My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
6/12/2020 2:55:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L S A FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS <br />(9TH STREET TO 16TH STREET( PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />SANTA ANAL CALIFORNIA MAY 2020 <br />Project area as a mineral resource zone.43 No other City planning documents identify any locally <br />important mineral resources in the vicinity of the proposed Project. The Project area is located <br />within a developed urban area and does not support mineral extraction operations. Therefore, no <br />impacts related to the loss of availability of a known mineral resource that would be of value to the <br />region and the residents of the State would result from Project implementation. No mitigation is <br />required. <br />b. Would the project result in the loss of availability of a locally -important mineral resource <br />recovery site delineated on a local general plan, specific plan or other land use plan? <br />No Impact. As discussed above, the City's General Plan Conservation Element and the County's <br />Resources Element do not identify any locally important mineral resources in the vicinity of the <br />proposed Project. The proposed Project would not result in the loss of a locally important mineral <br />resource. Therefore, no impacts related to the loss of availability of a locally important mineral <br />resource recovery site delineated on a local general plan, specific plan, or other land use plan would <br />result from Project implementation. No mitigation is required. <br />43 County of Orange. 2012a. Orange County General Plan ChapterV1. Resources Element. <br />3-70 75BlR "D\Final ISMND\Fairview Street Bridge Final ISMND.docx(OS/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.