00
0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
CO2Intensity 702.44 CH4Intensity 0.029 N20Intensity 0.006
(lb/MWhr) (lb/MWhr) (lb/MWhr)
1.3 User Entered Comments & Non -Default Data
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
Project Characteristics -
Land Use - Total Lot Area = 4.32 ac
Construction Phase - Operational Run Only.
Off -road Equipment - Operational Run Only.
Trips and VMT - Operational Run Only.
Vehicle Trips - Trip Characteristics based on the One Broadway Plaze Trip Generation Evaluation by Urban Crossroads, Inc.
Woodstoves -
Area Coating -
Water And Wastewater -
Solid Waste -
Mobile Land Use Mitigation -
Area Mitigation -
Table Name
Column Name
Default Value
New Value
tblLandUse
Land UseSquareFeet
9,800.00
9,803.00
----------------------------_-----------------------------
tblLandUse
r-----------------------------t--------------------------
Land UseSquareFeet 1 2,680.00 2,681.00
----------------------------_-----------------------------r
tblLandUse
----------------------------- t--------------------------
Land UseSquareFeet 1 15,910.00 15,915.00
tblLandUse
Land UseSquareFeet 1 415,000.00 318,153.00
-----------------------------_-----------------------------r-----------------------------t--------------------------
tblLandUse
Land UseSquareFeet 1 8,530.00 8,525.00
-----------------------------
tblLandUse
------------------------------ ------------t--------------------------
LotAcreage } 4.36 0.00
-----------------------------
tblLandUse
------------------------------ t-----------------------------t--------------------------
LotAcreage 0.22 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.06 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 0.37 0.00
-----------------------------
tblLandUse
------------------------------ --------------------------------------------------------
LotAcreage 6.69 4.32
-----------------------------_----------------------------
tblLandUse
' ---------------------------------------
LotAcreage } 0.20 0.00
----------------------------- _------------------------------
tblOffRoadEquipment
r-----------------------------t--------------------------
OffRoadEquipmentUnitAmount 1 1.00 0.00
-----------------------------
tblOffRoad Equipment
------------------------------t------------------------------ --------------------------
OffRoadEquipmentUnitAmount 3.00 0.00
CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
tblOffRoadEquipment
OffRoadEquipmentUnitAmount
2.00
0.00
-----------------------------
tblVehideTrips
Y----------------------------
DV_TP
�-----------------------------
} 20.00
--------------------------
0.00
tblVehideTrips
DV_TP
} 18.00
0.00
tblVehideTrips
DV_TP
} 40.00
0.00
tblVehideTrips
PB_TP
} 15.00
34.00
tblVehideTrips
PR_TP
} 37.00
57.00
tblVehideTrips
PR_TP
} 38.00
56.00
tblVehideTrips
PR_TP
} 45.00
66.00
tblVehideTrips
ST_TR
} 4.98
2.16
tblVehideTrips
ST_TR
} 2.46
4.31
tblVehideTrips
ST_TR
} 158.37
122.40
tblVehideTrips
ST_TR
} 1.64
2.21
tblVehideTrips
ST_TR
} 94.36
90.04
tblVehideTrips
ST_TR
} 42.04
46.12
tblVehideTrips
SU_TR
} 3.65
2.16
tblVehideTrips
SU_TR
} 1.05
4.31
tblVehideTrips
SU_TR
} 131.84
142.64
tblVehideTrips
SU_TR
} 0.76
0.70
tblVehideTrips
SU_TR
} 72.16
71.97
tblVehideTrips
SU_TR
} 20.43
21.10
tblVehideTrips
WD_TR
} 4.20
2.16
tblVehideTrips
WD_TR
} 11.03
4.31
tblVehideTrips
WD_TR
} 127.15
112.64
tblVehideTrips
WD_TR
} 11.42
9.79
tblVehideTrips
WD_TR
} 89.95
83.82
--------------------------
tblVehideTrips
------------------------------
WD_TR
------------------------------
44.32
--------------------------
37.77
CaIEEMod Version: CalEEMod.2016.3.2 Page 4 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
2.0 Emissions Summary
2.1 Overall Construction
Unmitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
tons/yr
MT/yr
2020 •i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000
Maximum
11
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0. 0000
0.0000
0.0000
0.0000
0. 0000
0.0000
Mitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
tons/yr
MT/yr
2020 •i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 � 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Maximum
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 5 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Reduction
Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter)
Highest
2.2 Overall Operational
Unmitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
I
Category
tons/yr
MT/yr
I I I 1 I I 1 I I I 1
Area •I 3.6649 I 0.1573 I 6.9350 16.9600e- 1 I 0.4199 I 0.4199 I I 0.4199 0.4199 � 44.0809 I 91.7049 1135.7858 I 0.1383 1 2.9900e- 140.1347
003 1 I I 1 I . I I I 1 003 I
1
I I I 1 I I I I I I 1
Energy •I 0.0616 I 0.5464 I 0.3684 13.3600e- 1 I 0.0426 I 0.0426 I I 0.0426 0.0426 � 0.0000 12,278.035 12,278.035 I 0.0806 1 0.0254 2,287.627
003 1 I I I I . I 1 I 1 I I I 4
;� I I I 1 I I 1 I I I 1
I I I 1 I I 1 I I I 1
Mobile �1 0.9996 I 4.2202 I 12.3930 I 0.0427 1 3.6850 I 0.0436 I 3.7287 I 0.9869 I 0.0409 1.0278 � 0.0000 i 3,933.292 13,933.292 I 0.1739 1 0.0000 3,937.639
I I I 1 I I I I 6 1 6 I 1 I 8
I I I 1 I I 1 I I I 1
Waste •I I I I 1 I 0.0000 I 0.0000 I I 0.0000 0.0000 � 87.7185 I 0.0000 I 87.7185 I 5.1840 1 0.0000 217.3188
•I
I I I 1 I I I I I I 1
Water I I I 1 I 0.0000 I 0.0000 I I 0.0000 0.0000 � 21.8377 425.6268 1447.4645 I 2.2605 1 0.0566 520.8430
i
Total
4.7261
4.9239
19.6964
0.0531
3.6850
0.5061
4.1911
0.9869
0.5034
6,728.659
7.8373
0.0850
7103.563
F-777.6371
4
17,882.296
4
1
7
CaIEEMod Version: CalEEMod.2016.3.2 Page 6 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
2.2 Overall Operational
Mitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
Area •i 2.3056 i 0.0497 4.2969 i 2.3000e- 0.0236 i 0.0236 0.0236 0.0236 0.0000 i 6.9965 6.9965 i 6.8300e- 1 0.0000 7.1673
Energy •i 0.0616 i 0.5464 0.3684 i 3.3600e- 0.0426 i 0.0426 0.0426 0.0426 0.0000 i 2,278.035 2,278.035 i 0.0806 0.0254 2,287.627
Mobile •1 0.8847 i 3.4233 � 9.4011 i 0.0300 � 2.5279 � 0.0312 i 2.5591 � 0.6770 i 0.0292 0.7062 � 0.0000 i 2,759.072 � 2,759.072 i 0.1295 1 0.0000 � 2,762.308
'� i i i i i i i i • 7 i 7 i i i 9
------------------------------------------------------------------- .A-------�-------�-------
Waste •1 i i 0.0000 i 0.0000 i 0.0000 0.0000 87.7185 i 0.0000 87.7185 i 5.1840 0.0000 217.3188
Water •1 i � i � � 0.0000 i 0.0000 0.0000 0.0000 21.8377 i 425.6268 447.4645 i 2.2605 0.0566 520.8430
Total
3.2519
4.0194
14.0663
0.0336
2.5279
0.0974
2.6253
0.6770
0.0954
0.7724
109.5562
5,469.731
5,579.287
7.6614
0.0820
51795.265
1
3
5
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
31.19
18.37
28.58
36.75
31.40
80.76
37.36
31.40
81.04
48.17
28.69
18.71
18.93
2.24
3.52
18.42
Reduction
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 ;Demolition *Demolition :1/28/2020 2/24/2020 5• 20,
Acres of Grading (Site Preparation Phase): 0
CaIEEMod Version: CalEEMod.2016.3.2 Page 7 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural
Coating — sgft)
OffRoad Equipment
Phase Name
Offroad Equipment Type
Amount
Usage Hours
Horse Power
Load Factor
Demolition 'Concrete/Industrial Saws
; 0:
8.00' 81,
0.73
--------------------------
-------------
-----------
Demolition +Excavators
; 0
8.001 158,
0.38
-----------------------------------------------------*-----------------
------------r-------------
-----------
Demolition •Rubber Tired Dozers
0
8.00: 247:
0.40
Trips and VMT
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
I Hauling Trip
Number
I Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix :HDT Mix HHDT
3.1 Mitigation Measures Construction
CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
3.2 Demolition - 2020
Unmitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
tons/yr
MT/yr
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 I 0.0000 I 0.0000 1 0.0000 I 1 0.0000 1 0.0000 I 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • I 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
I I I I 1 I I I 1 I I
Hauling •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 I 0.0000 1 0.0000 0.0000 � 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I 1 I I
Vendor •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
1 1 I
• 1
1 I
I I I I 1 1 I I 1 I I
Worker •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000
I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 • 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CaIEEMod Version: CalEEMod.2016.3.2 Page 9 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
3.2 Demolition - 2020
Mitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Category
tons/yr
MT/yr
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 I 0.0000 I 0.0000 1 0.0000 I 1 0.0000 1 0.0000 I 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • I 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
Total
I
Category
tons/yr
MT/yr
I I I I 1 I I I I
Hauling •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I I
Vendor •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
1 1 I
• 1
1 I
I I I 1 1 I I I
Worker •1 0.0000 I 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 1 0.0000
I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 • 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.0 Operational Detail - Mobile
CaIEEMod Version: CalEEMod.2016.3.2 Page 10 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
4.1 Mitigation Measures Mobile
Increase Density
Increase Diversity
Improve Destination Accessibility
Improve Pedestrian Network
ROG
NOx
CO
I S02
I Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
1777Total
CO2
CH4
I N20
I CO2e
Category
tons/yr
MT/yr
Mitigated
•i 0.8847 i 3.4233 i 9.4011 0.0300 i 2.5279 0.0312
2.5591
i 0.6770
0.0292 0.7062
0.0000 i 2,759.072 2,759.072 0.1295
i 0.0000 i 2,762.308
7 , 7 ,
, i 9
Unmitigated
0.9996 4.2202 12.3930 0.0427 3.6850 0.0436
- 3.7287
0.9869
0.0409 1.0278
0.0000 3,933.292 3,933.292 - 0.1739
0.0000 3,937.639
6 6
8
4.2 Trip Summary Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
Apartments High Rise ; 896.40 896.40 896.40 3,063,135 2,101,311
...................................... .------------ ------------T-----------Y------------------------:--------------------------
General Office Building ; 819.10 ; 819.10 819.10 2,638,707 1,810,153
............................ ...... ----- -------,:------------------------:------------------------
;-----------T
High Turnover (Sit Down Restaurant) ; 301.88 , 328.03 382.28 584,717 401,116
................................................... ---------- ----------- ---------------------- ----------------------- -r
Office Park ........� ---_ ---- 95.94 , 21.66---T6:86----y------------------------- 168,278
....
