Laserfiche WebLink
NT <br />MENTS <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEW BPIOGE REVLACEM REST TO STREET BEET) PROJECT <br />L S A <br />MAY 2020 (9Tx STREET To ANTx STREET) L, OLEGT <br />SANTA ANAL CALIFOPHIA <br />• Advance notice to the public and local emergency service <br />providers regarding the timing, location, and duration of <br />construction activities. <br />• Procedures for coordination with OC Parks to ensure <br />appropriate bicycle/pedestrian detour routes and ensure <br />appropriate signage is provided to display the dates of the <br />closures and to identify the detour routes <br />• Procedures for coordination with emergency service providers <br />to minimize temporary delays in emergency response times. <br />Such coordination could include the identification of alternative <br />routes for emergency vehicles and routes across the <br />construction area. <br />Mitigation Measure TR-2 Fairview Street/Civic Center Drive Intersection LOS Monitoring. As <br />part of the City's annual review of its Capital Improvement Program, <br />the City Traffic Engineer will evaluate the function of the <br />intersection of Fairview Street and Civic Center Drive to ensure that <br />it operates at adequate level of service (LOS). If LOS is deficient, the <br />City will restripe the westbound shared left -through turn lane to a <br />shared left -through -right turn lane. <br />R:\WKE1702\ISMND\Fina1 ISMND\Fairview Street Bridge Final ISMN7,63B /40I 37 3-103 <br />