My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICHARD BRADY & ASSOCIATES, INC-A-2020-064
Clerk
>
Contracts / Agreements
>
R
>
RICHARD BRADY & ASSOCIATES, INC-A-2020-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 11:06:20 AM
Creation date
5/6/2020 4:05:37 PM
Metadata
Fields
Template:
Contracts
Company Name
RICHARD BRADY & ASSOCIATES, INC
Contract #
A-2020-064
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Insurance Exp Date
7/1/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRADY Richard Brady E, BCEE <br />Principal in -Charge & Project &larnag"er <br />Fitter Valve Upgrades and Rehabilitation, Robert & Perdue Water Treatment Plant <br />Client: Sweetwater Authority <br />Title: Project Manager <br />Design for upgrades to existing filter backwash facilities at the 30 IVIGD Robert A. Perdue WTP, and preparation of <br />design drawings and specifications for replacement all valves, operators, backwash piping, and electrical supply <br />piping. Performed field surveys of all existing backwash piping, control system equipment. and physical facilities. <br />and conducted an investigation Into an existing air release problem in the filters. <br />Eastside Reservoir Project -Secondary Inlet <br />Client, Matropolitan Water District of Southern California <br />Member of the Value Engineering (VE) team. which reviewed the 30',design of a 96-inch diameter secondary inlet <br />pipeline, tunnel, shaft, and outlet structure. <br />Eastside Reservoir Project- Inlel/Outlet Tower <br />Client: Metropolitan Water District of Southern California <br />Member of VE team which reviewed the 90°4, design of a 260-foot high concrete shaft type outlet structure for the <br />800.000 ac-ft Eastside Reservoir and associated facilities, including 144-inch pipelines, tunnel and butterfly <br />valves, hoists, fish screens, bulkheads, and an access bridge. <br />Eastside Reservoir Project P-1 Pumping Facility <br />Client Metropolitan Water District of Southern California <br />Member of the VE team which reviewed the 90'S design of a 2,100 cfs pumping station that included 12 4.5 NIW <br />variable speed pumps, large diameter piping and valving, chlorination equipment. and a pressure control facility. <br />South Bay Flow Control Facilities <br />Client San Diego County Water Authority <br />Title: Construction Manager <br />Project consisted of four separate flow control facilities and pipeline projects. Project included construction of <br />pipelines up to 48-inches and concrete and block buildings that house large diameter valves and controls. which <br />regulate flow deliveries to various member agencies of the Authority. Projects were coordinated between several <br />water agencies and have a total construction cost of over $6 million. <br />San Caries Pump Station Rehabilitation Project <br />Client City of San Diego, Water Utilities Department <br />Title: Project Manager <br />Replacement of existing pump station with a new 3.900 gam, 210 HP facility. including a 140 kw natural gas <br />driven generator. <br />Drinking Water Quality Improvement Program <br />Client City of San Diego Water Utilities Department. <br />Title: Project Manager <br />Prepared reports addressing City-wide issues of water supply and transmission, water quality, environmental <br />considerations, specific predesign reports for the Alvarado 1200 nrgch and Miramar (215 mgd) WTPs, and master <br />planning for the Lower Otay (60 rngdl and North City (60 mgd t WTP. The estimated construction cost for projects <br />identified in the DWQIP is $460 million dollars. <br />24 mgd Lester J. Berglund Water Treatment Plant Expansion <br />Client City of Poway <br />Title: Project Manager <br />Project included demolition of the existing Hardinge filters and construction of four dual media filters, new <br />chemical storage and feed facilities. chlorination system improvements and chlorine scrubber facilities, new <br />rapid mixing pumps and chemical diffusion system, a new wash water tank and related pumping system <br />RICHARD BRADY & ASSOCIATES, INC. E-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.