Laserfiche WebLink
Mr. Lowe is a staff engineer for AKM Consulting Engineers. In this <br />capacity he specializes in planning and design of water, <br />recycled/non-domestic water, and wastewater systems. Mr. Lowe's <br />previous experience encompasses a wide range of water resource <br />Mr. Nicholas (Nick) projects: <br />Lowe Title 22 Filter 9 Repair Project for West Basin Municipal <br />Role: Inspector Water District — Construction Inspector for the project which <br />Education: B.S. Civil consisted of removal and repair of the existing underdrain system for <br />Engineering, University of Title 22 Filter 9; addition of a concrete end plug on each side of the <br />California Irvine Filter 9 gullet; and reinstallation of the cleaned and repaired filter <br />Years of Experience: 5 underdrain system. <br />• Watermain Improvements at Center, Walnut, and Maple for <br />the City of El Segundo — Construction Inspector for the project which consisted of <br />approximately 3,500 LF of 10" DIP, 850 LF of 8" DIP, 1,000 feet of a temporary high -line system <br />to serve customers while replacements were being conducted on Center Street, appurtenant <br />valves, new fire hydrants, fire hydrant abandonments; 8 connections to existing system; re- <br />establishment of water services; installation of new service meters; hydrostatic testing of new <br />water main; chlorination and de -chlorination of water main; and final flushing. Also included was <br />rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and a grind and cap of the <br />streets along the pipe alignment. <br />• Edward C. Little Water Recycling Facility Clean -in -Place Waste Discharge Project — <br />Assistant Field Engineer / Inspector for the project which involved sequestering and then <br />neutralizing the clean -in -place solution waste for the existing reverse osmosis (RO) system in <br />order to discharge to the local sewer system as opposed to the treatment facilities brine line, <br />which it discharges to. Specific project work elements included demolition of an existing solids <br />contact clarifier and construction of two cast -in -place reinforced concrete neutralization tanks for <br />the RO clean -in -place waste, including a corrosion resistant coating, discharge and recirculation <br />pumps, associated valves and piping; construction of a new RO clean -in -place waste sump for <br />the collection of RO clean -in -place discharge from the RO trains including new pumps, piping and <br />instrumentation; rehabilitation of the existing RO waste sumps 1, 2, and 3 including a new coating <br />system, pumps, instrumentation and controls; installation of a new brine line flow meter which <br />required interception of the line, 2 shutdowns and construction of above ground piping; new <br />sodium hydroxide transfer feed pump including new piping and instrumentation; and a new <br />sodium hydroxide day tank and modifications to the existing sulfuric acid tank farm including 2 <br />new metering pumps. <br />• Butterfield LS Force Main Partial Replacement Project for the City of Chino Hills - Staff <br />Engineer responsible for the preparation of plans, specifications, and cost estimates for lowering <br />the 10-inch, concrete encased, forcemain below Chino Creek (under 96-inch culverts). The <br />completed forcemain was installed in steel casing. <br />• Stormwater Pump Station Assessment for the City of Long Beach — Associate Engineer <br />responsible for evaluation of the condition and capacity of 22 City owned stormwater pump <br />stations, development of a capital improvement program, and documenting the study in a report. <br />• Sewer Condition Assessment for the City of Redondo Beach — Associate Engineer <br />responsible for developing alternative repair, replacement, and/or rehabilitation recommendations <br />along with cost estimates for identified sewer reaches with severe structural defects. Segment <br />repair/replacement action drawings were created for over 170 sewer reaches. The action <br />drawings showed the locations of the defects found by CCTV inspections and the limits of <br />recommendations such as spot repair, lining, or full replacement. <br />AKM Prop. 20-1004 Appendix B - 25 <br />