Laserfiche WebLink
Molly Mell, PE <br />Task Manager — Construction Support Services <br />Ms. Mell has over 25 years of experience in civil engineering construction <br />management. She has provided construction management and <br />administration services for a variety of infrastructure improvement <br />projects that involved coordination and community between the agencies, <br />contractor and utility companies. <br />EXPERIENCE <br />Fred Waring Drive Utility Undergrounding, City of Palm Desert, CA. <br />Project Engineer. Construction engineering services included contract <br />document interpretation, construction project meetings, coordinating with <br />inspectors, responding to requests for information, providing oversight on <br />construction scheduling, providing quantity verification, and monitoring <br />general site conditions. <br />Education: <br />B.S., Civil Engineering, <br />University of Redlands, <br />Redlands, 1992 <br />Registrations: <br />Registered Civil Engineer, <br />California, No. 59104, 1999 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />25 <br />Years with Tetra Tech: <br />Fred Waring Drive Masonry Block Wall, City of Palm Desert, CA. 125 <br />Project Engineer. Construction engineering services included contract <br />document interpretation, construction project meetings, coordinating with inspectors, responding to requests for <br />information, providing oversight on construction scheduling, providing quantity verification, and monitoring <br />general site conditions. <br />1-710/Firestone Boulevard Interchange, City of South Gate, Caltrans District 7, CA. Design Engineer. <br />Construction engineering services included contract document interpretation, construction project meetings, <br />coordinating with inspectors, coordinating testing and reviewing results, logging and reviewing shop drawing <br />submittals, responding to requests for information, providing oversight on construction scheduling, providing <br />quantity verification, and monitoring general site conditions. <br />Harbor Scenic Drive Construction, Port of Long Beach, Long Beach, CA. As part of the Pier J <br />reconstruction, this preliminary design project involved a study of the feasibility of the relocation of Harbor <br />Scenic DriveNVay to allow for space for the new ITS railroad. Included were relocation layouts for the street, <br />public fishing area, and THUMS crew boat parking and other facilities. Also included was the preparation of <br />colorized staging exhibits, a preliminary design report, and coordination with designers for the rail yard and <br />grade separation with the Port of Long Beach. <br />US-101Nictoria Avenue Interchange, City of San Buena Ventura, Caltrans District 7, CA. Design Engineer. <br />Construction engineering services included contract document interpretation, coordinating testing and reviewing <br />results, logging and reviewing shop drawing submittals, responding to requests for information, providing <br />oversight on construction scheduling and providing quantity verification. <br />TETRA TECH <br />