Quality Restaurant ; 1,333.58 1,432.54 1145.04 2,470,857 1,695,008
......................................---------------------------- -----------------------:------------------------
Strip Mall ; 322.18 ; 393.40 179.98 714,239 489,968
Total 3,769.07
3,891.13
3,429.66
9,716,959
6,665,834
CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
4.3 Trip Type Information
Miles
Trip %
Trip Purpose %
Land Use
H-W or C-W
H-S or C-C
H-O or C-NW
H-W or C W
H-S or C-C
H-O or C-NW
Primary
Diverted
Pass -by
Apartments High Rise 14.70
5.90
8.70
40.20
1 19.20
40.60
86
11
3
........................------------------
1
--------
---- -------------
General Office Building 16.60
8.40
6.90
33.00
48.00
19.00
77
19
4
.......................• - - - - - - - - - - - - - - - - - - - - T _ _ _ _ _ _ _ _ _ _
High Turnover (Sit Down ; 16.60 8.40 6.90
- - - - - - - _ --_
8.50
_ _ _ _ _ _ _ _
1 72.50
T _ _ _ _ _ _ _ _ _ _ _
19.00
_ _ _ _ _ _ _ _ _ _
57
_ _ _ _ _ _ _ _ _ _ _ _ _
0
_ _ _ _ _ _ _ _ _ _ _ _ _
43
.......:......r........6---------- ------- T --
? I
--------
---- -------------
Office Park 16.60
8.40
6.90
33.00
48.00
19.00
82
15
3
QRestaurant 16.60 8.40 6.90 Y uality
12.00
1 69.00
19.00
56
0
44
Strip Mall 16.60
8.40
6.90
16.60
64.40
19.00
66
0
34
4.4 Fleet Mix
Land Use
I LDA
I LDT1
I LDT2
I MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
Apartments High Rise
0.555968} 0.043848
; 0.210359
; 0.116378
; 0.016765
; 0.005795
; 0.025008
; 0.016160
; 0.001677 ;
0.001586
; 0.004867
; 0.000586
- 0.001002
r
General Office Building
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
. . . . . . . . . . . . . . . . 4 . . . . . . . .;....------------ '................ '................ '................ '................ '................ '................ '................ '................ '................ '................4 ---------
High Turnover (Sit Down
0.5559681 0.043848:
0.210359:
0.116378:
0.016765:
0.005795:
0.025008:
0.016160:
0.001677:
0.001586:
0.004867:
0.000586:
0.001002
Restaurant)
....................... f------- .*-------T-------T-------T-------T-------T-------T-------T-------T-------T-------T-------
--------
Office Park
0.555968� 0.043848�
0.210359�
0.116378�
0.016765�
0.005795�
0.025008�
0.016160�
0.001677.
0.001586�
0.0048671
0.000586
0.001002
-----------------------_-------- ---------------
Quality Restaurant
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
Strip Mall
0.555968. 0.043848'
0.210359'
0.116378'
0.016765'
0.005795'
0.025008'
0.016160'
0.001677'
0.001586'
0.004867'
0.000586'
0.001002
5.0 Energy Detail
Historical Energy Use: N
5.1 Mitigation Measures Energy
CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
ROG
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
I N20
CO2e
Category
tons/yr
MT/yr
Electricity •I
I I I
1 1 I
I 1
1 I 0.0000
I I
I 0.0000 1
I
I 0.0000
� 0.0000
� 0.0000
I I
11,668.073 1 1,668.073 1 0.0689
I
1 0.0143
i 1,674.041
Mitigated
4 I 4 1
I
1 0
•I I I I I I I
...........el-------J-------J-------J-------J-------J-------J-------J-------J
I
1
.....................I-------J
I 1 I I
------- J------- J-------
1
T .......
Electricity •I
I I I
1 1 I
I 1
1 I 0.0000
I I
I 0.0000 I
I
I 0.0000
0.0000
� 0.0000
1 I
11,668.073 1 1,668.073 I 0.0689
I
1 0.0143
� 1,674.041
Unmitigated
4 I 4 1
I
1 0
•I I I I I I I
I
1
I 1 I I
1
NaturalGas •I
I I I
0.0616 I 0.5464 1 0.3684 13.3600e-
I 1
1 I 0.0426
I I
I 0.0426 I
I
I 0.0426
0.0426
� 0.0000
1 I
I 609.9617 1 609.9617 I 0.0117
I
1 0.0112
613.5864
Mitigated
003
I I I I I I I 1
1 I I
1
NaturalGas
• 0.0616 0.5464 0.3684 3.3600e-
- 0.0426
0.0426 -
0.0426
0.0426
0.0000
609.9617 • 609.9617 0.0117
- 0.0112
613.5864
Unmitigated
003
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
tons/yr
MT/yr
Apartments High
I 1 1 1 1 I 1 1 1 1 1
i 4.7424e •1 0.0256 1 0.2185 1 0.0930 1 1.3900e- 1 1 0.0177 1 0.0177 1 1 0.0177 0.0177 � 0.0000 1 253.0723 1 253.0723 1 4.8500e- 1 4.6400e- 1 254.5762
Rise
i +006 '1 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
;
_
General Office
1
r------71-------- 1 1 1 1 1 1 1 1 � - 1 1 1 1 T
1.73703e 9.3700e- 1 0.0852 1 0.0715 1 5.1000e- 1 1 6.4700e- 1 6.47OOe- 1 1 6.47OOe- 6.47OOe- 0.0000 1 92.6945 1 92.6945 1 1.7800e- 1 1.7000e- i 93.2454
Building
.1
i +006 003 1 1 1 004 1 1 003 1 003 1 1 003 003 003 1 003 1
-----------1
r----- '1-------------- ------------------------------------ ----------------------�•------- ------- 1 ---------------------1 -711 1 1 1 1 1 1 1 � I1 1 1 T'------
High Turnover (Sit
695237 •1 3.7500e- 1 0.0341 1 0.0286 1 2.000Oe- 1 1 2.5900e- 1 2.5900e- 1 1 2.5900e- 2.5900e- 0.0000 1 37.1005 1 37.1005 1 7.1000e- 1 6.8000e- i 37.3210
Down Restaurant)
i 003 1 1 1 004 1 1 003 1 003 1 1 003 003 004 1 004 1
-----------�
'1------------------------------------------�-------�----------------1 �-------�--------------1
r------1-------I-------1 1 1 T'------
Office Park
111460 n 6.000Oe- 1 5.4600e- 1 4.5900e- 1 3.000Oe- 1 1 4.2000e- 1 4.2000e- 1 1 4.2000e- 4.2000e- 0.0000 1 5.9479 1 5.9479 1 1.1000e- 1 1.1000e- 1 5.9833
1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 . 1 1 1 004 1 004 1
1
---r------71-------1
-------
j i I I I I I I I I , I I I 1
:---------------------------- ------------------------------------. 1---------------------1
1 1 1 1 1 1 1 � �-------I-------1 1 1 T'------
Quality
4.12708e •1 0.0223 1 0.2023 1 0.1699 1 1.21OOe- 1 1 0.0154 1 0.0154 1 1 0.0154 0.0154 0.0000 1 220.2366 1 220.2366 1 4.22OOe- 1 4.0400e- 1 221.5453
'
Restaurant
i +006 ; 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
--r------71-------1
1 1 1 1 1 1 1 � - 1 1 1 1 T""'--
Strip Mall
17050 .1 9.000Oe- 1 8.4000e- 1 7.000Oe- 1 1.000Oe- 1 1 6.000Oe- 1 6.000Oe- 1 1 6.000Oe- 6.000Oe- 0.0000 1 0.9099 1 0.9099 1 2.000Oe- 1 2.000Oe- i 0.9153
1 005 1 004 1 004 1 005 1 1 005 1 005 1 1 005 005 . 1 1 1 005 1 005 1
Total
0.0616
0.5464
0.3684
3.3500e-
0.0426
0.0426
0.0426
0.0426
0.0000
609.9617
609.9617
0.0117
0.0112
613.5864
0031
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
5.2 Energy by Land Use - NaturalGas
Mitigated
NaturalGa
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
tons/yr
MT/yr
Apartments High
I 1 1 1 1 I 1 1 1 1 1
i 4.7424e •1 0.0256 1 0.2185 1 0.0930 1 1.3900e- 1 1 0.0177 1 0.0177 1 1 0.0177 0.0177 � 0.0000 1 253.0723 1 253.0723 1 4.8500e- 1 4.6400e- 1 254.5762
Rise
i +006 '1 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
;
_
General Office
1
r------71-------- 1 1 1 1 1 1 1 1 � - 1 1 1 1 T
1.73703e 9.3700e- 1 0.0852 1 0.0715 1 5.1000e- 1 1 6.4700e- 1 6.47OOe- 1 1 6.47OOe- 6.47OOe- 0.0000 1 92.6945 1 92.6945 1 1.7800e- 1 1.7000e- i 93.2454
Building
.1
i +006 003 1 1 1 004 1 1 003 1 003 1 1 003 003 003 1 003 1
-----------1
r----- '1-------------- ------------------------------------ ----------------------�•------- ------- 1 ---------------------1 -711 1 1 1 1 1 1 1 � I1 1 1 T'------
High Turnover (Sit
695237 •1 3.7500e- 1 0.0341 1 0.0286 1 2.000Oe- 1 1 2.5900e- 1 2.5900e- 1 1 2.5900e- 2.5900e- 0.0000 1 37.1005 1 37.1005 1 7.1000e- 1 6.8000e- i 37.3210
Down Restaurant)
i 003 1 1 1 004 1 1 003 1 003 1 1 003 003 004 1 004 1
--------1
'1------------------------------------------�-------�---------------• 1 �-------�--------------1
r------71-------1 1 1 1 1 1 1 1 +-------I-------1 1 1 T-------
