<br />As a board certified Diplomat of Geotechnical Engineering, John is recognized as an engineer with an
<br />advanced degree of knowledge and expertise in the specialized field of Geotechnical Engineering. He
<br />has a broad base of experience focused on technologies associated with geotechnical, foundation, and
<br />geoenvironmental engineering. With 30 years of experience in design and consulting engineering as
<br />well as 10 years in environmental construction, he is broadly founded in geoenvironmental engineering
<br />and construction. John has acted as a Project Engineer, Project Manager, or Principal Engineer on over
<br />1,000 geoenvironmental projects.
<br />PROJECT
<br />• MBA, Emory University,
<br />Atlanta, GA
<br />Vista Irrigation District HP Reservoir, Vista, CA: Principal Geotechnical
<br />• MS, Geotechnical
<br />Engineer during a geotechnical investigation for retrofitting of an existing
<br />Engineering, University
<br />water reservoir that is 25 foot tall and 150 foot in diameter. Otherfeatures
<br />of California Berkeley,
<br />will include a mechanical building with an antennae tower, associated
<br />Berkeley, CA
<br />paved driveways, and a security fence.
<br />• BS, Civil Engineering,
<br />University of Santa Clara,
<br />P-079 CPEN Water Distribution Improvements, MCB Camp
<br />Santa Clara, CA
<br />Pendleton, Oceanside, CA: Principal Geotechnical Engineer during a
<br />geotechnical investigation for 29,050 feet of water transmission main
<br />improvements. to be completed in two segments. Both segments
<br />• • .
<br />include of installation of 24-inch diameter PVC lines and segment one
<br />• •
<br />includes the removal of an existing 18-inch transmission line. Supporting
<br />• State of California
<br />infrastructure will include a 50-foot diameter elevated reservoir structure,
<br />Professional
<br />two booster stations, and abandonment of existing water transmission
<br />Engineer#27211
<br />mains.
<br />• State c nical ng
<br />Geotechnical Engineer
<br />City of Poway Martincoit Road Sewer U size Project, Poway, CA:
<br />Y Y P 1 Y�
<br />#651
<br />Principal Geotechnical Engineer during a geotechnical investigation for
<br />• state of Nevada
<br />the replacement of pipes along Martincoit Road. Approximately 1,870
<br />Professional
<br />feet of 8-inch diameter pipe will be replaced with 12-inch diameter pipe
<br />Engineer#019392
<br />and 2,970 feet of 10- and 12-inch pipeline will be replaced with 15-inch
<br />• State of Georgia
<br />diameter pipe.
<br />Professional
<br />Engineer#PE012044
<br />City of Carlsbad Ocean Street Beach Access Improvements,
<br />• State of Florida
<br />Carlsbad, CA: Principal Geotechnical Engineer during a geotechnical
<br />Professional
<br />Engineer#63403
<br />investigation for the $3.1 million project consisting of seven Carlsbad
<br />beach entrances along Ocean Street in an effort to enhance the privacy,
<br />• Engineer -of -Record,
<br />Georgia Department
<br />security, and aesthetics. Some of the improvements included more
<br />Natural Resources, Safe
<br />a
<br />inviting and attractive stairs, railings, and landings leading down to beach
<br />9 9 9 9
<br />Dams Branch
<br />areas, trash/recycling receptacles, lighting, crosswalks, and drought
<br />tolerant landscaping. Significant improvements were made to upgrade
<br />1. H�
<br />stormwater systems to current design standards and codes.
<br />RICHARD BRADY 8 ASSOCIATES, INC. E-40
<br />
|