Laserfiche WebLink
L S A FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS <br />(9TH STREET TO 16TH STREET( PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />SANTA ANAL CALIFORNIA MAY 2020 <br />Mitigation Measure HYDRO-3 Water Quality Management Plan. During the final design phase, <br />the City Public Works Director or designee shall insure that a Final <br />Water Quality Management Plan (WQMP) be prepared for the <br />Project in compliance with the Waste Discharge Requirements for <br />the County of Orange, Orange County Flood Control District and the <br />Incorporated Cities of Orange County within the Santa Ana Region <br />Areawide Urban Storm Water Runoff Orange County (North Orange <br />County MS4 Permit or most recently adopted North Orange County <br />MS4 Permit), Order 118-2009-0030, NPDES No. CAS618030 (as <br />amended by Order No. 118-2010-0062). The Final WQMP shall be <br />prepared consistent with the requirements of the Model WQMP <br />and Technical Guidance Document for the Preparation of <br />Conceptual/Preliminary and/or Project WQMPs, or subsequent <br />guidance manuals. The Final WQMP shall specify the BMPs to be <br />incorporated into the Project design to target pollutants of concern <br />in runoff from the Project area. The City Public Works Director or <br />designee shall ensure that the BMPs specified in the Final WQMP <br />are incorporated into the final Project design. <br />3-66 7 5 BAWD\Final ISMND\Fairview Street Bridge Final ISMND.docx (OS/26/20) <br />