VICKY ITO PE, QSP/QSD, LEED AP
<br />Years of experience
<br />WATER QUALITY
<br />18
<br />Vicky has more than 18 years of urban development experience including
<br />residential subdivision, commercial development, and power transmission
<br />Education
<br />and distribution. She has prepared Water Quality Management Plans,
<br />BS, Civil Engineering
<br />preliminary site plans, construction documents, hydrology reports and
<br />Storm Water Pollution Prevention Plans as well as coordinated with
<br />Registrations
<br />regulatory agencies.
<br />PE #73766, CA
<br />D #25810,
<br />SELECT PROJECT EXPERIENCE
<br />ASQA
<br />CASQA
<br />• Mesa Substation - Hydrology Report and Preliminary Design for
<br />Water Quality Basin, Los Angeles, County, California
<br />Value to the City
<br />(Project Engineer)
<br />• Has prepared
<br />• House of Imports - WQMP, Buena Park, California (Project Engineer)
<br />numerous water
<br />• Brightwater Residential Development, Huntington Beach, California
<br />quality reports and
<br />(Senior Project Engineer)
<br />associated
<br />• Anaheim Convention Center Betterment VI - Backbone Sewer
<br />documents for
<br />Relocation, Domestic Water and Storm Drain Facilities, Sewer Study,
<br />various project
<br />Anaheim, California (Senior Project Engineer)
<br />types throughout
<br />• The Covey (Dickerson School Site), Buena Park, California
<br />Orange County
<br />(Project Manager)
<br />STEVE COOK PLA
<br />Years of experience
<br />LANDSCAPE AND IRRIGATION
<br />28
<br />Steve's combined experience as a landscape architect, a licensed
<br />landscape contractor, a certified water auditor, and an EPA Watersense
<br />Education
<br />member provide him a broad base of valuable knowledge. His years of
<br />BS, Agricultural
<br />experience as a contractor working directly with the materials most
<br />Business
<br />commonly used in landscape construction give him not only a breadth of
<br />Management
<br />information to draw upon for irrigation design, but also give him valuable
<br />insight when conducting site observations and providing other field
<br />Registrations
<br />construction -related services. Additionally, Steve's experience as a
<br />PLA #4053, CA
<br />landscape architect and a certified landscape water auditor provide him
<br />Certified Landscape
<br />the knowledge necessary to design the most current environmentally
<br />Irrigation #82148
<br />friendly and efficient irrigation delivery systems.
<br />Licensed Landscape
<br />SELECT PROJECT EXPERIENCE
<br />Contractor #C27-
<br />528894, CA
<br />• Raitt-Myrtle Park Improvement Project, Santa Ana, California
<br />(Project Manager)
<br />Value to the City
<br />• Inland Empire Utilities Agency 930 Zone Chino Hills Recycled Water
<br />Successfully
<br />Reservoir and Pipeline, Chino Hills, California (Landscape Architect)
<br />managed PS&E
<br />• La Palma Recharge Basin, Anaheim, California (Landscape Architect)
<br />for an accelerated
<br />• Planning Area 40 Natural Treatment System, Irvine, California
<br />City of Santa Ana
<br />(Landscape Architect)
<br />park improvement
<br />• Marywood Pump Station, Orange, California (Landscape Architect)
<br />project
<br />5 Stantec City of Santa Ana 'n,, s I i i Fall F -, i , - , 1,neenr J h rvice RF ND l _-1 �1- 1-
<br />
|