Laserfiche WebLink
d�1 <br />A <br />N0VA RESUME <br />JOHN O'BRIEN, GE, PE <br />PRINCIPAL GEOTECHNICAL ENGINEER <br />BACKGROUND <br />As a board certified Diplomat of Geotechnical Engineering, John is recognized as an engineer with an <br />advanced degree of knowledge and expertise in the specialized field of Geotechnical Engineering. He <br />has a broad base of experience focused on technologies associated with geotechnical, foundation, and <br />geoenvironmental engineering. With 30 years of experience in design and consulting engineering as <br />well as 10 years in environmental construction, he is broadly founded in geoenvironmental engineering <br />and construction. John has acted as a Project Engineer, Project Manager, or Principal Engineer on over <br />1,000 geoenvironmental projects. <br />PROJECT <br />• MBA, Emory University, <br />Atlanta, GA <br />Vista Irrigation District HP Reservoir, Vista, CA: Principal Geotechnical <br />• MS, Geotechnical <br />Engineer during a geotechnical investigation for retrofitting of an existing <br />Engineering, University <br />water reservoir that is 25 foot tall and 150 foot in diameter. Otherfeatures <br />of California Berkeley, <br />will include a mechanical building with an antennae tower, associated <br />Berkeley, CA <br />paved driveways, and a security fence. <br />• BS, Civil Engineering, <br />University of Santa Clara, <br />P-079 CPEN Water Distribution Improvements, MCB Camp <br />Santa Clara, CA <br />Pendleton, Oceanside, CA: Principal Geotechnical Engineer during a <br />geotechnical investigation for 29,050 feet of water transmission main <br />improvements. to be completed in two segments. Both segments <br />• • . <br />include of installation of 24-inch diameter PVC lines and segment one <br />• • <br />includes the removal of an existing 18-inch transmission line. Supporting <br />• State of California <br />infrastructure will include a 50-foot diameter elevated reservoir structure, <br />Professional <br />two booster stations, and abandonment of existing water transmission <br />Engineer#27211 <br />mains. <br />• State c nical ng <br />Geotechnical Engineer <br />City of Poway Martincoit Road Sewer U size Project, Poway, CA: <br />Y Y P 1 Y� <br />#651 <br />Principal Geotechnical Engineer during a geotechnical investigation for <br />• state of Nevada <br />the replacement of pipes along Martincoit Road. Approximately 1,870 <br />Professional <br />feet of 8-inch diameter pipe will be replaced with 12-inch diameter pipe <br />Engineer#019392 <br />and 2,970 feet of 10- and 12-inch pipeline will be replaced with 15-inch <br />• State of Georgia <br />diameter pipe. <br />Professional <br />Engineer#PE012044 <br />City of Carlsbad Ocean Street Beach Access Improvements, <br />• State of Florida <br />Carlsbad, CA: Principal Geotechnical Engineer during a geotechnical <br />Professional <br />Engineer#63403 <br />investigation for the $3.1 million project consisting of seven Carlsbad <br />beach entrances along Ocean Street in an effort to enhance the privacy, <br />• Engineer -of -Record, <br />Georgia Department <br />security, and aesthetics. Some of the improvements included more <br />Natural Resources, Safe <br />a <br />inviting and attractive stairs, railings, and landings leading down to beach <br />9 9 9 9 <br />Dams Branch <br />areas, trash/recycling receptacles, lighting, crosswalks, and drought <br />tolerant landscaping. Significant improvements were made to upgrade <br />1. H� <br />stormwater systems to current design standards and codes. <br />RICHARD BRADY 8 ASSOCIATES, INC. E-40 <br />