Office Park
i 111460 n 6.000Oe- 1 5.4600e- 1 4.5900e- 1 3.000Oe- 1 1 4.2000e- 1 4.2000e- 1 1 4.2000e- 4.2000e- 0.0000 1 5.9479 1 5.9479 1 1.1000e- 1 1.1000e- i 5.9833
1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 . 1 1 1 004 1 004 1
1
---r------71-------1
-------
I I I I I I I I , I I I 1
:---------------------------- --------------�----------------------. 1---------------------1
1 1 1 1 1 1 1 � --------I-------1 1 1 T'------
Quality
4.12708e •1 0.0223 1 0.2023 1 0.1699 1 1.21OOe- 1 1 0.0154 1 0.0154 1 1 0.0154 0.0154 0.0000 1 220.2366 1 220.2366 1 4.22OOe- 1 4.0400e- 1 221.5453
'
Restaurant
i +006 ; 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
--r------71-------1
1 1 1 1 1 1 1 � - 1 1 1 1 T""'--
Strip Mall
17050 .1 9.000Oe- 1 8.4000e- 1 7.000Oe- 1 1.000Oe- 1 1 6.000Oe- 1 6.000Oe- 1 1 6.000Oe- 6.000Oe- 0.0000 1 0.9099 1 0.9099 1 2.000Oe- 1 2.000Oe- i 0.9153
1 005 1 004 1 004 1 005 1 1 005 1 005 1 1 005 005 . 1 1 1 005 1 005 1
Total
0.0616
0.5464
0.3684
3.3500e-
0.0426
0.0426
0.0426
0.0426
0.0000
609.9617
609.9617
0.0117
0.0112
613.5864
0031
CaIEEMod Version: CalEEMod.2016.3.2 Page 15 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
5.3 Energy by Land Use - Electricity
Unmitigated
Electricity
Total CO2
CH4
N20
CO2e
Use
Land Use
kWh/yr
MT/yr
Apartments High
1.64975e •i 525.6455 i 0.0217 4.4900e- 527.5261
Rise
-006 003
General Office
----------------
2.65876e •i 847.1371 i 0.0350 7.2400e- 850.1678
Building
-006 003
High Turnover (Sit
- J------- J-------
97802.9 •1 31.1621 i 1.2900e- 2.7000e- 31.2736
Down Restaurant)
i ;� i 003 004
--
Office Park
�------ it------ *-------
�-------�-------
i 150868 •1 48.0698 i 1.9800e- 4.1000e- 48.2418
003 i 004
-------ii-------
Quality
•�--------------
580579 •1 184.9850 i 7.6400e- 1.5800e- 185.6468
Restaurant
;1 i 003 003
---- - --- --
•�--------------
Strip Mall
97526 •i 31.0739 i 1.2800e- 2.7000e- 31.1850
003 i 004
Total
1,668.073
0.0689
0.0143
1:674.041
4
0
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
5.3 Energy by Land Use - Electricity
Mitigated
Electricity
Total CO2
CH4
N20
CO2e
Use
Land Use
kWh/yr
MT/yr
Apartments High
1.64975e •i 525.6455 i 0.0217 4.4900e- 527.5261
Rise
+006 003
General Office
----------------
2.65876e •i 847.1371 i 0.0350 7.2400e- 850.1678
Building
i +006 003 i
High Turnover (Sit
i i
97802.9 •1 31.1621 i 1.2900e- 2.7000e- 31.2736
Down Restaurant)
i ;� 003 004
Office Park
- J------- J-------
i 150868 •1 48.0698 i 1.9800e- 4.1000e- 48.2418
003 i 004
---r------ii-------
Quality
•�-------------- *-------
580579 •1 184.9850 i 7.6400e- 1.5800e- 185.6468
Restaurant
;1 i 003 003
---- - --- --
•�--------------
Strip Mall
97526 •i 31.0739 i 1.2800e- 2.7000e- 31.1850
003 i 004
Total
1,668.073
0.0689
0.0143
1:674.041
4
0
6.0 Area Detail
6.1 Mitigation Measures Area
No Hearths Installed
CaIEEMod Version: CalEEMod.2016.3.2 Page 17 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
ROG
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
Category
tons/yr
MT/yr
Mitigated •i 2.3056
0.0497 4.2969 2.3000e-
0.0236
0.0236
0.0236
0.0236 0.0000 i 6.9965 6.9965 6.8300e- 0.0000 i 7.1673
i �
004
i
i i
� i
003
Unmitigated 3.6649
0.1573 6.9350 6.9600e-
- 0.4199
- 0.4199
0.4199
0.4199 44.0809 91.7049 135.7858 - 0.1383 • 2.9900e- 140.1347
003
003
6.2 Area by SubCategory
Unmitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
Subcategory
tons/yr
MT/yr
Architectural •i 0.2047 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000
Coating•' ' i
%
----------- ----------------------------------------------------------------------- ---------------------------------- *-------
Consumer �� 1.9698 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000
Products
Hearth •i 1.3593 i 0.1076 2.6381 i 6.7300e- 0.3963 i 0.3963 0.3963 0.3963 44.0809 i 84.7084 128.7893 i 0.1315 2.9900e- 132.9673
•� 003 003 i
Landscaping •i 0.1310 0.0497 4.2969 2.3000e- 0.0236 0.0236 0.0236 0.0236 0.0000 i 6.9965 6.9965 6.8300e- 0.0000 i 7.1673
i i i i
004 003 i
Total
3.6649
0.1573
6.9350
6.9600e-
0.4199
0.4199
0.4199
91.7049
135.7858
0.1383
2.9900e-
140.1347
003
F-7770809
003
CaIEEMod Version: CalEEMod.2016.3.2 Page 18 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
6.2 Area by SubCategory
Mitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
Subcategory
tons/yr
MT/yr
Architectural •i 0.2047 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Coating '�
Consumer •i 1.9698 i � i i � 0.0000 i 0.0000 � i 0.0000 0.0000 � 0.0000 i 0.0000 � 0.0000 i 0.0000 0.0000 0.0000
Products
Hearth •i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 1 0.0000
Landscaping •i 0.1310 0.0497 4.2969 2.3000e- 0.0236 0.0236 0.0236 0.0236 0.0000 i 6.9965 6.9965 6.8300e- 0.0000 � 7.1673
i � i i � i � i � i � i
004 003
Total
2.3056
0.0497
4.2969
2.3000e-
0.0236
0.0236
0.0236
0.0236
0.0000
6.9965
6.9965
6.8300e-
0.0000
7.1673
004
003
7.0 Water Detail
7.1 Mitigation Measures Water
CaIEEMod Version: CalEEMod.2016.3.2 Page 19 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
Total CO2
CH4
N20
CO2e
Category
MT/yr
Mitigated •1 447.4645 i 2.2605 i 0.0566
i 520.8430
- - - - - - - - - - - % --------------4------------------------------- - - - - - - -
Unmitigated •• 447.4645 2.2605 0.0566
520.8430
CaIEEMod Version: CalEEMod.2016.3.2 Page 20 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
7.2 Water by Land Use
Unmitigated
Indoor/Out
Total CO2
CH4
N20
CO2e
door Use
Land Use
Mgal
MT/yr
Apartments High
27.0389 / •i 181.0983 0.8882 0.0223 209.9416
Rise
i 17.0463 :
i
General Office
33.7783 / •1 224.1403 1.1095 0.0278 i 260.1652
Building
20.7028 :
-- - - - --- - - - - - -
High Turnover (Sit
0.81347 / •i 3.8168 0.0267 6.6000e- 4.6787
Down Restaurant)�0.0519236:1
i i 004
------�r------ *-------
Office Park
1.74179 / •1 11.5579 0.0572 1.4300e- i 13.4155
1.06755 :i i 003
•! J------- J-------
Quality
4.82922 / •i 22.6586 0.1582 3.9000e- 27.7754
Restaurant
0.308248:i 003
---- -- - - - --
--- - - - - - - - - - - - - - -
Strip Mall
13.631839 / •i 4.1927 0.0208 5.2000e- 4.8665
0.387256:i i 004
Total
447.4645
j 2.2605
j 0.0566
520.8430
CaIEEMod Version: CalEEMod.2016.3.2 Page 21 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
7.2 Water by Land Use
Mitigated
Indoor/Out
Total CO2
CH4
N20
CO2e
door Use
Land Use
Mgal
MT/yr
Apartments High
27.0389 / •i 181.0983 0.8882 0.0223 209.9416
Rise
i 17.0463 :
i
General Office
33.7783 / •1 224.1403 1.1095 0.0278 i 260.1652
Building
20.7028 :
-- - - - --- - - - - - -
High Turnover (Sit
0.81347 / •i 3.8168 0.0267 6.6000e- 4.6787
Down Restaurant)�0.0519236:1
i i 004
-- --r------�i-------
*-------
Office Park
1.74179 / •1 11.5579 0.0572 1.4300e- i 13.4155
1.06755 :i i 003
•! J------- J-------
Quality
4.82922 / •i 22.6586 0.1582 3.9000e- 27.7754
Restaurant
0.308248:i 003
---- -- - - - --
--- - - - - - - - - - - - - - -
Strip Mall
13.631839 / •i 4.1927 0.0208 5.2000e- 4.8665
0.387256:i i 004
Total
447.4645
j 2.2605
j 0.0566
520.8430
8.0 Waste Detail
8.1 Mitigation Measures Waste
CaIEEMod Version: CalEEMod.2016.3.2 Page 22 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
CategoryNear
Total CO2
CH4
N20
CO2e
MT/yr
Mitigated •i 87.7185 i 5.1840 0.0000 1 217.3188
- - - - - - - - - - - %.............. +--------------}............... ...... .
