My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES, INC-A-2020-075-07
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES, INC-A-2020-075-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 12:40:08 PM
Creation date
5/6/2020 4:12:40 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES, INC
Contract #
A-2020-075-07
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
4/1/2025
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSALFOR �1 t <br />On -Call Water Resources Engineering Services �1 <br />RFP NO.: 19-100 <br />2. Scope of Services and Schedule <br />Scope of Services <br />The tasks below are intended to provide a sample of scope of services of a typical task order as part of <br />this on -call program. Actual tasks will vary based on each individual's project's needs and scope. <br />• Project Management and Coordination <br />• Record Research and Utility Coordination <br />• Geotechnical Investigation and <br />Pavement Evaluation <br />• Surveying and Mapping <br />• Hydraulic and Hydrology Analysis <br />• Water Quality management Report <br />• Environmental Studies <br />• Water Main Replacement Plans <br />• Well Rehabilitation Plans <br />• Street Improvement Plans <br />• Well System Modeling and Design <br />Schedule <br />• Pump Station Building Design (Structural, <br />Architectural, MEP) <br />• Permitting and Agency Coordination <br />• Structural Analysis <br />• Strom Drain plans <br />• Landscaping and Irrigation Plans <br />• Signing and Striping Plans <br />• Traffic Signal and Traffic Handling Plans <br />• Specifications <br />• Opinion of Probable Construction Cost <br />• Potholing <br />• Bid and Construction Phase Support <br />Per the City's Q&A, no schedule is required. For information regarding how we control our project <br />schedules, please refer to Section 1.d. <br />3. Fee Proposal <br />We have submitted our Fee Proposal as a separate file attachment, as instructed by the City's RFP and <br />subsequent Q&A. <br />4, Certifications <br />We have provided the forms listed below on the following pages: <br />• Attachment 3-1: Non -Collusion Affidavit <br />• Attachment 3-2: Non -Lobbying Certification <br />• Attachment 3-3: Non -Discrimination Certification <br />City of Santa Ana . 1WOC77011 19 KimleyoHorn • 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.