Laserfiche WebLink
Section 4 — Relevant Project Experience <br />Similar Project Experience and References <br />Clients choose W&A for our responsiveness, our experience in a variety of CIP and Development projects and <br />our staffs commitment and ability to help ensure the success of every project. <br />On -Call Project Management, Construction Management and Inspection <br />City of Corona, CA (May 2011 — Present) <br />Related Elements <br />Variety of CIP projects <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />PM/CM: Bryan Tuschhoff, CMIT, PMP, <br />QSP, Peter Ramey, PE, John Reidinger, <br />CCM, Jeff Schippers, CCM, Dennis <br />Phinney, PE, Ken Cope <br />Cost Estimating: Peter Ramey, PE <br />Office Engineering: Heidi Nesper, <br />Rachael Highley, Kim Brown, Christine <br />Gallis <br />Senior Construction Inspectors: <br />David Zamiski, Tom Hall, Pete Ayala, <br />Gordon Lewis, Pat Shen, QSP, Frank <br />Moreno, Rick Wiggins, Bob Peters, <br />David Babcock, Cesar Ramirez, EE, <br />Jeremy Vander Veen <br />Contract Admin: Heidi Nesper, <br />Rachael Highley, Christine Gallis, Bill <br />Eckman <br />Certified Payroll Auditor: Kim Brown <br />Client Contact <br />Vernon Weisman <br />District Engineer <br />(951)739-4912 <br />vernon.weisman@ci.corona.ca.us <br />W&A is providing Project Management, Construction Management, <br />Inspection and Labor Compliance services for Development and CIP <br />projects throughout the City. Project elements involve water and sewer <br />pipelines, lift stations, reservoirs, streets, roadways, street lights, <br />facilities, parks, land development and utility relocations. Relevant <br />projects include: <br />• Temescal Canyon Road Improvement Projects: Temescal/Glen <br />Ivy Waterline Relocation Dawson ($13M) 2019 <br />• Sixth Street Waterline Extension -Grand to Rimpau ($863K) 2019 <br />• 2018-19 Pavement Rehabilitation Project ($1 M) 2019 <br />• Vista Monterey Recycled Waterline ($500K) 2018 <br />• Main Street Metro Development ($150M) 2018 <br />• Foothill Parkway Widening Tamarisk Lane to Teddy Bear Lane <br />($1.75M) 2017 <br />• CIPP Sewer on Smith Street ($200K) 2015 <br />• Masters Drive Recycled Waterline and Repaving Project ($2.5M) <br />2013 <br />• Butterfield Park Recycled Waterline ($3M) 2014 <br />• Cerritos Waterline Replacement ($1.5M) 2014 <br />• R-3 Reservoir ($4M) 2014 <br />• Arlington Desalter Connection ($850K) 2012 <br />On -Call Construction Management and Inspection Services <br />City of Fullerton, CA (July 2018 — Present) <br />Related Elements <br />On -call inspection for water related <br />services <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />Construction Manager: Bryan <br />Tuschhoff, CMIT, PMP, QSP <br />Construction Inspectors: Gary <br />McCredie, CMIT, Bob Peters <br />Special Inspections: Jin Chong, [CC, <br />Client Contact <br />David Gantham, PE <br />Project Manager <br />(714)738-6853 <br />DGrantham@cityoffullerton.com <br />W&A provides On -Call Construction Management and Inspection <br />services for a variety of Land Development and Capital Improvement <br />Projects within the City. Projects include street rehabilitation, traffic <br />signal and intersection, water and sewer improvements, storm drain <br />facilities, landscaping and irrigation. Specific projects include: <br />• Laguna Booster Pump Station Upgrades ($880K) 2019 <br />• Harbor Boulevard Rehabilitation ($175K) 2018 <br />• Valencia Drive Infrastructure Improvements ($1.5M) 2019 <br />• Chapman Avenue Rehabilitation ($950K) 2018 <br />• 4300 North Harbor Boulevard ($2.5M) 2018 <br />• Transportation Center Pedestrian Overpass Elevator ($2.7M) <br />2018 <br />• Residential Slurry Seal & Misc. Rehab ($729K) 2018 <br />C7a11aoclates <br />...... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 17 <br />