Unmitigated •• 87.7185 5.1840 0.0000 217.3188
CaIEEMod Version: CalEEMod.2016.3.2 Page 23 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
8.2 Waste by Land Use
Unmitigated
Waste
Total CO2
CH4
N20
CO2e
Disposed
I
Land Use
tons
MT/yr
Apartments High
190.9 •1 38.7510 2.2901 0.0000 96.0039
Rise
•�
- -�------ter
i
------'-------'------- *-------
General Office
i 176.75 •1 35.8787 2.1204 0.0000 i 88.8878
Building
•�
i •� -'-------'-------
High Turnover (Sit
31.89 •1 6.4734 0.3826 0.0000 16.0375
Down Restaurant)
i •�
-- -�------ter
------'-------'------- *-------
Office Park
i 9.11 •1 1.8493 0.1093 0.0000 i 4.5814
--
--------------'-------'-------*- - - - - -
Quality
14.52 •i 2.9474 0.1742 0.0000 7.3021
Restaurant
•�
i
---'-------
Strip Mall
i 8.96 •i 1.8188 0.1075 0.0000 i 4.5060
Total
87.7185
5.1840
0.0000
217.3188
CaIEEMod Version: CalEEMod.2016.3.2 Page 24 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
8.2 Waste by Land Use
Mitigated
Waste
Total CO2
CH4
N20
CO2e
Disposed
Land Use
tons
MT/yr
Apartments High
190.9 •1 38.7510 2.2901 0.0000 96.0039
Rise
•�
- -�------ter
i
------'-------'------- *-------
General Office
i 176.75 •1 35.8787 2.1204 0.0000 i 88.8878
Building
•�
i •� -'-------'-------
High Turnover (Sit
31.89 •1 6.4734 0.3826 0.0000 16.0375
Down Restaurant)
i •I
-- -�------ter
------'-------'------- *-------
Office Park
i 9.11 •1 1.8493 0.1093 0.0000 i 4.5814
--
--------------'-------'-------*- - - - - -
Quality
14.52 •i 2.9474 0.1742 0.0000 7.3021
Restaurant
•�
i
---'-------
Strip Mall
i 8.96 •i 1.8188 0.1075 0.0000 i 4.5060
Total
87.7185
5.1840
0.0000
217.3188
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type
Boilers
CaIEEMod Version: CalEEMod.2016.3.2 Page 25 of 25 Date: 4/16/2020 1:20 PM
One Broadway Plaza (Proposed Project) - Orange County, Annual
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type
User Defined Equipment
Equipment Type Number
11.0 Vegetation
CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
One Broadway Plaza (Entitled Use)
Orange County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses
Size
Metric
Lot Acreage
Floor Surface Area
Population
General Office Building
508.20
+ 1000sgft
; 4.32
508,200.00 i
0
-------------------------------
Office Park
_------------------------------
9.80
_------------------------------
+ 1000sgft
= — —
; 0.00
;-------------
9,803.00 i
0
•----------------------------_------------------------------_-----------------------------
-
h Turnover Sit Down Restaurant)
High
2.68
+ 1000sgft
= — —
; 0.00
;-------------
2,681.00 -+
-------
0
•------------y----------------_------------------------------_-----------------------------
Qualit Restaurant
15.91
+ 1000sgft
= — --
; 0.00
—;-------------
15,915.00 -+
-------
0
-------------------------------
_------------------------------
_-----------------------------
T --------------}------------------E---------------
Strip Mall
8.53
1000sgft
0.00
8,525.00
0
1.2 Other Project Characteristics
Urbanization Urban
Climate Zone 8
Utility Company Southern California Edison
CO2Intensity 702.44
(lb/MWhr)
Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Operational Year 2020
CH4Intensity 0.029 N20Intensity 0.006
(lb/MWhr) (lb/MWhr)
1.3 User Entered Comments & Non -Default Data
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
Project Characteristics -
Land Use - Total Project Area = 4.32 ac
Construction Phase - Operational Run Only.
Off -road Equipment - Operational Run Only.
Trips and VMT - Operational Run Only.
Area Mitigation -
Vehicle Trips - Trip Rates based on 2002 EIR Traffic Study & ITE 6th Edition Rates
CalEEMod Version: CaIEEMod.2016.3.2 Page 3 of 23
One Broadway Plaza (Entitled Use) - Orange County, Annual
Date: 3/5/2020 9:53 AM
Table Name
I Column Name
I Default Value
I New Value
tblConstruction Phase
NumDays } 20.00
0.00
tblLandUse
Land UseSquareFeet i 9,800.00 9,803.00
tblLandUse
Land UseSquareFeet } 2,680.00 2,681.00
tblLandUse
Land UseSquareFeet } 15,910.00 15,915.00
tblLandUse
Land UseSquareFeet } 8,530.00 8,525.00
tblLandUse
LotAcreage } 11.67 4.32
tblLandUse
LotAcreage } 0.22 0.00
tblLandUse
LotAcreage } 0.06 0.00
tblLandUse
LotAcreage } 0.37 0.00
tblLandUse
LotAcreage } 0.20 0.00
tblOffRoad Equipment
OffRoadEquipmentUnitAmount } 1.00 0.00
tblOffRoad Equipment
OffRoadEquipmentUnitAmount } 3.00 0.00
tblOffRoad Equipment
OffRoadEquipmentUnitAmount } 2.00 0.00
---------tblVehicleTrips--------- =------------ST
TR-------------}-------------2.46------------------------2.37-----------
---------tblVehicleTrips---------=------------ST_TR-------------}------------158.37------------------------79.19-----------
---------tblVehicleTrips--------- =------------ST
TR-------------}-------------1.64------------------------2.37-----------
---------tblVehicleTrips--------- =------------ST
TR-------------}------------ 42.04------------------------49.97-----------
---------tblVehicleTrips--------- =
------------SU TR------------------ }--------------
1.05------------�----------- 0.98-----------
---------tblVehicleTrips--------- =------------SU
TR------------}------------131.84------------------------65.92-----------
---------tblVehicleTrips--------- =
------------SU_TR--------------- }-------------0.76------------------------ 0.98-----------
---------tblVehicleTrips--------- =
------------SU_TR------------}------------ 20.43------------------------25.24-----------
tblVehicleTri s
WD_TR } 11.03 9.10
---------tblVehicleTrips--------- =------------WD
TR------------}------------127.15------------------------65.17-----------
---------tblVehicleTrips--------- =
------------WD TR------------}------------ 11.42------------------------11.01-----------
----------------------------
tblVehicleTrips
------------------------------------------------------------ --------------------------
WD_TR 44.32 40.67
CalEEMod Version: CaIEEMod.2016.3.2 Page 4 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
2.0 Emissions Summary
2.1 Overall Construction
Unmitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
tons/yr
MT/yr
2020 •i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000 i 0.0000
Maximum
11
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0. 0000
0.0000
0.0000
0.0000
0. 0000
0.0000
Mitigated Construction
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Year
tons/yr
MT/yr
2020 •i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 � 0.0000 i 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Maximum
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CalEEMod Version: CaIEEMod.2016.3.2 Page 5 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Reduction
Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter)
Highest
2.2 Overall Operational
Unmitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
Total
I
PM2.5
I
PM2.5
I
Category
tons/yr
MT/yr
I 1 I 1 I I I I I I 1
Area •I 2.2231 0.0000 1 13.000Oe- 3.000Oe- � 0.0000 I 0.0135 0.0135 0.0000 i 0.0144
16.000Oe- 17.000Oe- I 13.000Oe- 13.000Oe- I I 14.000Oe- 1
•1 1 005 1 003 I I I 005 1 005 I 1 005 005 . I I I 005 1 I
I I I 1 I I 1 I I I 1
Energy •I 0.0517 I 0.4704 I 0.3951 12.8200e- 1 I 0.0358 I 0.0358 I I 0.0358 0.0358 � 0.0000 13,072.666 13,072.666 I 0.1155 1 0.0313 3,084.869
003 1 I I I I 1 2 1 2 I 1 I 8
;� I I I 1 I I I I I I 1
Mobile •I 1.4899 6.3071 18.5559 0.0641 5.5319 0.0654 5.5973 1.4814 0.0614 1.5428 0.0000 15,901.293 I 5,901.293 I 0.2605 1 0.0000 � 5,907.805
1
6 1 6 1 1 9
I I 1
I I I 1 I I 1 I I I 1
Waste •I I I I 1 I 0.0000 I 0.0000 I I 0.0000 0.0000 109.0285 I 0.0000 1109.0285 I 6.4434 1 0.0000 270.1134
,1
I I I 1 I I I I I I 1
Water I I I 1 I 0.0000 I 0.0000 I I 0.0000 0.0000 � 31.1989 610.3855 1641.5844 I 3.2296 1 0.0809 746.4266
i
Total
3.7648
6.7775
18.9581
0.0670
5.5319
0.1012
5.6331
1.4814
0.0971
140.2274
9,584.358
10.0491
0.1121
10,009.23
7786
8
1'9,724.586
3
1
02
1
CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
2.2 Overall Operational
Mitigated Operational
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
Total
PM2.5
I
PM2.5
I
Category
tons/yr
MT/yr
Area •i 2.2231 i 6.000Oe- 7.000Oe- i 0.0000 3.000Oe- i 3.000Oe- 3.000Oe- 3.000Oe- 0.0000 i 0.0135 0.0135 i 4.000Oe- 0.0000 0.0144
005 003 005 005 005 005 005 i
Energy •i 0.0517 i 0.4704 0.3951 i 2.8200e- 0.0358 i 0.0358 0.0358 0.0358 0.0000 i 3,072.666 3,072.666 i 0.1155 0.0313 3,084.869
003 i i i i i 2 i 2 i i i 8
Mobile •i 1.4899 i 6.3071 18.5559 i 0.0641 � 5.5319 0.0654 i 5.5973 1.4814 i 0.0614 1.5428 0.0000 i 5,901.293 5,901.293 i 0.2605 0.0000 5,907.805
6 i 6 i i i 9
Waste •i 0.0000 0.0000 0.0000 0.0000 109.0285 i 0.0000 109.0285 6.4434 0.0000 270.1134
i i i i i
Water •1 i � i � � 0.0000 i 0.0000 � i 0.0000 0.0000 31.1989 i 610.3855 � 641.5844 i 3.2296 0.0809 746.4266
Total
3.7648
6.7775
18.9581
0.0670
5.5319
0.1012
5.6331
1.4814
0.0971
1.5786
140.2274
9,584.358
9,724.586
10.0491
0.1121
10,009.23
11
8
3
02
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5
Bio- CO2
NBio-0O2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
Total
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Reduction
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 ;Demolition *Demolition '1/28/2020 1/27/2020 5' 0'
Acres of Grading (Site Preparation Phase): 0
CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural
Coating — sgft)
OffRoad Equipment
Phase Name
Offroad Equipment Type
Amount
Usage Hours
Horse Power
Load Factor
Demolition 'Concrete/Industrial Saws
