Molly Mell, PE
<br />Task Manager — Construction Support Services
<br />Ms. Mell has over 25 years of experience in civil engineering construction
<br />management. She has provided construction management and
<br />administration services for a variety of infrastructure improvement
<br />projects that involved coordination and community between the agencies,
<br />contractor and utility companies.
<br />EXPERIENCE
<br />Fred Waring Drive Utility Undergrounding, City of Palm Desert, CA.
<br />Project Engineer. Construction engineering services included contract
<br />document interpretation, construction project meetings, coordinating with
<br />inspectors, responding to requests for information, providing oversight on
<br />construction scheduling, providing quantity verification, and monitoring
<br />general site conditions.
<br />Education:
<br />B.S., Civil Engineering,
<br />University of Redlands,
<br />Redlands, 1992
<br />Registrations:
<br />Registered Civil Engineer,
<br />California, No. 59104, 1999
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />25
<br />Years with Tetra Tech:
<br />Fred Waring Drive Masonry Block Wall, City of Palm Desert, CA. 125
<br />Project Engineer. Construction engineering services included contract
<br />document interpretation, construction project meetings, coordinating with inspectors, responding to requests for
<br />information, providing oversight on construction scheduling, providing quantity verification, and monitoring
<br />general site conditions.
<br />1-710/Firestone Boulevard Interchange, City of South Gate, Caltrans District 7, CA. Design Engineer.
<br />Construction engineering services included contract document interpretation, construction project meetings,
<br />coordinating with inspectors, coordinating testing and reviewing results, logging and reviewing shop drawing
<br />submittals, responding to requests for information, providing oversight on construction scheduling, providing
<br />quantity verification, and monitoring general site conditions.
<br />Harbor Scenic Drive Construction, Port of Long Beach, Long Beach, CA. As part of the Pier J
<br />reconstruction, this preliminary design project involved a study of the feasibility of the relocation of Harbor
<br />Scenic DriveNVay to allow for space for the new ITS railroad. Included were relocation layouts for the street,
<br />public fishing area, and THUMS crew boat parking and other facilities. Also included was the preparation of
<br />colorized staging exhibits, a preliminary design report, and coordination with designers for the rail yard and
<br />grade separation with the Port of Long Beach.
<br />US-101Nictoria Avenue Interchange, City of San Buena Ventura, Caltrans District 7, CA. Design Engineer.
<br />Construction engineering services included contract document interpretation, coordinating testing and reviewing
<br />results, logging and reviewing shop drawing submittals, responding to requests for information, providing
<br />oversight on construction scheduling and providing quantity verification.
<br />TETRA TECH
<br />
|