Laserfiche WebLink
PROPOSALFO <br />On -Call Water Resources Engineering Services <br />RFP NO.: 19-100 <br />Team Organization and Management <br />Kimley-Horn knows that when you choose a consulting firm, you are really choosing the people <br />who offer you the technical expertise, hands-on experience with similar projects, and commitment <br />to a high standard of quality and client service that will make your projects as successful as you <br />envisioned. The people on our team are passionate about their work and do it well. Our team is <br />comprised of veteran team leaders, civil engineers, and technical staff to provide streamlined design <br />engineering support on a variety of tasks. In addition, our team includes two specialty subconsultants— <br />OnPoint Land Surveying, Inc. and Twining, Inc. —who will provide surveying and geotechnical <br />engineering, respectively. <br />While we remain responsive to our clients' dynamic needs by drawing upon a diverse professional <br />staff, we also provide management continuity through the assignment of a client -oriented project <br />manager. The project manager is responsible for all work production, scheduling, project reviews, <br />and client contact. Aryo Rad, P.E., QSD/P will serve as our primary contact for the City, providing <br />overall management and coordination for Kimley-Horn's on -call services. Aryo will coordinate all team <br />members' efforts and deliverables, including those of our subconsultants. Before a project starts, he will <br />conduct a project scoping meeting with all respective team members to brainstorm the project issues <br />and ensure that their experience matches the requirements of the project scope. Darren Adrian, P.E. <br />will manage the project team when Aryo is not available on site. Aryo and Darren will be supported <br />by a team of experienced engineers and subconsultant specialists. Task Managers will provide task <br />management and technical support for each task based on the scope of work for each project as <br />indicated in Attachment 1 of the City's RFP. An organizational chart is provided on the following page. <br />The chart delineates the roles and responsibilities of the staff assigned to this contract. If selected, <br />this is the team expected to serve you throughout the duration of the contract. Resumes for all team <br />members begin on page R-1. <br />Commitment of Key Personnel <br />In addition to experience with similar projects, the members of our project team were selected based <br />on their availability to perform the services required for this contract. Kimley-Horn uses a proactive <br />management system, known as "cast-aheads' to detail every project's personnel needs and determine <br />each staff person's availability. Based upon a review of our cast-aheads, we can assure you that <br />the staff members selected for this team are available immediately to serve you and are in excellent <br />position to handle the workload required to accommodate the City's needs throughout the duration of <br />this contract. In addition, we can call upon the 4,100+ personnel in our firm at any given time to meet <br />the City's needs. Each team member's level of commitment is shown in the table below. <br />Staff <br />Aryo Rad, P.E.,QSD/P <br />Availability <br />50% <br />Staff <br />Dave Barquist, AICP <br />Availability <br />35% <br />Darren Adrian, P.E. <br />25% <br />Michael Madsen, PLA, CLIA, ASLA <br />45% <br />Frank Hoffman, P.E. <br />20% <br />Andrew Sanford, P.E. <br />40% <br />Jean Fares, P.E. <br />15% <br />Mike Colombo, P.E. <br />40% <br />Kevin Thomas, CEP, Env-SP <br />15% <br />Joseph Bradshaw, P.E. <br />45% <br />Othman Elmezain, P.E. <br />60% <br />David Luzuriaga, P.E., QSD/P <br />35% <br />Sam McWorther, P.E. <br />55% <br />Anthony Smith, P.E., PLS <br />35% <br />Jason Melchor, P.E. <br />50% <br />Amir Ghavibazoo, Ph.D. <br />30% <br />City of Santa Ana . NWCC177011 19 Kimlep)Horn 4 <br />