; 0:
8.00' 81,
0.73
--------------------------
-------------
-----------
Demolition +Excavators
; 0
8.001 158,
0.38
-----------------------------------------------------*-----------------
------------r-------------
-----------
Demolition •Rubber Tired Dozers
0
8.00: 247:
0.40
Trips and VMT
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
I Hauling Trip
Number
I Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix :HDT Mix HHDT
3.1 Mitigation Measures Construction
CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
3.2 Demolition - 2020
Unmitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 I 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • I 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
I I I I 1 I I I 1 I I
Hauling •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 I 0.0000 1 0.0000 0.0000 � 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I 1 I I
Vendor •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
;� I I 1 I 1 1 I 1 1 1 I
• 1
1 I
I I I I 1 1 I I 1 I I
Worker •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000
I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 • 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
3.2 Demolition - 2020
Mitigated Construction On -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
I I 1 I 1 1 I 1 1 1 I
Off -Road •1 0.0000 I 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 0.0000
'1 I I 1 I 1 1 I 1 • I 1 1 I 1
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated Construction Off -Site
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
I
I
I
PM10
PM10
I
Total
PM2.5
PM2.5
I
Category
tons/yr
MT/yr
I I I I 1 I I I I
Hauling •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 i 0.0000
;� I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 1 1 I
•1 • I 1
1 I
I I I I 1 1 I I I
Vendor •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 1 0.0000
'1 I I 1 I 1 1 I 1 • 1 1 1 I 1
;� I I 1 I 1 1 I 1 1 1 I
• 1
1 I
I I I I 1 1 I I I
Worker •1 0.0000 1 0.0000 I 0.0000 1 0.0000 I 0.0000 1 0.0000 1 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 1 1 0.0000 I I 0.0000 1 0.0000 1 0.0000
I I 1 I 1 1 I 1 • � 1 1 I 1
I I 1 I 1 1 I 1 • 1 1 I 1
F7.1
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.0 Operational Detail - Mobile
CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
4.1 Mitigation Measures Mobile
ROG
I NOx
I CO
I S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
I N20
CO2e
Category
tons/yr
MT/yr
Mitigated �� 1.4899 i 6.3071 i 18.5559 0.0641 i 5.5319 0.0654
5.5973
i 1.4814
0.0614 1.5428
0.0000 i 5,901.293 5,901.293 0.2605
i 0.0000 i 5,907.805
6 6
i 9
Unmitigated
1.4899 6.3071 18.5559 0.0641 5.5319 0.0654
- 5.5973
1.4814
0.0614 1.5428
0.0000 5,901.293 5,901.293 0.2605
0.0000 5,907.805
6 6
9
4.2 Trip Summary Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
General Office Building ; 4,624.62 1,204.43 498.04 11,424,944 11,424,944
High Turnover (Sit Down Restaurant) ; 174.66 ; 212.23 176.67 245,733 245,733
......................................-----------Y------------------------: -----------------------
;-----------T-----------
Office Park ; 107.90 , 23.23 9.60 276,238 276,238
.................................................. ---------- ----------- ---------------------- ----------------------- -r
,
Quality Restaurant + 1,431.10 , 1,501.27 1148.07 1,994,071 1,994,071
.................................................. ---------- ---------- ---------------------- -----------------------
Strip Mall + 346.92 426.24 215.30 645,827 645,827
Total 6,685.19
3,367.40
2,047.67
14,586,813
14,586,813
4.3 Trip Type Information
CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 23
One Broadway Plaza (Entitled Use) - Orange County, Annual
Date: 3/5/2020 9:53 AM
Miles I Trip % I Trip Purpose %
Land Use I
H-W or C-W I
H-S or C-C I
H-O or C-NW
IH-W or C-W
I H-S or C-C I
H-O or C-NW I
Primary
I Diverted I
Pass -by
General Office Building
16.60
8.40
6.90
33.00
48.00
19.00 {
77
+ 19 +
4
.......................•
High Turnover (Sit Down
- - - - - - - - - - -L
16.60
- - - - - - - - - T
8.40
_ _ _ _ _ _ _ _ _ _
6.90
- - - - - - - _
8.50
--_ _ _ _ _ _ _ _ _ T
I 72.50
_ _ _ _ _ _ _ _ _ _ _
19.00
_ _ _ _ _ _ _ _ _ _
37
_ _ _ _ _ _ _ _ _ _
20
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
43
.......:............... .------------
Office----
Park
16.60
------- ---r-----------r--------'---------
8.40
6.90
33.00
48.00 T
------- ..----
--------------
19.00
82
-�
15 r
----------------
3
Quality Restaurant
16.60
8.40
6.90
Y 12.00
I 69.00
19.00
38
18
44
Strip Mall
16.60
8.40
6.90
16.60
64.40
19.00
45
40
15
4.4 Fleet Mix
Land Use I
LDA
I LDT1 I
LDT2 I
MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
General Office Building
0.555968}
0.043848;
0.210359;
0.116378;
0.016765;
0.005795;
0.025008;
0.016160;
0.001677;
0.001586;
0.004867;
0.000586-
0.001002
r
High Turnover (Sit Down
0.5559681 0.043848: 0.210359: 0.116378: 0.016765: 0.005795: 0.025008: 0.016160: 0.001677: 0.001586: 0.004867: 0.000586:
0.001002
Restaurant)
.. . ..... . ..... . ..... . .. f
_ .... _ _.*-------T-------T-------T-------T-------T-------T-------T-------T-------T-------T-------�
_ ..... _ .
Office Park
0.5559681 0.043848,
0.210359.
0.116378�
0.016765.
0.005795�
0.025008�
0.016160�
0.001677�
0.001586�
0.0048671
0.000586:
0.001002
- - - - - - - - - - - - - - - - - - - - - - - _
- - - - - - --i----------------f----------------f----------------f----------------f----------------f----------------f----------------f----------------f----------------f----------------f----------------+
- - - - - - - -
Quality Restaurant
0.5559681 0.0438481
0.2103591
0.1163781
0.0167651
0.0057951
0.0250081
0.0161601
0.0016771
0.0015861
0.0048671
0.000586.
0.001002
Strip Mall
0.555968. 0.043848'
0.210359'
0.116378'
0.016765'
0.005795'
0.025008'
0.016160'
0.001677'
0.001586'
0.004867,
0.000586'
0.001002
5.0 Energy Detail
Historical Energy Use: N
5.1 Mitigation Measures Energy
CalEEMod Version: CaIEEMod.2016.3.2 Page 12 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
ROG
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
I N20
CO2e
Category
tons/yr
MT/yr
Electricity •I
I I I
1 1 I
I 1
1 I 0.0000
I I
I 0.0000 I
I
I 0.0000
� 0.0000
� 0.0000
I I I
12,560.599 12,560.599 I 0.1057 I 0.0219 i 2,569.759
Mitigated
2 I 2 1 I I 9
•I I I I I I I
...........el-------J-------J-------J-------J-------J-------J-------J-------J
I
1
.....................I-------J
I 1 I I I
------- J------- J-------T .......
Electricity •I
I I I
1 1 I
I 1
1 I 0.0000
I I
I 0.0000 I
I
I 0.0000
0.0000
� 0.0000
1 I I
12,560.599 12,560.599 I 0.1057 I 0.0219 2,569.759
Unmitigated
2 I 2 1 I I 9
I I I I I
II
------------ e------- J------- J------- J------- J------- J------- J-------
I
J------- J-------
1
------------...I
I I I
------- J1-51----- J-------J-------T-------
l
NaturalGas
0.0517 0.4704 0.3951 2.8200e-
0.0358
0.0358
0.0358
0.0358
0.0000
I
512.0670 2.0670 9.8100e- 9.3900e- 515.1099
Mitigated ;i
I I I 003
I I
I I
I
,
i I I 003 I 003 1
I I I I I I I 1
1 I I I
NaturalGas
0.0517 0.4704 0.3951 2.8200e-
- 0.0358
0.0358 -
0.0358
0.0358
0.0000
512.0670 512.0670 9.8100e- - 9.3900e- 515.1099
Unmitigated
003
003 003
CalEEMod Version: CaIEEMod.2O16.3.2 Page 13 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGa
ROG
NOx
CO
SO2
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
tons/yr
MT/yr
General Office
I 1 1 1 1 I 1 1 1 1 1
i 4.64495e •1 0.0251 1 0.2277 1 0.1913 1 1.3700e- 1 1 0.0173 1 0.0173 1 1 0.0173 0.0173 � 0.0000 1 247.8721 1 247.8721 1 4.7500e- 1 4.5400e- 249.3451
Building
i +006 003 1 1 1 1 1 . 1 1 003 1 003 1
'----------1
•1---------------------------------------------------------'• 1--------------1
r-"---71-----"1 ---------1 -1 -1 -1 1 - 1 - 1 � �-------I--"---- 1 -------- 1 - 1 T'------
High Turnover (Sit
695237 .1 3.7500e- 1 0.0341 1 0.0286 1 2.00OOe- 1 1 2.5900e- 1 2.5900e- 1 1 2.5900e- 2.5900e- 0.0000 1 37.1005 1 37.1005 1 7.1000e- 1 6.8000e- i 37.3210
Down Restaurant)
i 003 1 1 1 004 1 1 003 1 003 1 1 003 003 004 1 004 1
--------1
r-"---71-----"•1------------------------------------------------ -------- ------- --"--- --------------'• 1------------------------1
1 1 1 1 1 1 1 1 � �I1 1 1 T'------
Office Park
i 111460 •1 6.00OOe- 1 5.4600e- 1 4.5900e- 1 3.00OOe- 1 1 4.2000e- 1 4.2000e- 1 1 4.2000e- 4.2000e- 0.0000 1 5.9479 1 5.9479 1 1.1000e- 1 1.1000e- i 5.9833
•1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 004 1 004 1
1-------- -------- -------- -------- -------- -------- -------- ----------------------- 1-------- -------- -------
Quality
4.12708e .1 0.0223 1 0.2023 1 0.1699 1 1.2100e- 1 1 0.0154 1 0.0154 1 1 0.0154 0.0154 0.0000 1 220.2366 1 220.2366 1 4.2200e- 1 4.0400e- i 221.5453
Restaurant
i +006 ; 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
__r-"---71'----"1
1 1 1 1 1 1 1 � -, 1 1 1 1 T""-'-
Strip Mall
17050 .1 9.00OOe- 1 8.4000e- 1 7.00OOe- 1 1.00OOe- 1 1 6.00OOe- 1 6.00OOe- 1 1 6.00OOe- 6.00OOe- 0.0000 1 0.9099 1 0.9099 1 2.00OOe- 1 2.00OOe- i 0.9153
1 005 1 004 1 004 1 005 1 1 005 1 005 1 1 005 005 . 1 1 1 005 1 005 1
Total
0.0517
0.4704
0.3951
2.8200e-
0.0358
0.0358
0.0358
0.0358
0.0000
512.0670
512.0670
9.8100e-
9.3900e-
515.1099
003
003
003
CalEEMod Version: CaIEEMod.2O16.3.2 Page 14 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
5.2 Energy by Land Use - NaturalGas
Mitigated
NaturalGa
ROG
NOx
CO
SO2
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
