Laserfiche WebLink
A partial list of projects performed by BRADY containing similar scope details, and contact <br />information are summarized in the table below. <br />PRbJE,TSCOPE <br />O WORK <br />= ' PR�JET <br />REFERENCE<-' <br />40CATION:, <br />TEAM .- ... <br />CNTA4C= . <br />35 MG Earl Thomas <br />Design and Construction Administration <br />Richard Brady, PE <br />Mike Wallace <br />Reservoir/Clty of San Diego <br />619/419-6984 <br />21.5 MG Overmyer <br />2 small reservoirs were demolished <br />Richard Brady, PE <br />Debbie DeBow <br />Reservoir/City of <br />(1 and 1.SMG) and a 21.5 MG <br />Lee Biggers, SE <br />714/536-5528 <br />Huntington Beach <br />reservoir was rehabilitated; design and <br />construction administration <br />5.0 MG HP Reservoir <br />Design -build for the rehabilitation of a <br />Richard Brady, PE <br />Randy Whitman <br />Rehabilitation <br />5.0 MG prestressed concrete reservoir <br />Lee Biggers, SE <br />760/597-3187 <br />originally constructed in 1961 <br />2-21MG Regulating <br />Design and Construction Administration <br />Richard Brady, PE <br />Norm Pierce <br />Reservoirs/City of San Diego <br />619/987-1915 <br />(retired) <br />7.5 MG Prestressed <br />Design of the new Prestressed Concrete <br />Richard Brady, PE <br />Bob Critchfield <br />Concrete Reservoir/City of <br />Reservoir <br />Lee Biggers, SE <br />909/291-2930 <br />Upland <br />5.0 MG Reservoir and <br />Design -build for the rehabilitation of a <br />Richard Brady, PE <br />Temo Galvez <br />Booster Pump Station/City <br />5.0 MG prestressed concrete reservoir <br />Lee Biggers, SE <br />714/593-4517 <br />of Fountain Valley <br />originally constructed in 1972 <br />10 MG San Antonio Park <br />Structural review and rehabilitation <br />Richard Brady, PE <br />Bob Critchfield <br />Reservoir Evaluation/City of <br />analysis study <br />Lee Biggers,. SE <br />909/291-2930 <br />Upland <br />Amanda Del Bello, PE <br />5.0 MG HB Reservoir <br />Design -build for the rehabilitation of a <br />Richard Brady, PE <br />Greg Keppler <br />Rehabilitation <br />5.0 MG prestressed concrete reservoir <br />Lee Biggers, SE <br />760/597-3136 <br />originally constructed in 1961 <br />Amanda Del Bello, PE <br />20 MG Pechstein Reservoir <br />Structural review and roof rehabilitation <br />Richard Brady, PE <br />Greg Keppler <br />Rehabilitation <br />analysis study <br />Lee Biggers, SE <br />760/597-3136 <br />Amanda Del Bello, PE <br />7.5 MG Pritzker Tank Interim <br />Design/Build Fix <br />Richard Brady, PE <br />Bob Critchfield <br />Repair <br />Lee Biggers, SE <br />909/291-2930 <br />6;0 MG Peters Canyon <br />Evaluation of Roof Replacement <br />Richard Brady, PE <br />Lisa Ohlund <br />Reservoir/East Orange <br />Alternatives <br />Lee Biggers, SE <br />949-842-3351 <br />County Water District <br />10 MG El Morro II/Laguna <br />Structural review and rehabilitation <br />Richard Brady, PE <br />David Youngblood <br />County Water District <br />analysis study <br />Jacob Finder, PE <br />949-342-1440 <br />Lee Biggers, SE <br />2-1 MG Reservoirs and 1 at <br />Structural review and rehabilitation <br />Richard. Brady, PE <br />Mark Reifer <br />10MG/California American <br />analysis study, design for improvements <br />Lee Biggers, SE <br />626-614-2517 <br />Water <br />Jacob Finkler, PE <br />2-8 MG Reservoirs <br />Structural review and rehabilitation <br />Richard Brady, PE <br />Scott Miller <br />analysis study <br />Lee Biggers, SE <br />714-548-3693 <br />Amanda DeI Bello, PE <br />0 <br />RICHARD BRADY &ASSOCIATES, INC. 13 <br />