Laserfiche WebLink
PROPOSALFOR <br />On -Call Water Resources Engineering Services <br />RFP NO.: 19-100 <br />Sam McWhorter, P.E. <br />Hydraulics and Hydrology; Potable and Reclaimed Water <br />Professional Credentials <br />Sam has more than 20 years of experience on a variety of complex <br />• Master of Science, Civil <br />civil engineering water works and wastewater projects. His experience <br />Engineering (Water <br />includes designing and managing projects involving water and <br />Resources), San Diego <br />wastewater planning and design, as well as hydrology and hydraulics <br />State University <br />planning and design. His drainage experience includes designing <br />and managing projects involving storm drain systems, complex large <br />• Bachelor of Science, <br />watershed hydrologic analysis, river hydraulic modeling, detention <br />Civil Engineering, San <br />basin design, water quality best management practices planning and <br />Diego State University <br />design, stormwater quality studies, scour analysis, sedimentation, <br />• Professional Engineer in <br />watershed hydromodification, rainwater harvesting, and master planning. <br />California #61788 <br />He has worked on a wide variety of public works projects for local <br />Professional Affiliations <br />cities and agencies. <br />• American Society of Civil <br />Relevant Experience <br />Engineers <br />• As -Needed Services for San Diego County Airports, San Diego <br />County, CA— Project Engineer <br />• Downtown Water and Sewer Pipeline Replacement, Phase 2, <br />Oceanside, CA— Project Manager <br />• Parkside Sewer Lift Station Rehabilitation, Chula Vista, CA — <br />Project Manager <br />• Otay Valley Regional Park Trails Feasibility Study, Chula Vista, CA <br />— Project Engineer <br />• Otay Valley Road Channel Design, San Diego and Chula Vista, CA <br />— Project Engineer <br />• Willow Street Bridge Replacement Phase ll, Chula Vista, CA — <br />Project Engineer <br />• Bayfront Master Plan, Chula Vista, CA— Project Engineer <br />• San Elijo Lagoon Utility Relocation/Replacements, San Diego, CA <br />— Project Manager <br />• Market and Euclid Complete Streets, San Diego, CA — Water/Sewer/ <br />Drainage Design Engineer <br />• Safari Park Wastewater Treatment Plant Expansion, San Diego, CA <br />— Project Manager <br />• Cedar Street/8th Avenue Waterline Replacements, San Diego, CA — <br />Project Engineer <br />• Otay Mesa Drainage Master Plan, San Diego, CA — Project Engineer <br />• Otay Valley 24-inch Water Transmission Line, San Diego, CA — <br />Project Engineer <br />City of Santa Ana .IA'DC770'il 79 Klmley»Horn R-7 <br />