s Use
I
I
PM10
I
PM10
Total
PM2.5
PM2.5
I
Land Use
kBTU/yr
tons/yr
MT/yr
General Office
I 1 1 1 1 I 1 1 1 1 1
i 4.64495e •1 0.0251 1 0.2277 1 0.1913 1 1.3700e- 1 1 0.0173 1 0.0173 1 1 0.0173 0.0173 � 0.0000 1 247.8721 1 247.8721 1 4.7500e- 1 4.5400e- 249.3451
Building
i +006 003 1 1 1 1 1 . 1 1 003 1 003 1
'----------1
•1---------------------------------------------------------'• 1--------------1
r-"---71-----"1 ---------1 -1 -1 -1 1 - 1 - 1 � �-------I--"---- 1 -------- 1 - 1 T'------
High Turnover (Sit
695237 •1 3.7500e- 1 0.0341 1 0.0286 1 2.00OOe- 1 1 2.5900e- 1 2.5900e- 1 1 2.5900e- 2.5900e- 0.0000 1 37.1005 1 37.1005 1 7.1000e- 1 6.8000e- i 37.3210
Down Restaurant)
i 003 1 1 1 004 1 1 003 1 003 1 1 003 003 004 1 004 1
--------1
r-"---71-----"•1------------------------------------------------ -------- ------- --"--- --------------'• 1------------------------1
1 1 1 1 1 1 1 1 � �I1 1 1 T'------
Office Park
i 111460 n 6.00OOe- 1 5.4600e- 1 4.5900e- 1 3.00OOe- 1 1 4.2000e- 1 4.2000e- 1 1 4.2000e- 4.2000e- 0.0000 1 5.9479 1 5.9479 1 1.1000e- 1 1.1000e- i 5.9833
1 004 1 003 1 003 1 005 1 1 004 1 004 1 1 004 004 004 1 004 1
1-------- -------- -------- -------- -------- -------- -------- ----------------------- 1-------- -------- -------
Quality
4.12708e .1 0.0223 1 0.2023 1 0.1699 1 1.2100e- 1 1 0.0154 1 0.0154 1 1 0.0154 0.0154 0.0000 1 220.2366 1 220.2366 1 4.2200e- 1 4.0400e- i 221.5453
Restaurant
i +006 ; 1 1 1 003 1 1 1 1 1 . 1 1 1 003 1 003 1
__r-"---71'----"1
1 1 1 1 1 1 1 � -, 1 1 1 1 T""-'-
Strip Mall
17050 .1 9.00OOe- 1 8.4000e- 1 7.00OOe- 1 1.00OOe- 1 1 6.00OOe- 1 6.00OOe- 1 1 6.00OOe- 6.00OOe- 0.0000 1 0.9099 1 0.9099 1 2.00OOe- 1 2.00OOe- i 0.9153
1 005 1 004 1 004 1 005 1 1 005 1 005 1 1 005 005 . 1 1 1 005 1 005 1
Total
0.0517
0.4704
0.3951
2.8200e-
0.0358
0.0358
0.0358
0.0358
0.0000
512.0670
512.0670
9.8100e-
9.3900e-
515.1099
003
003
003
CalEEMod Version: CaIEEMod.2016.3.2 Page 15 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
5.3 Energy by Land Use - Electricity
Unmitigated
Electricity
Total CO2
CH4
N20
CO2e
Use
Land Use
kWh/yr
MT/yr
General Office
i 7.10972e •1 2,265.308 i 0.0935 0.0194 2,273.412
Building
1 +006 ;: 5 i 7
--�------it------
High Turnover (Sit
i i
*-------
97802.9 •i 31.1621 i 1.2900e- 2.7000e- 31.2736
Down Restaurant)1
003 i 004 1
Office Park
-j- - - - - --- - - - - - -
i 150868 •1 48.0698 i 1.9800e- 4.1000e- 48.2418
003 004
-
Quality
•�- - - - - --- - - - - --
------ii-------
580579 •1 184.9850 i 7.6400e- 1.5800e- 185.6468
Restaurant
i ;� i 003 i 003
---
•�--------------
Strip Mall
97526 •i 31.0739 i 1.2800e- 2.7000e- 31.1850
003 004
Total
2,560.599
71057
0.0219
2,569.759
2
9
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
5.3 Energy by Land Use - Electricity
Mitigated
Electricity
Total CO2
CH4
N20
CO2e
Use
Land Use
kWh/yr
MT/yr
General Office
i 7.10972e •1 2,265.308 i 0.0935 0.0194 2,273.412
Building
1 +006 ;: 5 i 7
High Turnover (Sit
i i
97802.9 •i 31.1621 i 1.2900e- 2.7000e- 31.2736
Down Restaurant)1
003 i 004 1
Office Park
-j- - - - - --- - - - - - -
i 150868 •1 48.0698 i 1.9800e- 4.1000e- 48.2418
003 004
---
Quality
•�- - - - - ---
r------ii------- *-------
580579 •1 184.9850 i 7.6400e- 1.5800e- 185.6468
Restaurant
i ;� i 003 i 003
---
•�--------------
Strip Mall
97526 •i 31.0739 i 1.2800e- 2.7000e- 31.1850
003 004
Total
2,560.599
71057
0.0219
2,569.759
2
9
6.0 Area Detail
6.1 Mitigation Measures Area
No Hearths Installed
CalEEMod Version: CaIEEMod.2016.3.2 Page 17 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
NOx
CO
S02
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
Category
El
tons/yr
MT/yr
Mitigated
6.000Oe- 7.000Oe- 0.0000
3.000Oe- i 3.000Oe- i
i 3.000Oe-
3.000Oe- • 0.0000 i 0.0135 0.0135 i 4.000Oe- 0.0000 0.0144
•�
005 003
005 005
005
005
; 005
Unmitigated 2.2231
6.000Oe- 7.000Oe- 0.0000
- 3.000Oe- - 3.000Oe-
3.000Oe-
3.000Oe- 0.0000 0.0135 0.0135 - 4.000Oe- 0.0000 0.0144
005 003
005 005
005
005
005
6.2 Area by SubCategory
Unmitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
SubCategory
tons/yr
MT/yr
Architectural •i 0.2527 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000
Coating•' ' i
%
----------- ------------------------------------------------------------------------------------------------------------------*-------
Consumer �� 1.9698 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 i 0.0000
Products
Landscaping •i 6.6000e- 6.000Oe- 7.000Oe- 0.0000 3.000Oe- 3.000Oe- 3.000Oe- 3.000Oe- 0.0000 i 0.0135 0.0135 4.000Oe- 0.0000 i 0.0144
i i i i i i
004 005 003 005 005 005 005 . 005 i
Total
2.2231
6.000Oe-
7.000Oe-
0.0000
3.000Oe-
3.000Oe-
3.000Oe-
3.000Oe-
0.0000
0.0135
0.0135
4.000Oe-
0.0000
0.0144
005
003
005
005
005
005
005
CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
6.2 Area by SubCategory
Mitigated
ROG
NOx
CO
S02
Fugitive
Exhaust
PM10
Fugitive
Exhaust
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N20
CO2e
PM10
PM10
Total
PM2.5
PM2.5
I
Subcategory
tons/yr
MT/yr
Architectural •i 0.2527 i � i i � 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000
Coating '�
Consumer •i 1.9698 i � i i � 0.0000 i 0.0000 � i 0.0000 0.0000 � 0.0000 i 0.0000 � 0.0000 i 0.0000 � 0.0000 1 0.0000
Products '� i
Landscaping •i 6.6000e- 6.000Oe- 7.000Oe- 0.0000 3.000Oe- 3.000Oe- 3.000Oe- 3.000Oe- 0.0000 i 0.0135 0.0135 4.000Oe- 0.0000 0.0144
i i i � i
004 005 003 005 005 005 005 005 i
Total
2.2231
6.000Oe-
7.000Oe-
0.0000
3.000Oe-
3.000Oe-
3.000Oe-
3.000Oe-
.00
000
0.0135
0.0135
4.000Oe-
0.0000
0.0144
005
003
005
005
005
005
005
7.0 Water Detail
7.1 Mitigation Measures Water
CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
Total CO2
CH4
N20
CO2e
Category
MT/yr
Mitigated •1 641.5844
i 3.2296 0.0809
i 746.4266
- - - - - - - - - - - % --------------4------------------------------- - - - - - - -
Unmitigated •• 641.5844
3.2296 0.0809
746.4266
7.2 Water by Land Use
Unmitigated
Indoor/Out
Total CO2
CH4
N20
CO2e
door Use
I
Land Use
Mgal
MT/yr
General Office 90.3243 / ■1 599.3586 2.9668 0.0744 i 695.6905
Building 1 55.36 ;
High Turnover (Sit 0.81347 / ■i 3.8168 0.0267 6.6000e- 4.6787
Down Restaurant)10.0519236;i 004
------- ------- -------
Office Park 1.74179 / ■1 11.5579 0.0572 1.4300e- i 13.4155
1.06755 ;i 003
■I - - - - - ---- - - - - -
Quality 4.82922 / ■1 22.6586 0.1582 3.9000e- 27.7754
Restaurant 0.308248 ;i 003
------ ---- ■�--------- - - - --
Strip Mall 13.631839 / ■i 4.1927 0.0208 5.2000e- 4.8665
0.387256 ;i 004
Total
641.5844
3.2296
0.0809
746.4266
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
7.2 Water by Land Use
Mitigated
Indoor/Out
Total CO2
CH4
N20
CO2e
door Use
Land Use
Mgal
MT/yr
General Office
1 90.3243 / •1 599.3586 2.9668 0.0744 i 695.6905
Building
i 55.36
i .1
High Turnover (Sit
0.81347 / •i 3.8168 0.0267 6.6000e- 4.6787
Down Restaurant)�0.0519236:1
i 004
-- - - - - - - - - - - - - - -
Office Park
i 1.74179 / •1 11.5579 0.0572 1.4300e- i 13.4155
1.06755 ;i 003
��--------- - - - --
Quality
4.82922 / •i 22.6586 0.1582 3.9000e- 27.7754
Restaurant
i 0.308248 ;i i 003
-----------------
Strip Mall
0.631839 / •i 4.1927 0.0208 5.2000e- 4.8665
0.387256 ;i 004
Total
641.5844
3.2296
0.0809
746.4266
8.0 Waste Detail
8.1 Mitigation Measures Waste
CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
CategoryNear
Total CO2
CH4
N20
CO2e
MT/yr
Mitigated •i 109.0285 i 6.4434 i 0.0000
1 270.1134
- - - - - - - - - - -% --------------+--------------} ------ * - - - - - - -
Unmitigated •• 109.0285 6.4434 0.0000
270.1134
8.2 Waste by Land Use
Unmitigated
Waste
Total CO2
CH4
N20
CO2e
Disposed
Land Use
tons
MT/yr
General Office 472.63 •1 95.9396 5.6699 0.0000 i 237.6863
Building ;
i
__________------ �1------- -------------- r_______
High Turnover (Sit 31.89 -i 6.4734 0.3826 0.0000 16.0375
Down Restaurant) ;
------- -------
Office Park 9.11 :i 1.8493 0.1093 0.0000 i 4.5814
i :I i
___r------it---------------------T-------
Quality 14.52 -1 2.9474 0.1742 0.0000 7.3021
Restaurant i ;
Strip Mall 8.96 �i 1.8188 0.1075 0.0000 i 4.5060
ETotal
109.0285
1 6.4434
1 0.0000
270.1134
CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
8.2 Waste by Land Use
Mitigated
waste
Total CO2
CH4
N20
CO2e
Disposed
Land Use
tons
MT/yr
General Office
1 472.63 •1 95.9396 5.6699 0.0000 i 237.6863
Building
i •�
•� -'-------'-------
High Turnover (Sit
31.89 •1 6.4734 0.3826 0.0000 16.0375
Down Restaurant)
•�
i ' - - - - - - -'- - - - - - -
Office Park
i 9.11 •1 1.8493 0.1093 0.0000 i 4.5814
- ' - - - - - - -'- - - - - - -
Quality
14.52 •i 2.9474 0.1742 0.0000 7.3021
Restaurant
•�
i • -'-------'-------
Strip Mall
i 8.96 •i 1.8188 0.1075 0.0000 i 4.5060
Total
109.0285
6.4434
0.0000
270.1134
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type
Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type
CalEEMod Version: CaIEEMod.2016.3.2 Page 23 of 23 Date: 3/5/2020 9:53 AM
One Broadway Plaza (Entitled Use) - Orange County, Annual
User Defined Equipment
Equipment Type Number
11.0 Vegetation
ATTACHMENT 6
AIR QUALITY EMISSIONS PRESENTED IN THE FEIR
13142-05 AQ & GHG Memo
Lli► URBAN
Table 3.4-7
Total Proiect Emissions
Pollutant Emissions lbs/da
CO
ROG
NOx
PMip
SO,
Vehicular Trips
458.41
31.22
54.21
7.93
39.50
Natural Gas Consumption
0.73
0.19
4.39
0.01
0.00
Electrical Generation
3.03
0.15
17.45
0.61
1.82
Total Project Emissions
462.2
31.6
76.1
8.5
41.3
SCAQMD Thresholds
550
55
55
150
150
Source: Mestre Greve Associates, 2002.
