My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER & SEWER COMPARISON <br />ONE BROADWAY PLAZA <br />SANTA ANA, CALIFORNIA <br />II. CURRENT ENTITLED CONDITION <br />The property as currently entitled, consists of a mixed -use high-rise with offices & <br />executive office suits and various other uses. The section below describes the current <br />entitled demand for domestic water and wastewater service. <br />WATER SERVICE <br />There is a 12" water line adjacent to the project site in N. Broadway. <br />Land Use <br />Unit Water Demand Factor (1) <br />Area <br />Daily water Usage <br />(square feet) <br />(gpd <br />Mixed -use <br />0.09gpd/sf <br />518,003 sf <br />46,621 <br />Notes: <br />Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.09 gpd/sf) <br />As shown above current entitled water demand at the project site is estimated to be <br />approximately 46,621 gallons per day (gpd). <br />WASTEWATER SERVICE <br />There is a 15" sewer line adjacent to the project site in N. Broadway. <br />Land Use <br />Unit Water Demand Factor (1) <br />Area <br />Average Sewer Flow (gpd) <br />(square feet <br />Mixed -use <br />0.0765gpd/sf <br />518,003 sf <br />39,628 <br />Notes: <br />Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.0765 gpd/sf) <br />As shown above existing average sewer flow at the project site is estimated to be <br />approximately 39,628 gallons per day (gpd). <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.