Laserfiche WebLink
GEOTECHNICAL SERVICES AND MATERIALS TESTING AND INSPECTION (CONT.) <br />Scheduling - A minimum of 24 hours' notice is requested to schedule personnel. If <br />less than 24 hours' notice is provided on a cancellation, a cancellation charge of 2 hours <br />may be assessed. <br />Overtime Rates - Rates are based on an 8-hour workday between the hours of 7:00 <br />a.m. and 3:30 p.m., Monday through Friday. Work outside of these hours or in excess of <br />8 hours in one day or over 40 hours in one week will be charged a premium of 1.5 times <br />the quoted rates. Work over 12 hours in one day or over 8 hours on the 7th consecutive <br />day or worked holidays will be charged at 2.0 times quoted rates. <br />Minimum Charges - Hours will be charged portal-to-portal from our closest office. <br />For inspection call -out between 0 and 4 hours a minimum charge of 4 hours will be <br />applied. Eight hours will be charged for work performed over 4 hours up to 8 hours. A <br />4-hour minimum charge shall apply to all cancellations after inspector has been <br />dispatched. <br />Holidays - The following holidays are observed: Nmv Years Day, Memorial Day, <br />Independence Day, Labor Day, Thanksgiving Day, Day after Thanksgiving and <br />Christmas Day. Should a holiday fall on Saturday or Sunday, the closest previous or <br />following regular workday will be observed for the holiday. <br />Outside Services / Subconsultants - Cost plus 10% will be charged for any work not <br />directly performed or for any materials procured. <br />Travel/Room/Board - All associated cost associated with the travel/room/board of <br />personnel within fifty (50) mile radius of the project site to the location of the <br />plant/shop to be responsibility of the firm. If the Agency has approved, then the <br />Department will reimburse mileage at the current federal reimbursement rate for <br />inspection services provided at a plant/shop which is located more than 50 miles and <br />less than 100 miles from the project site - firm is responsible for other direct and <br />indirect travel cost including room/board. All cost are to be presented and approved by <br />the Agency prior to performance of inspection with such travel cost. <br />