My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
system; Limonite Ave full right of way improvements; Canyon Lake street curb & gutter & asphalt <br />project inspector of record; AutoCAD design, review for civil and architectural plans & <br />constructability of construction documents; Negotiated change orders with contractors as the <br />owner's representative. Reviewed & approved certified payroll. Managed initial training for <br />facilities management staffing including the guarantee / warranty & maintenance contracts. <br />"SUPERBLOCK" State Consolidated Offices Building in San Bernardino Inspector of <br />Record and Construction Manager for the State of California - The project included 12 story <br />392,000 SF Class "A" commercial office building & 6 story 306,000 Sf post tension concrete <br />parking structure for 1,200 vehicles on 5 acre site including hardscape and landscaping. <br />Management & coordination of 49 deputy inspectors from 3 testing laboratories. Ensured the <br />completeness of the contract plans & specifications, maintainability and functionality of the <br />building structure core & shell components and materials. Managed weekly meetings with <br />Architects, Engineers, Contractors and agency representatives. Negotiated change orders; <br />ensure code compliance and ADA requirements. Administered contract close-outs, including all <br />owners training and warranty review and operations. Project completed on time and under budget. <br />Manage construction & maintenance programs for commercial, industrial, residential & <br />public works projects throughout Southern California Construction Manager and Senior <br />Inspector: The Project included contract public works inspector to the cities of Calabasas, <br />Stanton & Brea. Responsible for acquisition and transition of vacated office buildings (Bank of <br />America) to lease spaces. Responsible for the overview of architectural design & review to the <br />permit process. Manage the core & shell and site development, build to suit for tenant leases. <br />Manage the Development of the Westend Development in the City of Corona & The Clearing a <br />residential development consisting of 33 homes and The Overlook 22 homes in Riverside County. <br />Assist in the Northridge earthquake home mitigation, evaluation and renovation program. <br />North County San Diego Transportation District (Coaster Train) : Construction Inspector of <br />Record and Owner's Representation - Responsibilities included construction of six railroad <br />platform stations, railroad main lines, secondary lines, passing tracks and sidings, infrastructure, <br />& buildings for the North County San Diego Transportation District (Coaster Train). Coordinated <br />mass & fine grading operations, underground pedestrian walkway corridor, utility construction, <br />and appurtenances. Reviewed & approved all plans & specifications for accurateness and <br />completeness. Direct contact with the Federal Railroad Administration and Cal-Osha inspectors. <br />Administered contract documents for general contractor and subs. Liaison to the agency for all <br />public utility agencies. Act as owner's representative, to architects, engineers, contractors and <br />vendors. <br />Office Buildings for the Department of General Services Office Building Manager II — The <br />project included administration and maintenance of 560,000 SF of State owned and commercial <br />office buildings. Planed & assigned chief engineer, stationary engineers, grounds keepers, <br />custodial supervisors and staff. Communicated program goals and objectives. Utilized MAXIMO <br />preventative maintenance program. Planed and ensured the development of specifications, <br />estimates & direct alterations for mechanical (HVAC), electrical, tenant improvements, grounds <br />improvements for DGS, CHIP, EDD, DMV, COA facilities. Interpreted and reviewed all building <br />plans & specifications for building projects to assure contract and code compliance to meet the <br />Calif. Code of Regulations, Title 24 and the California Building Standards Code. Project manager <br />for all building construction by reviewing all work in progress with complete progress reports in <br />accordance with RESD policies & procedures. Coordinated weekly progress meetings. Recorded <br />history of project progress through ABMS. Initiated and reviewed of all change orders and or <br />revisions for construction progress. Developed 5 year plans and operating budgets. Maintained <br />cooperative relationships with various agency tenants and occupants. Managed the requisition of <br />space allocation. <br />AKM Prop. 20-1004 Appendix B - 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.