Table 3.4-7 shows that the total project emissions, specifically NO., exceed the SCAQMD
Thresholds. Since the project emissions are above the significance thresholds, the project will
result in a significant regional air quality impact. Long-term mitigation measures are
recommended in Section 3.4.5.
3.4.4 COMPLIANCE WITH AIR QUALITY PLANNING
The following sections
deal with the
major air planning
requirements
for this
project.
Specifically, consistency
of the project
with the AQMP is
addressed. As
discussed
below,
consistency with the AQMP is a requirement of the California Environmental Quality Act
(CEQA).
3.4.4.1 Consistency with AQMP
An EIR must discuss any inconsistencies between the proposed project and applicable GPs and
regional plans (California Environmental Quality Act (CEQA) guidelines (Section 15125)).
Regional plans that apply to the proposed project include the South Coast Air Quality
Management Plan (AQMP). In this regard, this section will discuss any inconsistencies between
the proposed project with the AQMP.
The purpose of the consistency discussion is to set forth the issues regarding consistency with the
assumptions and objectives of the AQMP and discuss whether the project would interfere with
the region's ability to comply with federal and state air quality standards. If the decision -maker
determines that the project is inconsistent, the lead agency may consider project modifications or
F:\WPSHARE\one-broadway\Report\Section 3.0 split\Sect 3.4.doc 3.4-20
July 22, 2003
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Appendix B Project Trip Generation Memo
Apri12020
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Thi page intenlionalyleft blank.
PlaceWorks
UO►URBAN
April 16, 2020
Mr. Mike Harrah
Caribou Industries, Inc.
1103 N. Broadway
Santa Ana, CA 92701
260 E. Baker St. I Suite 200 1 Costa Mesa, CA 92626 1 (949) 660-1994
urbanxroads.com
SUBJECT: ONE BROADWAY PLAZA TRIP GENERATION EVALUATION
Dear Mr. Mike Harrah:
Urban Crossroads, Inc. is pleased to provide the following Trip Generation Evaluation for One Broadway
Plaza development which is located on the northeast corner of Broadway and 101" Street in the City of
Santa Ana. The purpose of this work effort is to assess the potential changes in trip generation associated
with the update to the uses proposed for the Project. The Project consists of the development of 415
multifamily residential dwelling units in place of 318,153 square feet of office use.
BACKGROUND
The Project is proposing to amend the General Plan Land Use Element to allow the development of
residential uses (at the density/intensity proposed) for the One Broadway Plaza District Center (OBPDC)
Specific Development District (SD) 75. Currently, SD75 allows for the development of a 37-story tower
with 518,000 square feet of office uses, a destination restaurant at the top two levels of the tower, and
residential uses are not currently permitted. The following trip generation assessment is in support of
the proposed addendum to the Environment Impact Report (EIR).
CURRENTLY APPROVED PROJECT
The previous Project traffic analysis was prepared in February 2002 One Broadway Plaza EIR Traffic
Impact Study, prepared by P&D Consultants, referred to as 2002 Traffic Study). The 2002 Traffic Study
evaluated 545,124 square feet of office use within a 37-story building and surrounding rehabilitated
structures, which are broken down by use below in Table 1. The Project also includes an 8-level
freestanding parking structure with approximately 2,100 parking spaces.
TABLE 1: CURRENTLY APPROVED ONE BROADWAY PLAZA LAND USE STATISTICAL SUMMARY
Land Use
Square Feet'
Office Building
508,200
Rehabilitated Office
9,803
Retail
8,525
Formal Dining
15,915
Casual Dining
2,681
Total
545,124
' Source: One Broadway Plaza EIR Traffic Impact Study, P&D Consultants, February 2002.
13141-05 TG Letter
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 2 of 6
The trip generation from the 2002 Traffic Study was calculated based on the Institute of Transportation
Engineers (ITE) Trip Generation Manual, 6th Edition (1997) and the ITE Trip Generation Handbook — An
ITE Proposed Recommended Practice (October 1998). As shown in Table 2, the 2002 Traffic Study
concluded that the Project would generate 6,686 trip -ends per day, with 744 trips generated during the
AM peak hour and 819 trips generated during the PM peak hour.
TABLE 2: CURRENTLY APPROVED PROJECT TRIP GENERATION SUMMARY
AM Peak Hour
PM Peak Hour
Land Use
Quantity
Units'
In
Out
Total
In
Out
Total
Daily
Office (Tower)
508.200
TSF
600
82
682
110
539
649
4,625
Office (Rehabilitated Structures)
9.803
TSF
13
2
15
2
12
14
108
Retail (Tower & Garage)
8.525
TSF
11
11
22
9
13
22
347
Casual Dining (Rehabilitated Structures)
2.681
TSF
6
6
12
9
6
15
175
Formal Dining (Tower)
15.915
TSF
7
6
13
80
39
119
1,432
Total Project 2
637
107
744
211
609
819
6,686
1 TSF=thousand square feet
Z Source: One Broadway PlazaEIRTrafficImpact Study
PROPOSED PROJECT
The Project is proposing to develop a mixed -use development with both residential and office uses at
One Broadway Plaza. The Project requires a General Plan Land Use Element amendment to permit
residential development within the OBPDC. The One Broadway Plaza building includes 518,000 square
feet of office uses. Approximately 60% (318,153 square feet) is proposed for a total of 415 apartment
units.
Table 3 presents the trip generation rates obtained from the ITE Trip Generation Manual (loth Edition,
2017) for the proposed multifamily housing use and the remaining other office, retail, and restaurant
uses originally contemplated. The ITE trip generation rate utilized for the multifamily housing is for
developments located within City Center Core areas (as opposed to rates for developments within a
general urban/suburban setting). The average rates for General Office uses located within City Center
Core areas has also been utilized to estimate the trip generation for the office uses proposed in the
tower, while the average rates for General Office located within general urban/suburban areas have
been used to estimate traffic for the rehabilitated structures. The latest ITE Trip Generation Manual
does not provide any trip rate data for Specialty Retail, as such, the average rates for the Shopping Center
land use (ITE Code 820) have been utilized. Similar to the 2002 Traffic Study, an AM inbound and
outbound split is not reported for the Quality Restaurant land use. As such, a 50%/50% split has been
assumed for the AM peak hour, consistent with the 2002 Traffic Study.
13141-05 TG Letter OURBAN
CROSSROADS
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 3 of 6
TABLE 3: ITE TRIP GENERATION RATES
Land Use'
Units'
ITE LU
Code
AM Peak Hour
PM Peak Hour
Daily
In
Out
Total
In
Out
Total
Multifamily Housing (High-Rise)3
DU
222
0.08
0.14
0.22
0.13
0.10
0.23
2.16
General Office 4
TSF
710
0.43
0.07
0.50
0.07
0.36
0.43
4.30
General Offices
TSF
710
1.00
0.16
1.16
0.18
0.97
1.15
9.74
Shopping Center
TSF
820
0.58
0.36
0.94
1.83
1.98
3.81
37.75
Quality Restaurant6
TSF
931
0.37
0.37
0.73
5.23
2.57
7.80
83.84
High Turnover (Sit -Down) Restaurant
TSF
932
5.47
4.47
9.94
6.06
3.71
9.77
112.18
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual. Tenth Edition (2017).
Z DU=dwelling units; TSF=thousand square feet
3 Based on average rates for developments located within Center City Core areas.
4 Based on average rates for ITE Land Use Code 710 for developments located within Center City Core areas (using 253,728 square feet).
Daily trip generation rate not available in ITE Trip Generation Manual. Estimated based on 10 times the PM peak hour.
5 Based on average rates for ITE Land Use Code 710.
6 ITE Trip Generation Manual does not provide in/out split for the AM peak hour; as such, a 50/50 split has been assumed.
