My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
6/12/2020 2:55:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L S A FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS <br />(9TH STREET TO 16TH STREET( PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />SANTA ANAL CALIFORNIA MAY 2020 <br />Fairview Street includes sidewalks on both sides of the street, with the exception of the segment on <br />the bridge. Fairview Street does not include any bicycle facilities, such as bicycle lanes. The proposed <br />Project would construct a complete bridge deck with barrier rails, sidewalks, bicycle lanes, a raised <br />median, and lighting to provide safe walkability and bicycle accommodations across the bridge <br />consistent with the goals and policies of the Circulation Element. <br />The Circulation Element also identifies Fairview Street as a planned widening project in Santa Ana. <br />The proposed Project includes replacing the existing four -lane bridge with a new six -lane bridge. <br />Therefore, the proposed Project is consistent with the goals and policies in the Circulation Element <br />and does not conflict with any plans applicable to the Project area and the proposed Project. <br />Therefore, the Project is consistent with any applicable land use plans, policies, or regulations <br />adopted for the purpose of avoiding or mitigating an environmental effect, and no impacts would <br />occur. No mitigation is required. <br />3-68 7 rj Bm402D\Final ISMND\Fairview Street Bridge Final ISMND.doC. (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.