My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Review, evaluate and recommend budget cost analysis <br />• Review, and recommend shop drawings for approval <br />• Review approval of any specifications and permit requirements <br />• Provide field conflict resolutions <br />• Monitor, guide and advise the City for compliance with state, local and federal funding <br />requirements. Prepare paperwork and compliance reports <br />• Schedule, prepare agendas, conduct progress meetings, and minutes <br />• Provide and prepare assistance with claim disputes, change order requests and associated <br />construction project litigation <br />• Maintain project files, records, and contact information related thereto. Use of PROCORE <br />software is a requirement <br />• Project closeout, including: post -construction debriefing meetings; contractor evaluations, <br />file purging and archiving <br />• Construction Inspection Services management and oversight <br />• Project commissioning and or owner training <br />• Any other items required for successful project execution <br />The Construction manager is responsible for monitoring all the contractor(s) operations and <br />compliance thereof including and not limited to their staff, and/or sub -consultants. <br />The selected consultant(s) must have the expertise, experience, and demonstrated resources <br />available to perform the work described in this RFP. <br />Project Management, Equipment/Supplies: <br />The consultant(s) services shall be in accordance with the provisions, guidelines and specifications <br />detailed here in and not limited to professional standards established by the City, and or federal, <br />state and local guidelines. <br />The consultant(s) shall have project management control procedures in effect during the entire <br />time work is being performed under the Agreement. This task shall include the following: <br />• Project Management Plan- the consultant shall provide a detail management plan including <br />information and coordination to ensure compliance and completion of the job order tasks <br />• Quality Control/Quality Assurance (QA/QC) Plan <br />• Project Schedule/Invoicing <br />• Project Correspondence <br />In case of conflict, ambiguities, discrepancies, errors, or omissions, the consultant(s) shall submit <br />the matter to the City for clarification. <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the <br />required information in the RFP. The City will provide only the staff assistance and the <br />documentation specifically in referred to herein. <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />City of Santa Ana RFP 19-118 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.