The resulting trip generation for the proposed Project is shown on Table 4. Pass -by reduction
assumptions for the shopping center, quality restaurant, and high turnover (sit-down) restaurant uses
are consistent with the current ITE Trip Generation Handbook (3rd Edition, 2017). A 5% reduction has
also been applied to account for transit mode share, consistent with other projects in the City of Santa
Ana. As shown in Table 4, the proposed Project is estimated to generate 2,792 trip -ends per day with
234 AM peak hour trips and 301 PM peak hour trips.
13141-05 TG Letter
OURBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 4 of 6
TABLE 4: PROPOSED PROJECT TRIP GENERATION SUMMARY
Land Use
Quantity
Units'
AM Peak Hour
PM Peak Hour
Daily
In
Out
Total
In
Out
Total
Multifamily Housing (High -Rise) (Tower)
415
DU
35
57
92
55
40
95
896
Office (Tower)
190.047
TSF
82
13
95
13
69
82
818
Office (Rehabilitated Structures)
9.803
TSF
10
2
12
2
9
11
96
Shopping Center (Tower & Garage_) 8.525 TSF
- - - - - - - - - - - - - - - - Pass -by Reduction (PM/Daily: 34%):
5
- 0
3
0
8
0-_---_
16
-5
17
-5
33
-10
322
-110
Shopping Center Total:
5
3
8
11
12
23
212
Quality Restaurant (Tower) 15.915 TSF
Pass -by Reduction (PM/Daily: 44%):
6
0
6
0
12
0
83
-18
41
-18
124
-36
1,334
-588
Quality Restaurant Total:
6
6
12
65
23
88
746
High Turnover (Sit -Down) Restaurant
(Rehabilitated Structures) 1__2._681__J___TS_F_
Pass -by Reduction (PM/Daily: 43%):
15
0
12
0
27
0
16
-4
10
-4
26
-8
302
-130
High Turnover (Sit -Down) Restaurant Total:
15
12
27
12
6
18
172
Transit Mode Share Reduction (5%):
-8
-5
-12
-8
-8
-16
-148
Proposed Project Total
145
88
234
150
151
301
2,792
1 DU=dwelling units; TSF =thousand squarefeet
PROJECT TRIP GENERATION COMPARISON
As shown in Table 5, the development of the proposed Project is anticipated to generate 3,894 fewer
trip -ends per day with 510 fewer AM and 518 fewer PM peak hour trips as compared to the currently
approved Project. This equates to a 69% reduction during the AM, and 63% reduction during the PM
peak hours and a 58% reduction to daily trip -ends.
TABLE 5: TRIP GENERATION COMPARISON
Project
AM Peak Hour
PM Peak Hour
Daily
In
Out
Total
In
Out
Total
Currently Approved
637
107
744
211
609
819
6,686
Proposed Project
145
88
234
150
151
301
2,792
Variance
-492
-19
-510
-61
-458
-518
-3,894
1 Trip generation based on the currently approved Project per the 2002 Traffic Study (see Table 2).
Z Proposed Projecttrip generation (seeTable4).
13141-05 TG Letter
OURBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 5 of 6
CITY OF SANTA ANA VMT SCREENING
As stated in the City of Santa Ana Traffic Impact Study Guidelines (September 2019), projects may be
screened out from completing a full VMT analysis if they have the potential to reduce VMT/SP and would
consequently result in a less -than -significant transportation impact. In other words, the project should
have the potential to reduce VMT/SP and be consistent with the Regional Transportation Plan (RTP) /
Sustainable Communities Strategy's (SCS) in order to be initially screened out. Projects located within
Transit Priority Areas (TPAs) and low-VMT generating Traffic Analysis Zones (TAZ) have the potential to
reduce VMT/SP and are consistent with the RTP/SCS. As illustrated in Appendices A and B of the City of
Santa Ana Traffic Impact Study Guidelines, the proposed Project is located in a TPA and low-VMT
generating TAZ.
The Project is proposed to develop residential, office, retail, and restaurant uses. The mixed -use nature
of the Project promotes low-VMT generation within the TAZ as well as the overall City. As discussed with
the City of Santa Ana Planning Department, an increase of approximately 5,406 households is projected
for the City based on the Orange County Transportation Analysis Model (OCTAM) from the base year of
2016 to the forecasted year of 2045. As such, the households proposed by the Project would be
consistent with the growth anticipated in the RTP/SCS for the City. Orange County currently experiences
a high demand and low supply of households in the region and the proposed Project would have the
potential to serve the regional demand for households and is therefore consistent with the goals and
objectives of the RTP/SCS.
CONCLUSION
Appendix B-1 of the 2017 Orange County Transportation Authority (OCTA) Congestion Management
Program (CMP) identifies a change of three percent or more to the level of service (LOS) standard as a
significant impact. The AM and PM peak hour intersection operations analysis are used to identify an
intersection's LOS during the peak hours. Since the proposed Project would result in a net reduction to
the AM and PM peak hour trips in comparison to currently approved Project, the impacts are anticipated
to be the same or less than those previously identified at off -site study area intersections. Therefore,
no additional traffic -related impacts are anticipated as a result of the proposed development that is
currently being contemplated in addition to those previously disclosed in the EIR. If you have any
questions, please contact me directly at (949) 336-5987.
13141-05 TG Letter
OURBAN
Mr. Mike Harrah
Caribou Industries, Inc.
April 16, 2020
Page 6 of 6
Respectfully submitted,
URBAN CROSSROADS, INC.
C62
" c;r--
Charlene So, PE Haseeb Qureshi
Associate Principal Associate Principal
13141-05 TG Letter
OURBAN
13141-05 TG Letter OURBAN
CROSS ROADS
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Appendix C Water and Sewer Studies
Apri12020
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM
CITY OF SANTA ANA
Appendix
Thi page intenlionalyleft blank.
PlaceWorks
WATER AND SEWER COMPARISON
For
ONE 6 R OA D WAY PLAZA
Prepared for. -
CARIBOU INDUSTRIES, INC.
1103 N. Broadway
Santa Ana, CA 92701
Prepared by:
DMc ENGINEERING
CIVIL • SURVEYING • PLANNING • CONSTRUCTION
18 Technology Drive, Suite 100
Irvine, CA 92618
949.753.9393
Derek J. McGregor, PE, PLS
March 3, 2020
J N 1262-05
WATER & SEWER COMPARISON
ONE BROADWAY PLAZA
SANTA ANA, CALIFORNIA
TABLE OF CONTENTS
I. INTRODUCTION.................................................................................................1
II. CURRENT ENTITLED CONDITION..................................................................2
III. PROPOSED REVISED ENTITLED CONDITION.............................................3
IV. REFERENCES.....................................................................................................4
1
WATER & SEWER COMPARISON
ONE BROADWAY PLAZA
SANTA ANA, CALIFORNIA
INTRODUCTION
The purpose of this report is to compare the current entitled water and wastewater
demands for the reuse project titled One Broadway Plaza located at 10' & Broadway in
Santa Ana to the proposed revised entitled condition's water and wastewater demands.
The current entitled project does not include a residential component and the proposed
revised entitled project will include residential units. Multiple documents and data were
reviewed in preparation of this comparison that included: Final Environmental Impact
Report for One Broadway Plaza, City of Santa Ana Water and Sewer Design Guidelines,
City of Santa Ana Transit Zoning Code EIR, the City of Santa Ana Water Master Plan, the
City of Santa Ana Sewer Master Plan and regional generation factors.
WATER & SEWER COMPARISON
ONE BROADWAY PLAZA
SANTA ANA, CALIFORNIA
II. CURRENT ENTITLED CONDITION
The property as currently entitled, consists of a mixed -use high-rise with offices &
executive office suits and various other uses. The section below describes the current
entitled demand for domestic water and wastewater service.
WATER SERVICE
There is a 12" water line adjacent to the project site in N. Broadway.
Land Use
Unit Water Demand Factor (1)
Area
Daily water Usage
(square feet)
(gpd
Mixed -use
0.09gpd/sf
518,003 sf
46,621
Notes:
Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.09 gpd/sf)
As shown above current entitled water demand at the project site is estimated to be
approximately 46,621 gallons per day (gpd).
WASTEWATER SERVICE
There is a 15" sewer line adjacent to the project site in N. Broadway.
Land Use
Unit Water Demand Factor (1)
Area
Average Sewer Flow (gpd)
(square feet
Mixed -use
0.0765gpd/sf
518,003 sf
39,628
Notes:
Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.0765 gpd/sf)
As shown above existing average sewer flow at the project site is estimated to be
approximately 39,628 gallons per day (gpd).
2
WATER & SEWER COMPARISON
ONE BROADWAY PLAZA
SANTA ANA, CALIFORNIA
III. PROPOSED REVISED ENTITLED CONDITION
The proposed revised entitled project consists of a mixed -use high-rise with offices &
executive office suits and various other uses along with residential apartments. The
section below describes the proposed revised entitled project's demand for domestic
water and wastewater service.
WATER SERVICE
Land Use
Unit Water
Project DU, capita or
Daily water Usage
Demand Factor
Square Footage(gpd)
Offices Commercial
0.09gpd/sf (')
259,002 sf
23,311
Apartments (High -Rise
110 gpd/capita (2)
440 capita (3)
48,400
Residential — 415 Apartments
Total Proposed Revised
Entitled Water Demand
71,711
Total Current Entitled Water Flow
46,621
Project Net Water Demand Proposed -Current
+ 25,090
Notes:
(1) Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.09 gpd/sf)
(2) Unit Water Demand Factors was taken from the City of Santa Ana Water and Sewer Design Guidelines (110 gpd/capita)
(3) Capacity was assumed at 1 person per bedroom (440 capita) for the 415 apartments
As shown above, the proposed revised entitlements daily water demand is estimated to
be approximately 71,711 gallons per day (gpd).
WASTEWATER SERVICE
Total Peak
Unit Water
Project DU,
Total Average
Flow
Land Use
Demand Factor (1)
capita or Square
Wastewater
Wastewater
Footage
Generation (gpd)
Generation
cfs (2)
Offices (Commercial)
0.0765 gpd/sf
259,002 sf
19,814 gpd
0.09 cfs
Apartments (Residential)
127.5gpd/unit
415 units
52,913 gpd
0.25 cfs
Total Proposed
Revised Entitled Wastewater Demand
72,727 gpd
0.34cfs
Total Current Entitled Wastewater Flow
39,628gpd
0.18 cfs
Project Net Wastewater Flow Proposed -Current
+ 33,099 gpd
I + 0.16 cfs
Notes:
(1) Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.0765 gpd/sf & 127.5 gpd/unit)
(2) Peak Flow = 3' Average Daily Flow
As shown above, the proposed revised entitlements average sewer flow is estimated to
be approximately 72,727 gallons per day (gpd).
3
WATER & SEWER COMPARISON
ONE BROADWAY PLAZA
SANTA ANA, CALIFORNIA
IV. REFERENCES
1. City of Santa Ana Sewer Master Plan Final Report. Santa Ana: City of Santa Ana
Public Works, December 2016.
2. City of Santa Ana 2017 Water Master Plan. Santa Ana: City of Santa Ana Public
Works, January 2018.
3. City of Santa Ana Design Guidelines for Water and Sewer Facilities. Santa Ana:
City of Santa Ana Public Works, March 2017.
4. City of Santa Ana Disinfection Guidelines for Water Facilities. Santa Ana: City of
Santa Ana Public Works, March 2017.
5. City of Santa Ana Engineering CAD Standards Version 2.1. Santa Ana: City of
Santa Ana Public Works, February 2010.
6. City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR. PBS&J, May
2010.
7. Final Environmental Impact Report for One Broadway Plaza. P&D Consultants,
August 2004.