Laserfiche WebLink
art <br />Section 4 — Relevant Project Experience <br />Recycled Water Improvements for Riverside Drive, from Archibald Avenue to Mill Creek Avenue <br />Ontario Municipal Utility Company, Ontario, CA (May 2018 — Feb 2019) <br />Related Elements <br />W&A provided Construction Management and Administration for the <br />Construction Management for a water <br />two-mile recycled waterline project. Features include installation of 8", <br />related project <br />12" and 16" diameter PVC and CMU CMC WSP recycled water mains, <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />reconstruction of an existing potable water main at a County Flood <br />Construction Manager: Ken Cope <br />Control Channel, installation of recycled water appurtenances, <br />Y PP <br />Contract Administrator: Christine <br />connection to existing recycled water connections at several street <br />Gallis <br />intersections, implementation of traffic control during construction, <br />Client Contact <br />pavement repair and street restoration. Duties included construction <br />Omar Gonzalez <br />Senior Associate Civil Engineer (909) <br />documentation, management of City inspector, oversight of office <br />395-2578 <br />engineer, as well as preparing daily reports, progress payments, <br />OEGonzalez@ontarioca.gov <br />contract change orders, processing submittals, responding to RFI's, <br />9 P 9 P 9 <br />coordination of materials and specialty inspection sub -consultants. <br />Construction Management and Inspection <br />California American Water Company (2014 — Present) <br />Related Elements <br />W&A provides Construction Management and Resident Inspection <br />Full time CM and inspection services <br />services to a variety water related projects. Cal Am Water's service <br />W&A Key Staff <br />area spans the entire state and includes six districts which range from <br />Contract Manager: Carl Wallace, PE <br />Construction Inspectors: Gordon <br />San Diego to Monterey. W&A provides Cal Am Water with flexible <br />Lewis, Phil Ken Cope <br />staffing resources on short and long-term projects throughout their <br />act <br />Client Contact <br />service area. Current projects range in size from $24K to over $30M. <br />Unel Ortiz Moreno <br />• MPWSP Transfer Pipeline ($37M) Ongoing <br />Project Manager <br />(626) 614-2500 <br />• Monterey Peninsula Water Supply ($30M) 2019 <br />uriel.morenoortiz@amwater.com <br />• Freemont Street Watermain Replacement ($8M) 2018 <br />Gainsborough Gradient ($1.5M) 2017 <br />• Lemon Gradient ($2M) 2017 <br />• Pasadena Waterline and Service Replacement ($750K) 2015 <br />As -Needed Inspection Services <br />Coachella Valley Water District, CA (2010 — Present) <br />Related Elements W&A provides Resident and Staff Inspection services for a variety of <br />CIP water projects CIP and developer related projects. Recent project work includes over <br />Flexible inspection services 20,000' of new 6", 8", 12" mainline (potable and recycled), pump and lift <br />W&A Key Staff stations, blow off valves, mainline connections, VCP and PVC sewer <br />Contract Manager: Carl Wallace, PE mainline construction, manholes and vaults for sewer and water <br />Inspectors: Gordon Lewis, Pete Ayala, air. Some of the facilities, water wells, and channel construction and re <br />CMIT, Jeremy Wylie, John Alcala, Dave P <br />Babcock, Alfredo Del Toro, John Martin, projects include: <br />Rick Hanks, Phil Fikes, ICC, Tom . L-4 Pump Station Replacement ($6.5M) Ongoing <br />Mitchell, Rick Wiggins . Washington Street Lift Station 81-01 Rehabilitation ($5M) Ongoing <br />Client Contact Burr Street Lift Station 81-03 $6M Ongoing <br />Michael Dietrick ( ) 9 9 <br />Inspection Supervisor • San Antonio Del Desierto Sewer Pipeline and Lift Station ($4.1 M) <br />(760) 398.2661 x 353 2019 <br />mdietrick@cvwd.org • Water Reclamation Plant No. 2 Improvement ($2.7M) 2019 <br />• Adams Street Crossing and Storm Drain ($700K) 2015 <br />• Palm Desert Ground Water Replenishment Project ($8.1 M) 2019 <br />• Deep Canyon Channel and Parkview Drive Project ($1.1 M) 2019 <br />• Avenue 59 Drain Replacement & Irrigation Lateral 101.3/Avenue 55-Fillmore Drain Improvement ($2.9M) <br />2019 <br />• Reservoir 4605-1 Construction ($11 M) 2019 <br />...... Ces�ssaclares- City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 19 <br />